Flare Tip Replacement and Flare Modifications

Flare tip replacement and modifications in the oil and gas industry involve replacing flare tips both onshore and offshore. A thorough inspection is conducted before engineering completes calculations to support the safest and most efficient solution within the required timeframe. Project execution combines access experience with light lifting equipment to replace flare tips up to 5 tons, using custom lifting solutions for heavier loads, with the on-site team working closely with engineering to optimize methods and equipment use.

Uploaded by

mnmsingam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
163 views

Flare Tip Replacement and Flare Modifications

Flare tip replacement and modifications in the oil and gas industry involve replacing flare tips both onshore and offshore. A thorough inspection is conducted before engineering completes calculations to support the safest and most efficient solution within the required timeframe. Project execution combines access experience with light lifting equipment to replace flare tips up to 5 tons, using custom lifting solutions for heavier loads, with the on-site team working closely with engineering to optimize methods and equipment use.

Uploaded by

mnmsingam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Flare tip replacement and flare modifications:-

OFFSHORE FLARE-TIP REPLACEMENT

FLARE-TIP REPLACEMENT IN THE OIL AND GAS INDUSTRY

OFFSHORE OIL AND GAS FLARE-TIP REPLACEMENT

We have executed a range of flare tip replacements both onshore and offshore in the
Oil & Gas industry. Our track record also includes flare boom modifications, the
replacement of flare platforms, installation of new flare lines and supports, inspection of
booms and towers, etc.

A thorough inspection of each site is performed before the project delivery phase starts.
Our engineering department then completes all the necessary calculations to support
our solution in the safest and most efficient way possible, always ensuring that the work
can be performed in the tight timescale usually afforded during the operational
shutdown.

The project execution phase combines our access experience with the use of light,
purpose made lifting equipment. Standard lifting solutions are available for flare tips up
to 5 tons, with tailor-made lifting equipment being used on request. Our on-site project
delivery team works always in close cooperation with our engineering department to
ensure we optimise both the methods and the use of lifting equipment.