Two Way Slab Design.
Two Way Slab Design.
3.0 LOADING:
= 22.1 kN/m2
Petrofac
Petrofac International Limited
Minimum reinforcement required, Astmin = 0.0013 x 1000 x 150 (0.13%, Refer Table 3.25
d= 120 mm
K= Mu/bd fcu
2
= 114 mm
Ast = Mu/(0.95 fy z)
= 283 mm2
Comparing with Astmin,
Diameter of reinforcement = 10 mm
Maximum spacing of reinforcement allowed = 70000 bb/fy + dia. of bar Refer 3.12.11.2.3 of
d= 111 mm
K= Mu/bd2 fcu
= 105.45 mm
Ast = Mu/(0.95 fy z)
= 195 mm2
Comparing with Astmin,
Diameter of reinforcement = 8 mm
Maximum spacing of reinforcement allowed = 70000 bb/fy + dia. of bar Refer 3.12.11.2.3 of
d= 120 mm
K= Mu/bd2 fcu
= 113.81 mm
Ast = Mu/(0.95 fy z)
= 379 mm2
Comparing with Astmin,
Diameter of reinforcement = 10 mm
Maximum spacing of reinforcement allowed = 70000 bb/fy + dia. of bar Refer 3.12.11.2.3 of
d= 111 mm
K= Mu/bd2 fcu
= 105.45 mm
Ast = Mu/(0.95 fy z)
= 257 mm2
Comparing with Astmin,
Diameter of reinforcement = 8 mm
Maximum spacing of reinforcement allowed = 70000 bb/fy + dia. of bar Refer 3.12.11.2.3 of
= 0.321 N/mm2
Design concrete shear stress, nc = 0.79 {100 As/(bv d)} {400/d} /gm
1/3 1/4
= 1
100 As/bv d = 0.191
Partial safety factor for material gm = 1.25 (Refer 2.4.4.1 of BS 8110:Part 1 - 1997)
\ nc = 0.496 N/mm2
Shear stress is less than the design concrete shear stress, hence Ok.
= 29.167
= 1.091
CONTENTS
3.0 Loading 1