ESTIMATE

Uploaded by

Carlo Ras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

1 909.792 213801.12 909.792 213801.

12
2 62.4 52416 93.6 78624
3 112.32 94348.8 187.2 157248
360,565.92 449,673.12

1 9 0.04 0.36
3 0.12 3.24 124.8
5 0.2 9
0.36 12.6
1 748.8 175968
3 74.88 62899.2
5 124.8 104832
1 7.29 343,699.20
2 0.5
3 0.9 124.8

5cu.m. 192.192
0.1111111111 1 768.768
unit wt cement 1440 3 2306.304 bags
5 3843.84 bags
9

1 998.4 234624
3 81.12 68140.8
5 112.32 94348.8
397,113.60
105
630 68.25 105
165060 78487.5 131250 374797.5
total volume 124.8 cu.m 2.88 8
2.777778 10000
384797.5
1 3/4 plywood 3
3 hinges 8 560000
5 175202.5

1 cu.m
= 27 bags of gravel
0.666667
1 9 bags
2 18 bags 0.666667 18
3 27 bags 1

1 5.4 bags 6
3 16.2 bags 0.6
5 27 bags 1
List of Materials for the project Asphalt Plant

Name of materials/equip Quantity Unit


nylon string 10 roll
shovel 5 pcs.
digging bar 5 pcs.
2"x2"x16' cocolumber 5 pcs. 25 18
backhoe 1 unit 50 18
4.5