100% found this document useful (2 votes)
1K views1 page

Quotation - FPPI PDF

Jeralf's Surveying Services provided a quotation to Filipinas Palmoil Plantations, Inc. for surveying work on several lots totaling 198,203 square meters in San Francisco, Agusan del Sur. The scope of work includes relocation surveying, monumentation, and producing a sketch plan. The total quoted cost is PHP 189,000, discounted to PHP 185,000, to be paid in three installments over the course of the project.

Uploaded by

Jayson Melgar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views1 page

Quotation - FPPI PDF

Jeralf's Surveying Services provided a quotation to Filipinas Palmoil Plantations, Inc. for surveying work on several lots totaling 198,203 square meters in San Francisco, Agusan del Sur. The scope of work includes relocation surveying, monumentation, and producing a sketch plan. The total quoted cost is PHP 189,000, discounted to PHP 185,000, to be paid in three installments over the course of the project.

Uploaded by

Jayson Melgar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

JERALF’S SURVEYING SERVICES

GARAME STREET, POBLACION, CABADBARAN CITY


Mobile No..:09128342815 / 09274072169
Email address: [email protected]

SUBJECT: SURVEY QUOTATION


FILIPINAS PALMOIL PLANTATIONS, INC.(FPPI)
LOCATION : Brgy. Mate, San Francisco, Agusan del Sur

SCOPE OF WORK:

1.) Relocation Survey


2.) Monumenting
3.) Sketch Plan

THE OFFERED COST OF THE SURVEY:


Relocation Survey
LOT 4-A = 58,872 SQ.M--------------------------------Php 40,000
LOT 4-B = 3,473 SQ.M--------------------------------Php 16,000
LOT 4-C = 63,366 SQ.M--------------------------------Php 42,000
LOT 4-D = 23,911 SQ.M--------------------------------Php 21,000
LOT 4-E = 2,438 SQ.M--------------------------------Php 16,000
LOT 4-F = 4,234 SQ.M--------------------------------Php 16,000
LOT 4-G = 41,909 SQ.M--------------------------------Php 38,000
TOTAL AREA=198,203 SQ.M or 19.8203 Hec. =Php 189,000

Total: Php 185,000 (Discounted)

MODE OF PAYMENTS:

- 30% of the Total Cost shall be paid upon signing of contract..


- 50% of the Total Cost shall be paid after actual ground survey.
- 20% of the Total Cost shall be paid upon delivery of the result plan

JERRY D. ALFARO JR., MGEI


GEODETIC ENGINEER

You might also like