ESTIMATE
ESTIMATE
12
2 62.4 52416 93.6 78624
3 112.32 94348.8 187.2 157248
360,565.92 449,673.12
1 9 0.04 0.36
3 0.12 3.24 124.8
5 0.2 9
0.36 12.6
1 748.8 175968
3 74.88 62899.2
5 124.8 104832
1 7.29 343,699.20
2 0.5
3 0.9 124.8
5cu.m. 192.192
0.1111111111 1 768.768
unit wt cement 1440 3 2306.304 bags
5 3843.84 bags
9
1 998.4 234624
3 81.12 68140.8
5 112.32 94348.8
397,113.60
105
630 68.25 105
165060 78487.5 131250 374797.5
total volume 124.8 cu.m 2.88 8
2.777778 10000
384797.5
1 3/4 plywood 3
3 hinges 8 560000
5 175202.5
1 cu.m
= 27 bags of gravel
0.666667
1 9 bags
2 18 bags 0.666667 18
3 27 bags 1
1 5.4 bags 6
3 16.2 bags 0.6
5 27 bags 1
List of Materials for the project Asphalt Plant