JSA For Flange Alignment

This JSA document outlines the hazards and control measures for performing an alignment check at Nghi Son Refinery and Petrochemical Limited Liability Company. The key hazards identified include falls from height, physical injuries from improper use of hand tools, ergonomic issues from manual handling, fire or explosion from leaks of toxic gases, and slips, trips, and falls. Control measures specified include using fall protection when working at height, selecting the nearest muster point, ensuring tools are in good condition, following safe manual handling techniques, and maintaining good communication.

Uploaded by

Hưởng Phạm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views

JSA For Flange Alignment

This JSA document outlines the hazards and control measures for performing an alignment check at Nghi Son Refinery and Petrochemical Limited Liability Company. The key hazards identified include falls from height, physical injuries from improper use of hand tools, ergonomic issues from manual handling, fire or explosion from leaks of toxic gases, and slips, trips, and falls. Control measures specified include using fall protection when working at height, selecting the nearest muster point, ensuring tools are in good condition, following safe manual handling techniques, and maintaining good communication.

Uploaded by

Hưởng Phạm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Nghi Son Refinery and Petrochemical Limited Liability Company

Company : AMECC/MEGARIG Date :


ACTIVITY: Alignment check JSA No. :
Work Location / Area PTW Number
Equipment’s / Material Hand tools
& Tools Used :

NO. Activity Hazard Impact Control Measures Action By


P E A R
1. Pre-Task Preparation  Noncompliance of NSRP-HSSE Procedures.  Obtain a Valid PTW with relevant certificates.
 Conduct START Meeting to inform the workers of the task Supervisor
 Unauthorized work
descriptions. Workers
 Lack of Communication M M  Discuss START in dual language for clear
 Non-compliance understanding as required.
 All team members must have the necessary NSRP
Trainings
 Use all Mandatory PPE.
 Maintain good communication with all team members.

2. Selecting Closer & Safe  Fire, Explosion, Toxic gas leak, Slips, trips,  Identify the nearest Muster Point.
Muster Point / Emergency Falls, Unsafe selection of muster point.  Ensure all personnel are aware of Safe & nearest Muster Supervisor
Response / Evacuation  Evacuation access route blocked. Point. Workers
Route. M
 Change in wind direction.  Emergency Contact No. 02378738541
 Poor communication with ERT  Plant Telephone: 6700 / 6701
 Obstruction in access for ERT  Wind direction to be monitored from the nearest visible
wind sock.

4. Use of Hand Tools


 Physical Injuries M  Ensure all tools are good condition. Supervisors/
 Don’t place fingers in pinch points. Workers
 Use the right tools for the right job.
 Pinch points  Do not use damaged or handmade tools.
 Tools should not be left lying around.
 Slips/trips/falls hazard  Ensure all wires and cables are properly insulated
 Only Authorized and trained personnel are allowed to
 Improper handling of hand tools operate special tools and equipment.

1
Nghi Son Refinery and Petrochemical Limited Liability Company
 Electric Shock

5. Manual Handling
 Ergonomic Problems. Supervisor /
 Follow NSRP manual handling procedure. Workers
 Pinch point and obstructions.
L L L  Use Buddy system for manual lifting.
 Physical Injuries.  Follow safe manual handling Technique.
 Keep the load close to the body as much as possible.
 Slips/trips/falls hazard.
 Keep the body in a comfortable/correct position
 Improper handling of Load.
 Don’t place fingers in a pinch point.
 Use Specific PPE’s.
 Ensure access & egress are clear from obstructions.

6. Work at Height Supervisor


 Fall from Height Workers
 Falling object H L H
 Wear safety harness and 100% tie-off Technician
 Ensure 3-point contact when accessing ladders.
 Ensure access & egress are clear from obstructions
 Secure all loose materials.
 All hand tools shall be equipped with restraint ropes.
 Proper housekeeping in work area
 Ensure drop zone is barricaded and with Watchman.

Remarks:
P: Person, E: Environment, A: Assets, R: Reputation, L: Likelihood, S: Severity, RC: Record.
JSA Prepared by JSA Reviewed by JSA Verified by Mr.
Name: Name: Name:
Signature: Signature: Signature:

2
Nghi Son Refinery and Petrochemical Limited Liability Company
JSA Checklist
JSA Work Details and checklists
Date: Job Title: Alignment Check JSA Ref #
Description of Work: Alignment Permit # (If applicable):
Originator:
(A) Identify Potential Hazards for The JOB
Hazard Prompt List (Review the job steps and identify if any of the following hazards are applicable) Potential Hazard Exposure Mechanisms
□ Electricity □ Weather □ Excavations/ Earthworks □ Struck – by, against
□ Hot/ Cold Objects □ Insect/ Animal Bites □ Fire □ Contact with
□ Rotating Equipment □ Lighting □ Introduction of Non Native Species □ Contacted by
□ Vehicles □ Driving Hazards □ Harm to Flora/ fauna □ Caught – in, on, Under, between, against
□ Muscular Stress X Falling Objects □ Historical Sites □ Exposure – temperature, chemicals, noise, dust
□ Mental Stress □ Noise □ Vegetation Clearing X Slip, Trip or Fall – from heights, same level
□ Repetitive Work □ Radiation X Spills/ Leaks X Complete Manual Handling Risk Assessment attached
X Heights X Hydrocarbon/ Gas Release □ Other Mobile/ Stationary Equipment □ Overexertion/ excessive force – lifting, pushing, pulling,
□ Lone Worker □ Surfaces X Pressure (Stored Energy) □ Escape of Material – oil spill, gas release, light spill
□ Vibration X Tools/ Equipment □ Fumes/ Vapour/Dust □ Human Factors
□ Moving Objects □ Human Factors □ Light Spill
□ Confined Spaces □ Off Road □ Depths
□ Asbestos □ Chemicals □ Other (List additional Hazards below)
Personal Protective Equipment
X Eye/Face protection □ Hearing protection □ Respiratory protection X Weather conditions
X Head protection □ Safety/Rescue line X Safety harness
•hot/dry
X Foot protection X Hand protection □ Gas detector •wet
X Body protection □ Spill prevention and clean up □ Light shields •windy
• cold
□ Other

3
Nghi Son Refinery and Petrochemical Limited Liability Company

SWMS & JSA Meeting Form


SWMS/JSA MEETING FORM
Work Title: : Alignment check.
PTW No: Date:
PTW Requester : Name/Signature:

A. Subject Discussed

1 Adjacent works
2 Work at Height
3 Manual Handling.
4 Housekeeping
B. Attendance List
Name Div./ Section Position Signature
1
2
3
4
5
6
7
8
C. Feedback
1. Adjacent activities to be considered.

2. Conflicting activities to be discussed & Prioritized.

4
Nghi Son Refinery and Petrochemical Limited Liability Company

Safe Work Method Statement No. TITLE: Alignment check DATE:

Apply Permit to Work with Relevant attachments & certificates.


1.0 Scope 1.1
To complete the activity of Bolt cleaning Works
2.0 References 2.1 etc Contractor Document (VV3160-001-A-131 Rev 1) for Flange Face Repair by CR Asia

3.0 Responsibilities 3.1 etc JGCS JVTT / NSRP

4.0 Equipment 4.1 etc Hand tools

5.0 Materials 5.1 etc N/A

6.0 Resources 6.1 etc N/A

7.0 Procedure 7.1 etc As per attached procedure VV3160-001-A-131 Rev 1.

8.0 Safety 8.1 etc As per attached JSA

9.0 Attachments 9.1 etc JSA, Contractor SWMS (VV3160-001-A-131 Rev 1.)
Maintenance Section Approval
Prepared by: (Contractor) Checked by: (Maintenance)
Permit Requester Section Manager
Name

Signature

Date