The document provides a disciplinary procedure for employees working on an air separation plant project in Jazan, Saudi Arabia. It establishes that the procedure is applicable to all employees and subcontractors working on the project. The primary objective is to provide a safe work environment through enforcing safety policies and issuing disciplinary actions when violations occur. It outlines responsibilities for HR, HSE managers, and project management to implement the procedure. The procedure is intended to emphasize the gravity of safety violations and improve safety performance.

Uploaded by

SURESH NAIR
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
497 views

Disciplinary Procedure

The document provides a disciplinary procedure for employees working on an air separation plant project in Jazan, Saudi Arabia. It establishes that the procedure is applicable to all employees and subcontractors working on the project. The primary objective is to provide a safe work environment through enforcing safety policies and issuing disciplinary actions when violations occur. It outlines responsibilities for HR, HSE managers, and project management to implement the procedure. The procedure is intended to emphasize the gravity of safety violations and improve safety performance.

Uploaded by

SURESH NAIR
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

DOCUMENT / DRAWING

COMMENTS RESOLUTION SHEET (CRS)

Project Name: Jazan IGCC ASU Project No.: EN131528 Date: 25 JAN 2017

CONTRACTOR Transmittal Ref.: AP-TRANSMIT-004608 Date Received 02 DEC 2016

Document / Drawing Title: Disciplinary Procedure Document / Drawing Number: Rev. No.: Review Code:

Disciplinary Procedure EN131528-NSHC-EH-P06-0007 00 CODE 2

COMMENTS RESOLUTION
Sr. Page No. /
No. Contractor (AP) Comments Contractor/Sub-con/Vendor Response Status / Remarks
Sheet No.
Procedure fails to mention any
performance enhancement programs to
1 1 recalibrate expectations? Performance enhancement program added Closed
No mention of intervention process when
using AP SLT program.
what interventions will be taken for
both Employee and Supervisor.
2 5 Explained Closed
A commitment to make these
records available on request by AP.
only 1 category mentioned; what
makes up minor and what makes
3 5 up more than minor. Category of Violations listed Closed
Where is the fatal 5 list ?

Form No.: EN131528-AP-PJ-T02-0001 Rev. 00 (13 Mar. 2016) Page 1 of 1


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

Disciplinary Procedure

For an

Air Separation Plant


At

Jazan IGCC, Saudi Arabia

AP REVIEW STAMP
CODE 1: Reviewed by Air Products - REJECTED Resubmit for
Review.
By Moosa Mahomed at 10:56 am, Jan 26, 2017
CODE 2: Reviewed by Air Products – COMMENTS AS NOTED,
Resubmit for Review.
CODE 4: Reviewed by Air Products – NO COMMENTS, No
Further Submittal Required Unless Drawing/Document is Revised.

CODE 5: ACCEPTED FOR INFORMATION ONLY

Contractor/Sub-Contractor/Vendor are not relieved of their responsibilities for accuracy


of dimensions, performance, design, design of details or any code requirement.
Further, review by Air Products does not relieve Contractor/Sub-Contractor/Vendor of
responsibilities or liabilities, or from furnishing material in conformance with the
By Bobby Mole at 7:32 am, Jan 26, 2017 contract, purchase order, or other agreement. Air Products’ review shall not be
construed as an Approval by Air Products of such documents or an opinion by Air
Products that such documents are true and accurate.

By SHAUN KENT at 4:40 pm, Jan 26, 2017


Specifier: …………………...…………. Date: ………...………………….
By Brian Doherty at 2:02 pm, Feb 09, 2017

By Lukasz Gedlek at 6:59 am, Feb 05, 2017

Air Products Project No: EN-13-1528

REVISION HISTORY

Rev Pages Date Description Issued by Checked Approved


00 07 21/11/2016 Issue for Review HER GVM CGR
01 10 25/01/2017 Issue for Review APC GVM CGR

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 1 of 10


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

PURPOSE

The purpose of this policy is to support the enforcement of good safety performance
and to eliminate repeated or continuing safety violations by the use of appropriate
disciplinary measures. A subsequent tie up with AP safety license program provided
for the disciplinary procedure for all employees to suit the new circumstances and
project requirements.

SCOPE AND OBJECTIVES

This document is applicable to all NSH employees including any sub-contractors


under NSH.
The primary objective of the company safety program is to provide a safe work
environment for all employees. Safety Induction will be given to all employees
explaining all safety procedures and instructions for the ASU project including
disciplinary procedures to all employees prior to assigning them to project. Managers
or supervisors are required to issue appropriate specific safety instructions and safe
work methods to all employees prior to assigning them work.

Managers or supervisors are responsible for coordinating work with other supervisors
in the work area to ensure that all work can be accomplished safely. Each employee
is individually responsible for complying with each of the provisions of the Safety
Program.

When Safety Policies and Procedures are violated or individuals continue to be


involved in accidents or infractions, disciplinary action must be considered, in order
to emphasize the gravity of the situation and bring about desired improvement.

AFFECTS

All employees and sub-contractors providing services on the ASU project.

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 2 of 10


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

GENERAL

Every employee of subcontractor and lower-tier subcontractor is considered a


valuable asset, and therefore must be afforded the opportunity to be informed of
Project and HSE expectations and requirements relative to their behaviour and
performance on the project.
This procedure provides a framework for utilization by all concerned personnel or
other person(s) behaviour, and safety performance dictates a disciplinary action.

This not intended to be viewed or administered as an inflexible formula that results


in discipline that would effectively remove a supervisor's discretionary authority in
all cases. It will be administered fairly and consistently with regard to all personnel,
regardless of position and seniority.

Any disciplinary action shall be administered in accordance with company policy,


project policy and local labour laws & practices.

RESPONSIBILITIES
HR Department is fully responsible to select experienced qualified workers who are
able to perform their duties safely.
HSE Manager shall be responsible for advising the corporate management on the
formulation, administration and revision of the HSE policies and disciplinary
procedures.
The Project Management is ultimately responsible for the implementation of the
Disciplinary Procedures.

Managers, Unit Managers are responsible for coordinating work with other supervisors
in the work area to ensure that all work can be accomplished safely. Any unsafe

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 3 of 10


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

practices done by his sub ordinates will be taken into action according to this
procedure.
HSE Trainer is responsible to give adequate training for all employees working at
site.
HSE officers are responsible to advice all employees on project safety requirements
and procedures on site and to monitor them whether they are violating or not. If
they are violating any safety rules, implement the disciplinary actions as described in
this procedure.
Each employee is individually responsible for complying with each of the provisions
of the Safety Program.
Examples of conduct which may lead to disciplinary action under this procedure
include but not limited to:
Unsatisfactory attendance record (Absenteeism)

Poor work standards (Quality and Quantity of work)


Breach of health and safety rules (Security violation, Traffic violation etc)
Bullying, fighting, harassment
Refusal to obey reasonable instructions
Negligence
Abuse of client

Insubordination
Improper language
Intoxication or drinking

SEQUENCE OF GIVING DISCIPLINARY ACTION

Every effort will be made by the employee’s immediate supervisor/manager or HSE

personnel in charge to address shortcomings in work standards or violating the rules,

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 4 of 10


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

conduct or attendance through informal counselling without invoking the disciplinary

procedure. When an employee commits safety violation, he shall be given verbal

warning (without written letter). When the offense is considered more than minor,

the supervisor will give the employee a Disciplinary Letter as First Offense and will

collect his safety licence and inform Air Products to put two negative points.

On the first offense, the employee will be given lessons learned by the supervisor
and/or safety officer. A disciplinary letter shall be served.

On the second offense (even on different offense), a Final Warning Offense shall be
given and will put 3 more negative points on safety license from Air Products. As per
the seriousness of the violation there will be some penalties considered beyond
warnings such as day or days in camp without pay.

The next violation shall mean removal or termination from site. The employee shall
be given Discipline Letter with Dismissal penalty along with five more negative points
by Air Products. He shall be accorded due process to let himself explain verbally and
in writing.

An employee can also be given Discipline Letter related to an incident where he is


involved if mandated as one of the corrected actions.

On some serious offenses, an investigation shall be called to all involved employees.

Individual written statements shall be taken to document the disciplinary action.

If the violation is one of the listed in “5 fatal safety absolutes”, the penalty is
removal from site if found guilty of the violation.

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 5 of 10


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

Excellent attitude and adherence to standards by the offender on upcoming periods


will be considered as positive attitude and will recommend the AP HSE team for
reward and give positive points on safety license.

DISCIPLINARY LETTER

The disciplinary letter is a written document to record the offense of an employee.

The discipline letter shall contain the following details;

• The date warning was given


• Supervisor of offending employee
• Job title of the immediate supervisor
• Department of the involved employee
• Name of offending employee with NSH ID no.
• Job title of the offending employee
• Site where the violation happened
• Type of offenses the employee committed
• Description of the violation or offense
• Penalty or No. of Offense (to be filled in HSE department
• Date when the violation or offense happened
• Time of the violation or offense
• Specific location where the violation or offense happened
• Immediate supervisor’s explanation and signature
• Offending employee explanation and signature
• Approval signatures of the disciplinary action (Const. Manager, HSE
Manager and Project Manager)

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 6 of 10


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

RECORDING AND CONSEQUENCES

 Hard copy files of discipline letters are kept in HSE Department.


 The database file is ready to be shared with the Contractor upon request.
 Offending employees shall not qualify the safety recognition and awards
program for earlier than the period of six months.
 Offending employees can join the monthly safety observation awards.
 Supervisors with more than three offender employees in a month shall not
qualify for the safe supervisors of the month.
 Supervisors with three offender employees shall not receive the entitled
monthly allowance/incentives.

CATEGORY OF OFFENSES AND VIOLATIONS

“Zero Tolerance Offenses” – suspected employee(s) violating the “Zero Tolerance


Policy” shall be suspended from work until investigation is completed. Maximum
penalty can be removal from site.

• Not wearing personal protective equipment (PPE) at work site


• Minor traffic violation (wrong parking)
• Blocking of emergency equipment or exits
• Using unapproved scaffolding
• Not keeping proper housekeeping
• Not discharging/handling/storing/transporting effluents/wastes as per the
guidelines
• Failure to barricade hazardous activity.
• Other violations that may be classified as under the Zero Tolerance policy,
that will be determined by the HSE department.

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 7 of 10


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

The following are examples of serious violations


• Theft
• Deliberate damage to property
• Fraud or deliberate falsification of documents
• Gross negligence or dereliction of duties
• Gross insubordination
• Incapacity to perform duties due to being under the influence of
alcohol, prescribed drugs or misuse of prescribed medication
• Serious breach of health and safety rules
• Serious breaches of confidentiality
• Serious bullying, sexual harassment or harassment
• Smoking in no-smoking areas.
• Fighting or physical assault with other employees.
• Permit to Work violation or Working without Permit.
• Unauthorized erection, modification or dismantling of scaffold.
• Unauthorized removal of grating floor.

AP’s SAFETY LICENSE PROGRAM

NSH employees or Subcontractor employees, those working under ASU project is


cover all the rules and regulation of AP’s Safety License Program. If any said
employees attained 10 punches in their Safety license card, they will terminate from
the ASU project immediately.

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 8 of 10


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

THE RIGHT TO APPEAL

If the employee wishes to appeal against any NSH disciplinary decision, they must
appeal, in writing, within five working days of being notified of the decision. An
investigation will be conducted by HSE and Employee representative who are
acceptable to both parties.
The offender will be requested to attend a meeting to hear the precise details of
the violation at the earliest juncture and without undue delay. The employee will be
advised of his right to be accompanied at this meeting by a representative or work
colleague.

PROTECTIVE MEASURES

Reassigning the employee to other duties


Providing an appropriate level of supervision
Putting the employee off duty with pay

The views of the employee will be taken into consideration when determining the
appropriate protective measures to take in the circumstances but the final decision
rests with management.

Putting the employee off duty pending the outcome of the investigation will be
reserved for only the most exceptional of circumstances. The employee concerned
will be advised that the decision to put him/her off duty is a precautionary measure
and not a disciplinary sanction or an indication of guilt.

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 9 of 10


Project Document Number: EN131528-NSHC-EH-P06-0007
Release Purpose: IFR Rev: 01
STAC Document Number: NA

Contractor/Vendor Doc No. / Rev No.: NSH-AP-ASU-DOC-0007

This document contains information that is PROPRIETARY to Air Products and Chemicals, Inc. and its subsidiaries or affiliates.
This document or its contents may not be copied or disclosed to others without Air Products’ written permission.

Form Ref.: EN131528-AP-PJ-T02-0005 Rev.:00 (01/05/2016) Page 10 of 10