Lateral Loads On Piles
Lateral Loads On Piles
P.J.KRUGER 3/3/2020
PROJECT No. SUBCODE CALC. No. DESIGNER CHECKED DATE
PILE DIAMETER = d m
PILE CONCRETE = fcu MPa
MODULUS OF SUBGRADE REACTION = k kN/sqm/m
YOUNGS MODULUS = Ec MPa
Mo
H
V = H*e(-bx)*(Sinbx-Cosbx) V = Mo*2*b*e(-bx)*Sinbx
H*e(-bx)*Sinbx M = Mo*e(-bx)*(Cosbx+Sinbx)
M=
b
Mo*2*b2*e(-bx)*(Cosbx-Sinbx)
y=
H*2*b*e (-bx)
*Cosbx k*d
y=
k*d
1.10
1.00 M=Mo
0.90
0.80 y=2bH/kd
FACTOR
0.70
0.60 M=bH
0.50 V=2bMo
0.40
0.30
0.20
0.10
0.00
-0.10
-0.20
-0.30
-0.40
-0.50
-0.60 V=H
-0.70
-0.80
y=2b^2*Mo/kd
-0.90
-1.00
-1.10
0 2 4 6 8 1 2 4 6 8 2 2 4 6 8 3 2 4 6 8 4
0. 0. 0. 0. 1. 1. 1. 1. 2. 2. 2. 2. 3. 3. 3. 3.
BETA *X
1.10
1.00 M=Mo
0.90
0.80 y=2bH/kd
FACTOR
0.70
0.60 M=bH
0.50 V=2bMo
0.40
0.30
0.20
0.10
0.00
-0.10
-0.20
-0.30
-0.40
-0.50
-0.60 V=H
-0.70
-0.80
y=2b^2*Mo/kd
-0.90
-1.00
-1.10
0 2 4 6 8 1 2 4 6 8 2 2 4 6 8 3 2 4 6 8 4
0. 0. 0. 0. 1. 1. 1. 1. 2. 2. 2. 2. 3. 3. 3. 3.
BETA *X
SHEET 1 OF 1
Graph calculations
0.800
0.750
0.700
0.650
0.600
0.550
0.500
0.450
0.400
0.350
0.300
0.250
0.200
0.150
0.100
110000
100000
120000
130000
170000
180000
140000
150000
160000
190000
200000
0.150
0.100
Graph calculations
0.050 Diameters from 450 to 1650 in steps of 150
0.000
10000
20000
30000
40000
50000
60000
70000
80000
90000
110000
100000
120000
130000
170000
180000
140000
150000
160000
190000
200000
MODULUS OF SUBGRADE REACTION kN/sqm/m
Page 4
Graph calculations
Page 5