100% found this document useful (2 votes)
1K views

Client Acceptance and Sign Off Form

This form is used to get client sign-off once a project is completed. It lists the project deliverables and acceptance criteria. The client rates each deliverable and confirms whether acceptance criteria are met. The client can then approve the project, approve with conditions, or note any outstanding issues. Once signed, the form confirms client acceptance of the completed project deliverables.

Uploaded by

Rajan
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views

Client Acceptance and Sign Off Form

This form is used to get client sign-off once a project is completed. It lists the project deliverables and acceptance criteria. The client rates each deliverable and confirms whether acceptance criteria are met. The client can then approve the project, approve with conditions, or note any outstanding issues. Once signed, the form confirms client acceptance of the completed project deliverables.

Uploaded by

Rajan
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Controlled copy Client Acceptance and Sign-Off Form

Client Acceptance and Sign-Off Form


<< Use this document to get the client’s sign-off once the project is completed >>

Client Name :

Project ID :

Project Name :

Reference to SOW/any other document :

The project deliverables have been validated against the acceptance criteria, defined as per the
document mentioned above. It is hereby confirmed that the following deliverables adhere to stated
requirements and are treated as fully accepted.

Stage Deliverables

Please rate the deliverables for this Stage from 1 (Poor) to 3 (Excellent)

Deliverable Name Completeness (1- Accuracy (1- Adequacy(1-3) Comments


3) 3)

List stage
deliverables

Stage Exit Criteria Pass (P)/ Comment


Not Pass
List stage (NP)
acceptance criteria

List of deliverables and the corresponding versions as per SOW:

1.

2.

3.

Project ID: <Project ID. >

Release ID: QTDM-CLSGOFF.doc / 1.0 /30.09.2005 C3: Protected


Controlled copy Client Acceptance and Sign-Off Form

Approve

Approve with conditions Explanations, Caveats or Conditions

Outstanding Issues (If any) and plan for resolution:

Remarks (if any):

Date of Project Closure:

Role Name Signature

Client Project Manager

Cognizant Project Manager

Project Team Leader

Project ID: <Project ID. >

Release ID: QTDM-CLSGOFF.doc / 1.0 /30.09.2005 C3: Protected

You might also like