Procedure - Scaffold
Procedure - Scaffold
SCAFFOLDING PROCEDURE
1. POLICY
2. PURPOSE
To ensure that any scaffold is of the correct type, design and suitable for the
intended location and erected by competent persons. That once erected it will
be inspected and maintained to the same standard as it was built.
3. SCOPE
This policy also covers employees of client, contractor or outside agency that
work at any company installations or facility.
4. PROCEDURE
recommendations. Any deviation from this procedure must be addressed to Deleted: shall
the Rig Manager Procedure and to be approved prior to commencing Deleted: with an exemption that
scaffolding operations. Deleted: is
Deleted:
Installation staff may erect System scaffolding if the following Deleted: Layher
conditions are met: Deleted: to
Deleted: both two and three lifts
Limited to a scaffold of 1 x lift and 1 x working lift : only
The personnel erecting the scaffold have successfully completed the Formatted: Indent: Left: 36 pt
Transocean approved Training Programme (See Training HSE Sec 4.1.3) and Formatted: Bullets and Numbering
the manufacturer’s instructions are adhered to. Deleted:
Formatted: Font: (Default) Arial,
Prior to commencing any scaffold task the THINK planning process must be Font color: Black
utilized to identify the appropriate level of THINK plan to be used for each Deleted: two Lifts
individual task. THINK Plans must include rescue plan for height and where Deleted: Interactive
appropriate confined space rescue plan. The use of a permit to work is to be
Deleted: manufacturers
considered if scaffold is to be erected where there is a hazard of falling
Formatted: Tabs: 243 pt, Left
overboard or use of scaffold in a confined space.
Deleted: ¶
SCAFFOLDING PROCEDURE
NOTE: When working at a height of over two meters, all personnel shall always wear a
safety harness and line anchored to a secure point on the Installation.
4.1 TRAINING
The OIM can only approve permanent rig based personnel as competent if
they have successfully completed as a minimum the following training as per
their requirement and competency; a copy of the valid certificate is available
on the installation:
SCAFFOLDING PROCEDURE
The aforementioned courses are examples and purposely flexible to allow the
use of various training schools. The Rig Manager, Performance should
consider the above examples before approving a relevant training request.
The training courses will invariably be based on “tube and fitting” scaffold
equipment. This does not qualify any rig based personnel to erect “tube and
fitting” scaffold. The only scaffold the rig based personnel will be allowed to
erect is the “system scaffold” type, also known as prefabricated aluminum
alloy scaffolding (Kwikstage, Layher, H-Frames, etc.).
The equipment supplier’s training material (DVD, etc.) and user manual shall
be obtained when procuring the equipment and kept within the installation’s
training library. This material will be studied by the Scaffold Competent
Person to ensure familiarity with the scaffolding equipment before erecting it.
All persons involved in erecting and dismantling of scaffolding must complete Deleted: working on
the Transocean approved and manufacturer supplied training prior to using
scaffolding components. Deleted: to working on the
Deleted: .
SCAFFOLDING PROCEDURE
5. RESPONSIBILITIES Deleted: ¶
¶
¶
5.1 ALL PERSONNEL ¶
¶
• Utilize company approved scaffold structures, inspected by approved, ¶
• Utilize company approved method of fall protection when working at an Formatted: Bullets and Numbering
elevated position that is more than 6.7ft (2 m) above the normal working
Deleted:
surface and where any fall hazards exists.
SCAFFOLDING PROCEDURE
SCAFFOLDING PROCEDURE
Deleted: ¶
¶
¶
APPROVAL ¶
¶
¶
¶
SCAFFOLDING PROCEDURE
Table of Revisions
PERSON
CHANGE DATE DESCRIPTION OF
MAKING THE POSITION
NO. ENTERED CHANGE
CHANGE
REFERENCES