Introduction
- Load flow study is carried out by performing load flow simulations and result analysis.
- Load flow simulations are the most common computational procedures in network planning,
design and operation of power systems.
- Given the network topology, load demands at all supply points, and generation dispatches,
load flow simulations are performed to determine power flow on circuits and transformers
and voltage profile at all buses across the network.
- [I] is the vector of total positive sequence currents flowing into the buses or nodes
- [P] is the vector of active power into the network
- [Q] is the vector of reactive power into the network
- [V] is the vector of total positive sequence voltages at the buses or nodes
- [Y] is the network admittance matrix
- n is the total number of buses or nodes in the system
1 Pi jQi i 1 N
( m 1)
Vi (m)
*( m 1)
Yii Vi
Y V
ik k
(m)
Y V
ik k , i 1,2,....N 1
k 1 k i 1
- N is the number of bus-bars or nodes in the system and the slack bus is node N
- m is present iteration number
- i and k are node indexes
- V* is the complex conjugate of V
- Pi, Qi are the specified active power and reactive power at bus i, except for the slack bus
P P
P V , i( m ) i( 0) i( m )
Q Q Q V ( m ) ( 0) ( m ) , i 1,2,....N 1
Vi Vi Vi
V
Table of Contents
Capacity Building to the
Bangladesh
Power Sector
Switched shunts
Total Blk 1 Bstep Blk 2 Bstep Blk 3 Bstep
Locations Type Blk 1 Steps Blk 2 Steps Blk 3 Steps
Installation (Mvar) (Mvar) (Mvar)
PS1_TV 11.000 3x6 MVAr C-Banks 1 6 1 6 1 6
SS1_TV 33.000 3X10 MVAr C-Banks 1 10 1 10 1 10
xxx.sav
Project undertaken by a consortium led
29 by Ricardo Energy & Environment
29
Load Flow Study Examples - Session 2
Load flow input data (.raw file) for the study case
- Case identification data
- Bus data
- Load data
- Generator data
- Branch data (circuit data)
- Transformer data
- Switched shunt data
Key notes:
- Information required:
- Case ID, MVA Base,
Bus Data
Capacity Building to the
Bangladesh
Power Sector
Bus Number Bus Name Base kV Area Number/Name Zone Number/Name Owner Number/Name Code Voltage (pu) Angle (deg)
1000 GEN_01 16 1 1 1 2 1 0
Key notes:
- Information required:
o Bus Number, Base voltage, Bus type or Code
o Bus number shall be unique across the system
o Bus Name, Area Number, Zone Number, Owner Number, Initial Voltage and Angle
Branch Data
Capacity Building to the
Bangladesh
Power Sector
From Bus To Bus Line R Line X Charging In Rate A (I as Rate B (I as Rate C (I as Line G From Line B From Line G To Line B To
Number Number Id (pu) (pu) (pu) Service MVA) MVA) MVA) (pu) (pu) (pu) (pu)
1030 1050 1 0.00756 0.06156 0.18696 1 774 673 592 0 0 0 0
1030, 1050, '1 ', 0.00756, 0.06156, 0.18696, 774.00, 673.00, 592.00, 0.00000, 0.00000, 0.00000, 0.00000, 1
Key notes:
- Information required:
o From Bus, To Bus, Id, Line R, Line X and Line B, In service status, Rate A, Rate B, Rate C
Key notes:
- Winding 1 side shall normally be the side with tap changer
- Per unit system potentially used for transformer impedance calculation
- Transformer tap changer applied to control voltage at the specified point or control power
flow if it is a phase shifting transformer
- Defaulted values
Generator Data
Capacity Building to the
Bangladesh
Power Sector
Remote
Bus VSched In Pgen Pmax Pmin Qgen Qmax Qmin Mbase
Id Bus
Number (pu) Service (MW) (MW) (MW) (Mvar) (Mvar) (Mvar) (MVA)
Number
1000 1 1 0 1 200 200 0 47 130.15 -77.14 247
Key notes:
- Information required:
- Bus Number, Id, In service, Pgen, Qgen, Mbase
Key notes:
- Information required:
- Bus Number, Id, In service, Pload, Qload
Key notes:
- Information required:
- Bus Number, In service, Blk steps, MVAr in each step
Load flow solution interface: check data, change parameter and run simulation
Load flow parameters and solutions Data checking and LF output reports
Table of Contents
Capacity Building to the
Bangladesh
Power Sector
Area 2
Area 1
Area 1
Generation re-dispatch
- Share the MW output of the generator that is lost due to outage
- Change active power output of relevant generators
Contingency List
Capacity Building to the
Bangladesh
Power Sector
Key notes
- The outage of a circuit shall represent a actual circuit with CBs connected to the ends
- Duplicated outages shall be removed from the outage list, for example a generator and the
generation transformer
Key Notes
- The same simulations may need to run twice in order to calculate voltage step change due to
lock of tap position of transformers
- Applicable to a special case to verify the simulation results
Key Notes
- The same simulations may need to perform twice in order to calculate voltage step change
- Loading condition of network components is checked for the case without locking tap
position and allowing remedial actions taken already.
- Applicable to scanning security of the system
Contingency simulations
- Performed based on the given operational scenario (XXX.raw, or XXX.sav)
- Another three files (XXX.con, XXX.mon, and XXX.sub) taken as the inputs
- ACCC simulation results saved in the XXX.acc file
XXX.raw
or XXX.sav
XXX.con
XXX.mon XXX.acc
PSSE Engine
XXX.sub
CONTINGENCY CEDA1_OTHM1 /contingency 'indian queens - credacott (cedar) - otterham wf - pyworthy g3'
OPEN BUS 9936
OPEN BUS 9931
OPEN BUS 8483
END
SYSTEM TEST_66
KV 66
END
SYSTEM TEST_33
KV 33
END
END
Simulation Results
– The results present the voltages on all buses and flows on all branches (as specified in the
MON file). Any violations are also listed.
1080 GEN_05 20 1100 SS3_HV 230 1 PS1 2W TX2 429.80 429.80 360.00 119.39
1080 GEN_05 20 1100 SS3_HV 230 1 PS1 2W TX3 429.80 429.80 360.00 119.39
1080 GEN_05 20 1100 SS3_HV 230 1 SS3 2W TX1 541.00 541.00 360.00 150.28
1080 GEN_05 20 1100 SS3_HV 230 1 SS3 LOADOUT 551.57 551.57 360.00 153.21
1080 GEN_05 20 1100 SS3_HV 230 1 PS1 2W TX2 429.80 429.80 360.00 119.39
1080 GEN_05 20 1100 SS3_HV 230 1 PS1 2W TX3 429.80 429.80 360.00 119.39
1080 GEN_05 20 1100 SS3_HV 230 1 SS3 2W TX1 541.00 541.00 360.00 150.28
1080 GEN_05 20 1100 SS3_HV 230 1 SS3 LOADOUT 551.57 551.57 360.00 153.21
The table summarises the exceedance in branch loadings when the flow capacity of the
branch is exceeded due to the applied contingencies.
Non-converged LF Cases
Capacity Building to the
Bangladesh
Power Sector
Table of Contents
Capacity Building to the
Bangladesh
Power Sector
Case 1:
- Change demand scenario of the system
Case 2:
- Change the network topology
Case 3:
- Change the outage cases
Case 4:
- Run an N-M-1 outage case
End of Module A