Bar Chart
Bar Chart
a) EQUIPMENT RENTAL:
b) LABOR COST
II ROADS
1) MACADAM ROAD (Graveling) 2,925.27 cu.m.
Loose Volume = 1120m3 (1.2) = 3,217.79 cu.m.
a) MATERIAL COST
b) EQUIPMENT COST
No. of days = 4842.83.85m3/(300m3/day) = 10.73 say 11 days
c) LABOR COST
a) MATERIAL COST
12" dia. RC Pipes 28.00 pcs @ 450 /pcs 12,600.00
16" dia. RC Pipes 46.00 pcs @ 750 /pcs 34,500.00
18" dia. RC Pipes 37.00 pcs @ 950 /pcs 35,150.00
portland cement 45.00 bags @ 220 /bags 9,900.00
G-1/G-3/4 20.00 m3 @ 350 /m3 7,000.00
S-1 35.00 m3 @ 350 /m3 12,250.00
1/4" Form Plywood 10.00 pcs @ 348 /pcs 3,480.00
2" x 2" x 12' Form Lumber 100.00 pcs @ 96 /pcs 9,600.00
CWN Assorted 10.00 kgs @ 60 /kgs 600.00
#16 Tiewire 8.50 kgs @ 60 /kgs 510.00
Reinforcing Steel Bars 220.00 kgs @ 60 /kgs 13,200.00
2) CHB LINNING
area= 1,966.80
a) MATERIAL COST
Portland Cement 1,660.00 Bags @ 220 /pc 365,200.00
S-1 162.00 m3 @ 350 /m3 56,700.00
Gravel 270.00 m3 @ 350 /m3 94,500.00
Reinforcing Steel Bars ( 10mm dia) 2,610.00 pcs @ 140 /pc 365,400.00
4" CHB 24,585.00 pcs @ 7.5 /pc 184,387.50
#16 Tie Wire 200.00 kgs @ 60 /kg 12,000.00
Form Lumber ( 2x2x12') 300.00 pcs @ 96 /pc 28,800.00
Assorted CWN 51.00 kgs @ 60 /kg 3,060.00
a) MATERIAL COST
a) MATERIAL COST
b) LABOR COST
Prepared By;
RICO G. EDURESE
CE - 057886 -90
PTR No.1579430
1/16/2011
Santiago City
PHERN PHILIPPINES REALTY DEVELOPMENT CORPORATION
37F A&J BUILDING, ROXAS ST. DIST.II, CAUAYAN CITY
PROJECT: BELMAG HOMES
LOCATION: BRGY. ROXAS, NAGUILIAN, ISABELA
FIVE MONTHS CRASH PROGRAM OF SCHEDULE OF ACTIVITIES
2011 2012 2013 2014
ITEM DESCRIPTION
September
September
September
November
December
November
December
November
December
February
February
February
February
January
October
January
October
January
October
January
August
August
August
August
March
March
March
March
June
June
June
June
April
April
April
April
May
May
May
May
July
July
July
July
MARKETING OF REMAINING LOTS
COMPLETION OF LAND DEVELOPMENT ( Phase I & II)
DOCUMENTATION
PREP. OF DOCS. FOR SUBD. PLAN APPROVAL
PHASE I
PHASE II
SUBMISSION & APPROVAL OF SUBD. PLAN
PHASE I
PHASE II
UNITIZATION OF TITLE
PHASE I
PHASE II
APPLICATION OF INDIVIDUAL LOAN TO PSCC
PHASE I
PHASE II
COMPLIANCE OF PSCC REQUIREMENTS
PHASE I
PHASE II
ANNOTATION OF MORTGAGE
PHASE I
PHASE II
RELEASE OF MORTGAGE
PHASE I
PHASE II
PREPARED BY: ATTESTED BY: APPROVED:
VENILDA S. ZARA MARIE DEE B. BELAGAN & MARIA A. MAGAOAY
ENGR. RICO G. EDURESE PROJECT OPERATION MANAGER LANDOWNERS
PRESIDENT
MODERN TECH. REALTY DEVELOPMENT & SERVICES CORPORATION
2/F J & L Building, Cabatuan Road, San Fermin, Cauayan City
SEC Reg. No. CS201501488 TIN NO. 008-946-245
PROJECT: PROPOSED FOUR STOREY COMMERCIAL & EDUCATIONAL INSTITUTION BUILDING
PHASE 1-FOUNDATIONS AND STRUCTURAL ERECTION WORKS
LOCATION: MAHARLIKA HIGHWAY, VILLASIS, SANTIAGO CITY
CONTRACTOR: V RISE BUILDERS/ENGR. EDUARDO C. VILLA
III REINFORCE CONCRETE WORKS 1,313,235.00 1,300,241.25 26.268 99.011 26.530 45.0
MISCELLANEOUS
ENGINEERING OVERHEAD
WEEKLY TOTAL PROJECTED 127,957.50 349,222.50 322,740.00 359,865.00 314,325.00 337,342.50 359,865.00 359,865.00 276,705.00 - 262,449.00 239,431.50 276,061.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50
TOTAL PROJECT COST 4,950,000.00
WEEKLY TOTAL ACTUAL 139,976.50 345,624.40 301,573.57 332,622.14 332,622.14 363,312.14 280,066.62 304,573.45 304,573.45 82,059.10 56,408.55 10,230.00 20,130.00 9,900.00 315,562.00 305,662.00 305,662.00 305,664.00 - -
5.0
Periodic Accomplishment (Projected) 2.585 7.055 6.520 7.270 6.350 6.815 7.270 7.270 5.590 - 5.302 4.837 5.577 3.937 3.937 3.937 3.937 3.937 3.937 3.937
Periodic Accomplishment (actual) 2.828 6.982 6.092 6.720 6.720 7.340 5.658 6.153 6.153 1.658 1.140 0.207 0.407 0.200 6.375 6.175 6.175 6.175 - -
Slippage (+/-) 0.243 (0.073) (0.428) (0.550) 0.370 0.525 (1.612) (1.117) 0.563 1.658 (4.162) (4.630) (5.170) (3.737) 2.438 2.238 2.238 2.238 - - 0
WEIGHTED ACCOMPLISHMENT %
Commulative accomplishment (projected) 2.585 9.640 16.160 23.430 29.780 36.595 43.865 51.135 56.725 56.725 62.027 66.864 72.441 76.378 80.315 84.252 88.189 92.126 96.063 100.000
Commulative accomplishment (actual) 2.828 9.810 15.903 22.622 29.342 36.681 42.339 48.492 54.645 56.303 57.443 57.649 58.056 58.256 64.631 70.806 76.981 83.156 - -
Slippage (+/-) 0.243 0.170 (0.257) (0.808) (0.438) 0.086 (1.526) (2.643) (2.080) (0.422) (4.584) (9.215) (14.385) (18.122) (15.684) (13.446) (11.208) (8.970) - -
Periodic Cash Flow ( Projected) 127,957.50 349,222.50 322,740.00 359,865.00 314,325.00 337,342.50 359,865.00 359,865.00 276,705.00 - 262,449.00 239,431.50 276,061.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50
Periodic Cash Flow ( Actual) 139,976.50 345,624.40 301,573.57 332,622.14 332,622.14 363,312.14 280,066.62 304,573.45 304,573.45 82,059.10 56,408.55 10,230.00 20,130.00 9,900.00 315,562.00 305,662.00 305,662.00 305,664.00 - -
Slippage (+/-) 12,019.000 (3,598.100) (21,166.430) (27,242.860) 18,297.140 25,969.640 (79,798.377) (55,291.547) 27,868.453 82,059.100 (206,040.450) (229,201.500) (255,931.500) (184,981.500) 120,680.500 110,780.500 110,780.500 110,782.500 - -
CASH FLOW- Php
Commulative Cash Flow ( Projected) 127,957.50 477,180.00 799,920.00 1,159,785.00 1,474,110.00 1,811,452.50 2,171,317.50 2,531,182.50 2,807,887.50 2,807,887.50 3,070,336.50 3,309,768.00 3,585,829.50 3,780,711.00 3,975,592.50 4,170,474.00 4,365,355.50 4,560,237.00 4,755,118.50 4,950,000.00
Commulative Cash Flow (actual) 139,976.50 485,600.90 787,174.47 1,119,796.61 1,452,418.75 1,815,730.89 2,095,797.51 2,400,370.97 2,704,944.42 2,787,003.52 2,843,412.07 2,853,642.07 2,873,772.07 2,883,672.07 3,199,234.07 3,504,896.07 3,810,558.07 4,116,222.07 - -
Slippage (+/-) 12,019.000 8,420.900 (12,745.530) (39,988.390) (21,691.250) 4,278.390 (75,519.987) (130,811.533) (102,943.080) (20,883.980) (226,924.430) (456,125.930) (712,057.430) (897,038.930) (776,358.430) (665,577.930) (554,797.430) (444,014.930) - -
III REINFORCE CONCRETE WORKS 1,313,235.00 1,300,241.25 26.268 99.011 26.530 45.0
MISCELLANEOUS
ENGINEERING OVERHEAD
WEEKLY TOTAL PROJECTED 127,957.50 349,222.50 322,740.00 359,865.00 314,325.00 337,342.50 359,865.00 359,865.00 276,705.00 - 262,449.00 239,431.50 276,061.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50
TOTAL PROJECT COST 4,950,000.00
WEEKLY TOTAL ACTUAL 139,976.50 345,624.40 301,573.57 332,622.14 332,622.14 363,312.14 280,066.62 304,573.45 304,573.45 82,059.10 56,408.55 10,230.00 20,130.00 9,900.00 315,562.00 305,662.00 305,662.00 305,664.00 - -
5.0
Periodic Accomplishment (Projected) 2.585 7.055 6.520 7.270 6.350 6.815 7.270 7.270 5.590 - 5.302 4.837 5.577 3.937 3.937 3.937 3.937 3.937 3.937 3.937
Periodic Accomplishment (actual) 2.828 6.982 6.092 6.720 6.720 7.340 5.658 6.153 6.153 1.658 1.140 0.207 0.407 0.200 6.375 6.175 6.175 6.175 - -
Slippage (+/-) 0.243 (0.073) (0.428) (0.550) 0.370 0.525 (1.612) (1.117) 0.563 1.658 (4.162) (4.630) (5.170) (3.737) 2.438 2.238 2.238 2.238 - - 0
WEIGHTED ACCOMPLISHMENT %
Commulative accomplishment (projected) 2.585 9.640 16.160 23.430 29.780 36.595 43.865 51.135 56.725 56.725 62.027 66.864 72.441 76.378 80.315 84.252 88.189 92.126 96.063 100.000
Commulative accomplishment (actual) 2.828 9.810 15.903 22.622 29.342 36.681 42.339 48.492 54.645 56.303 57.443 57.649 58.056 58.256 64.631 70.806 76.981 83.156 - -
Slippage (+/-) 0.243 0.170 (0.257) (0.808) (0.438) 0.086 (1.526) (2.643) (2.080) (0.422) (4.584) (9.215) (14.385) (18.122) (15.684) (13.446) (11.208) (8.970) - -
Periodic Cash Flow ( Projected) 127,957.50 349,222.50 322,740.00 359,865.00 314,325.00 337,342.50 359,865.00 359,865.00 276,705.00 - 262,449.00 239,431.50 276,061.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50
Periodic Cash Flow ( Actual) 139,976.50 345,624.40 301,573.57 332,622.14 332,622.14 363,312.14 280,066.62 304,573.45 304,573.45 82,059.10 56,408.55 10,230.00 20,130.00 9,900.00 315,562.00 305,662.00 305,662.00 305,664.00 - -
Slippage (+/-) 12,019.000 (3,598.100) (21,166.430) (27,242.860) 18,297.140 25,969.640 (79,798.377) (55,291.547) 27,868.453 82,059.100 (206,040.450) (229,201.500) (255,931.500) (184,981.500) 120,680.500 110,780.500 110,780.500 110,782.500 - -
CASH FLOW- Php
Commulative Cash Flow ( Projected) 127,957.50 477,180.00 799,920.00 1,159,785.00 1,474,110.00 1,811,452.50 2,171,317.50 2,531,182.50 2,807,887.50 2,807,887.50 3,070,336.50 3,309,768.00 3,585,829.50 3,780,711.00 3,975,592.50 4,170,474.00 4,365,355.50 4,560,237.00 4,755,118.50 4,950,000.00
Commulative Cash Flow (actual) 139,976.50 485,600.90 787,174.47 1,119,796.61 1,452,418.75 1,815,730.89 2,095,797.51 2,400,370.97 2,704,944.42 2,787,003.52 2,843,412.07 2,853,642.07 2,873,772.07 2,883,672.07 3,199,234.07 3,504,896.07 3,810,558.07 4,116,222.07 - -
Slippage (+/-) 12,019.000 8,420.900 (12,745.530) (39,988.390) (21,691.250) 4,278.390 (75,519.987) (130,811.533) (102,943.080) (20,883.980) (226,924.430) (456,125.930) (712,057.430) (897,038.930) (776,358.430) (665,577.930) (554,797.430) (444,014.930) - -
III REINFORCE CONCRETE WORKS 1,313,235.00 1,300,241.25 26.268 99.011 26.530 45.0
MISCELLANEOUS
ENGINEERING OVERHEAD
WEEKLY TOTAL PROJECTED 127,957.50 349,222.50 322,740.00 359,865.00 314,325.00 337,342.50 359,865.00 359,865.00 276,705.00 - 262,449.00 239,431.50 276,061.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50
TOTAL PROJECT COST 4,950,000.00
WEEKLY TOTAL ACTUAL 139,976.50 345,624.40 301,573.57 332,622.14 332,622.14 363,312.14 280,066.62 304,573.45 304,573.45 82,059.10 - - - - - - - - - -
5.0
Periodic Accomplishment (Projected) 2.585 7.055 6.520 7.270 6.350 6.815 7.270 7.270 5.590 - 5.302 4.837 5.577 3.937 3.937 3.937 3.937 3.937 3.937 3.937
Periodic Accomplishment (actual) 2.828 6.982 6.092 6.720 6.720 7.340 5.658 6.153 6.153 1.658 - - - - - - - - - -
Slippage (+/-) 0.243 (0.073) (0.428) (0.550) 0.370 0.525 (1.612) (1.117) 0.563 1.658 - - - - - - - - - - 0
WEIGHTED ACCOMPLISHMENT %
Commulative accomplishment (projected) 2.585 9.640 16.160 23.430 29.780 36.595 43.865 51.135 56.725 56.725 62.027 66.864 72.441 76.378 80.315 84.252 88.189 92.126 96.063 100.000
Commulative accomplishment (actual) 2.828 9.810 15.903 22.622 29.342 36.681 42.339 48.492 54.645 56.303 - - - - - - - - - -
Slippage (+/-) 0.243 0.170 (0.257) (0.808) (0.438) 0.086 (1.526) (2.643) (2.080) (0.422) - - - - - - - - - -
Periodic Cash Flow ( Projected) 127,957.50 349,222.50 322,740.00 359,865.00 314,325.00 337,342.50 359,865.00 359,865.00 276,705.00 - 262,449.00 239,431.50 276,061.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50
Periodic Cash Flow ( Actual) 139,976.50 345,624.40 301,573.57 332,622.14 332,622.14 363,312.14 280,066.62 304,573.45 304,573.45 82,059.10 - - - - - - - - - -
Slippage (+/-) 12,019.000 (3,598.100) (21,166.430) (27,242.860) 18,297.140 25,969.640 (79,798.377) (55,291.547) 27,868.453 82,059.100 - - - - - - - - - -
CASH FLOW- Php
Commulative Cash Flow ( Projected) 127,957.50 477,180.00 799,920.00 1,159,785.00 1,474,110.00 1,811,452.50 2,171,317.50 2,531,182.50 2,807,887.50 2,807,887.50 3,070,336.50 3,309,768.00 3,585,829.50 3,780,711.00 3,975,592.50 4,170,474.00 4,365,355.50 4,560,237.00 4,755,118.50 4,950,000.00
Commulative Cash Flow (actual) 139,976.50 485,600.90 787,174.47 1,119,796.61 1,452,418.75 1,815,730.89 2,095,797.51 2,400,370.97 2,704,944.42 2,787,003.52 - - - - - - - - - -
Slippage (+/-) 12,019.000 8,420.900 (12,745.530) (39,988.390) (21,691.250) 4,278.390 (75,519.987) (130,811.533) (102,943.080) (20,883.980) - - - - - - - - - -
III REINFORCE CONCRETE WORKS 1,313,235.00 807,104.18 16.305 61.459 26.530 45.0
MISCELLANEOUS
ENGINEERING OVERHEAD
WEEKLY TOTAL PROJECTED 127,957.50 349,222.50 322,740.00 359,865.00 314,325.00 337,342.50 359,865.00 359,865.00 276,705.00 - 262,449.00 239,431.50 276,061.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50
TOTAL PROJECT COST 4,950,000.00
WEEKLY TOTAL ACTUAL 139,976.50 345,624.39 301,573.56 332,622.13 332,622.13 363,312.13 - - - - - - - - - - - - - -
5.0
Periodic Accomplishment (Projected) 2.585 7.055 6.520 7.270 6.350 6.815 7.270 7.270 5.590 - 5.302 4.837 5.577 3.937 3.937 3.937 3.937 3.937 3.937 3.937
Periodic Accomplishment (actual) 2.828 6.982 6.092 6.720 6.720 7.340 - - - - - - - - - - - - - -
Slippage (+/-) 0.243 (0.073) (0.428) (0.550) 0.370 0.525 - - - - - - - - - - - - - - 0
WEIGHTED ACCOMPLISHMENT %
Commulative accomplishment (projected) 2.585 9.640 16.160 23.430 29.780 36.595 43.865 51.135 56.725 56.725 62.027 66.864 72.441 76.378 80.315 84.252 88.189 92.126 96.063 100.000
Commulative accomplishment (actual) 2.828 9.810 15.903 22.622 29.342 36.681 - - - - - - - - - - - - - -
Slippage (+/-) 0.243 0.170 (0.257) (0.808) (0.438) 0.086 - - - - - - - - - - - - - -
Periodic Cash Flow ( Projected) 127,957.50 349,222.50 322,740.00 359,865.00 314,325.00 337,342.50 359,865.00 359,865.00 276,705.00 - 262,449.00 239,431.50 276,061.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50 194,881.50
Periodic Cash Flow ( Actual) 139,976.50 345,624.39 301,573.56 332,622.13 332,622.13 363,312.13 - - - - - - - - - - - - - -
Slippage (+/-) 12,018.996 (3,598.108) (21,166.438) (27,242.872) 18,297.128 25,969.628 - - - - - - - - - - - - - -
CASH FLOW- Php
Commulative Cash Flow ( Projected) 127,957.50 477,180.00 799,920.00 1,159,785.00 1,474,110.00 1,811,452.50 2,171,317.50 2,531,182.50 2,807,887.50 2,807,887.50 3,070,336.50 3,309,768.00 3,585,829.50 3,780,711.00 3,975,592.50 4,170,474.00 4,365,355.50 4,560,237.00 4,755,118.50 4,950,000.00
Commulative Cash Flow (actual) 139,976.50 485,600.89 787,174.45 1,119,796.58 1,452,418.71 1,815,730.83 - - - - - - - - - - - - - -
Slippage (+/-) 12,018.996 8,420.888 (12,745.550) (39,988.422) (21,691.294) 4,278.334 - - - - - - - - - - - - - -
SUMMARY OF COST
I EARTHWORKS
EXCAVATION AND ROAD TRACING 274,364.03
II ROAD
a) MACADAM ROAD (Graveling) 1,179,348.29
b) PORTLAND CEMENT CONCRETE PAVEMENT 1,430,896.35
Prepared By;
RICO G. EDURESE
CE - 057886 -90
PTR No.1579430
1/16/2011
Santiago City
-
-
#REF! #REF!
-
-
#REF! #REF!
#REF! #REF! 513.85
- 1606
- 166 59.76
#REF! #REF! 0.04
#REF! #REF! 0.364
- 1.66666666666667
#REF! #REF! 1.33333333333333
-
#REF! #REF!
-
-
-
0.001
#REF! #REF! 0.0075
0.0085
#REF! #REF! 0.017 0.034
#REF! #REF! 0.037 102.784
6.142 96.36
6.64 2.49
49.8 2004.823
0.1445 185.2457
84.66 830
552.78 16060
92.13 0.101
0.05 30.78
51.813
702.0405
3.32
211 7695
161.5
134.64
1660
2610
24585
REYES CMP
Cabaruan, Cauayan City
Isabela
Accomplishment Report No. ____
As of October 26, 2009
STATEMENT OF WORK ACCOMPLISHMENT as of April 1, 2019
Project: PROPOSED FOUR STOREY COMMERCIAL & EDUCATIONAL INSTITUTION BUILDING Contract Amount:
PHASE 1-FOUNDATIONS AND STRUCTURAL ERECTION WORKS Date Started:
Location: MAHARLIKA HIGHWAY, VILLASIS, SANTIAGO CITY Date of Completion:
Contractor:/Developer V RISE BUILDERS % Projected Accomplishment:
Values of Accomplishment to Date: PHP 2,787,003.45 % Accomplishment To Date:
Status of Projet: On -going (+ / -) SLIPPAGE
Relative PHYSICAL ACCOMPLISHMENT Value of Accomplishment
ITEM DESCRIPTION unit QTY Unit Cost Amount Weight QUANTITY Prev. This Period To Date Prev.
I MOBILIZATION/DEMOBILIZATION LS LS LS
135,630.00 2.74 LS 2.74 - 2.74 135,630.00
A. MANPOWER LS LS LS
43,560.00 0.88 LS 0.88 - 0.88 43,560.00
II EARTHWORKS M³
443,520.00 8.96 - 3.08 2.94 6.02 152,276.65
B. COMPACTION M²
420.00 193.29 81,180.00 1.64 - - 0.25 0.25 -
C. BACKFILL M³
708.00 125.85 89,100.00 1.80 - - 0.36 0.36 -
B. FORMWORKS M²
454.00 572.41 259,875.00 5.25 216.97 2.51 2.48 4.99 124,194.26
C. CONCRETE WORKS M³
170.50 2,276.13 388,080.00 7.84 69.36 3.19 4.65 7.84 157,870.94
A. FABRICATION TONS
197.00 5,628.43 1,108,800.00 22.40 128.05 14.56 6.72 21.28 720,720.00
A. FABRICATION TONS
197.00 5,628.43 1,108,800.00 22.40 128.05 14.56 6.72 21.28 720,720.00
56.725 %
56.303 %
-0.4219 %
Value of Accomplishment % weghted
This Period To Date Accomp. to date
- 135,630.00
- 43,560.00 0.88
- 92,070.00 1.86
145,495.55 297,772.20
493,137.07 1,300,241.25
332,640.00 1,053,360.00
- - -
(0.00)
194,254.52
24,281.82
752,736.28
APPROVED:
TOMAS BAUTISTA
OWNER
REYES CMP
Cabaruan, Cauayan City
Isabela
Accomplishment Report No. ____
As of October 26, 2009
STATEMENT OF WORK ACCOMPLISHMENT as of April 1, 2019
Project: PROPOSED FOUR STOREY COMMERCIAL & EDUCATIONAL INSTITUTION BUILDING Contract Amount:
PHASE 1-FOUNDATIONS AND STRUCTURAL ERECTION WORKS Date Started:
Location: MAHARLIKA HIGHWAY, VILLASIS, SANTIAGO CITY Date of Completion:
Contractor:/Developer V RISE BUILDERS % Projected Accomplishment:
Values of Accomplishment to Date: PHP 4,116,222.00 % Accomplishment To Date:
Status of Projet: On -going (+ / -) SLIPPAGE
Relative PHYSICAL ACCOMPLISHMENT Value of Accomplishment
ITEM DESCRIPTION unit QTY Unit Cost Amount Weight QUANTITY Prev. This Period To Date Prev.
I MOBILIZATION/DEMOBILIZATION LS LS LS
135,630.00 2.74 LS 2.74 - 2.74 135,630.00
A. MANPOWER LS LS LS
43,560.00 0.88 LS 0.88 - 0.88 43,560.00
II EARTHWORKS M³
443,520.00 8.96 - 6.02 1.33 7.35 297,772.20
B. COMPACTION M²
420.00 193.29 81,180.00 1.64 217 0.25 0.60 0.85 12,177.00
C. BACKFILL M³
708.00 125.85 89,100.00 1.80 385 0.36 0.62 0.98 17,820.00
B. FORMWORKS M²
454.00 572.41 259,875.00 5.25 454 4.99 0.26 5.25 246,881.25
C. CONCRETE WORKS M³
170.50 2,276.13 388,080.00 7.84 171 7.84 - 7.84 388,080.00
A. FABRICATION TONS
197.00 5,628.43 1,108,800.00 22.40 192 21.28 0.56 21.84 1,053,360.00
A. FABRICATION TONS
197.00 5,628.43 1,108,800.00 22.40 192 21.28 0.56 21.84 1,053,360.00
92.126 %
83.153 %
-8.9729 %
Value of Accomplishment % weghted
This Period To Date Accomp. to date
- 135,630.00 2.74
- 43,560.00 0.88
- 92,070.00 1.86
- 665,280.00 13.44
- 388,080.00 7.84
265,815.00
33,230.46
1,030,173.09
APPROVED:
ERN COLLEGE
TOMAS BAUTISTA
OWNER
REYES CMP
Cabaruan, Cauayan City
Isabela
Accomplishment Report No. ____
As of October 26, 2009
STATEMENT OF WORK ACCOMPLISHMENT as of April 1, 2019
Project: PROPOSED FOUR STOREY COMMERCIAL & EDUCATIONAL INSTITUTION BUILDING Contract Amount:
PHASE 1-FOUNDATIONS AND STRUCTURAL ERECTION WORKS Date Started:
Location: MAHARLIKA HIGHWAY, VILLASIS, SANTIAGO CITY Date of Completion:
Contractor:/Developer V RISE BUILDERS % Projected Accomplishment:
Values of Accomplishment to Date: PHP 4,116,222.00 % Accomplishment To Date:
Status of Projet: On -going (+ / -) SLIPPAGE
Relative PHYSICAL ACCOMPLISHMENT Value of Accomplishment
ITEM DESCRIPTION unit QTY Unit Cost Amount Weight QUANTITY Prev. This Period To Date Prev.
I MOBILIZATION/DEMOBILIZATION LS LS LS
135,630.00 2.74 LS 2.74 - 2.74 135,630.00
A. MANPOWER LS LS LS
43,560.00 0.88 LS 0.88 - 0.88 43,560.00
II EARTHWORKS M³
443,520.00 8.96 - 6.02 1.33 7.35 297,772.20
B. COMPACTION M²
420.00 193.29 81,180.00 1.64 217 0.25 0.60 0.85 12,177.00
C. BACKFILL M³
708.00 125.85 89,100.00 1.80 385 0.36 0.62 0.98 17,820.00
B. FORMWORKS M²
454.00 572.41 259,875.00 5.25 454 4.99 0.26 5.25 246,881.25
C. CONCRETE WORKS M³
170.50 2,276.13 388,080.00 7.84 171 7.84 - 7.84 388,080.00
A. FABRICATION TONS
197.00 5,628.43 1,108,800.00 22.40 192 21.28 0.56 21.84 1,053,360.00
A. FABRICATION TONS
197.00 5,628.43 1,108,800.00 22.40 192 21.28 0.56 21.84 1,053,360.00
92.126 %
83.153 %
-8.9729 %
Value of Accomplishment % weghted
This Period To Date Accomp. to date
- 135,630.00 2.74
- 43,560.00 0.88
- 92,070.00 1.86
- 665,280.00 13.44
- 388,080.00 7.84
265,815.00
33,230.46
1,030,173.09
APPROVED:
ERN COLLEGE
TOMAS BAUTISTA
OWNER
REYES CMP
Cabaruan, Cauayan City
Isabela
Accomplishment Report No. ____
As of October 26, 2009
STATEMENT OF WORK ACCOMPLISHMENT as of FEBRUARY 28, 2019
Project: PROPOSED FOUR STOREY COMMERCIAL & EDUCATIONAL INSTITUTION BUILDING Contract Amount:
PHASE 1-FOUNDATIONS AND STRUCTURAL ERECTION WORKS Date Started:
Location: MAHARLIKA HIGHWAY, VILLASIS, SANTIAGO CITY Date of Completion:
Contractor:/Developer V RISE BUILDERS % Projected Accomplishment:
Values of Accomplishment to Date: PHP 1,815,730.83 % Accomplishment To Date:
Status of Projet: On -going (+ / -) SLIPPAGE
Relative PHYSICAL ACCOMPLISHMENT Value of Accomplishment
ITEM DESCRIPTION
unit QTY Unit Cost Amount Weight QUANTITY Prev. This Period To Date Prev.
I MOBILIZATION/DEMOBILIZATION LS LS LS
135,630.00 2.74 LS 2.74 2.74
A. MANPOWER LS LS LS
43,560.00 0.88 LS 0.88 0.88
II EARTHWORKS M³
443,520.00 8.96 - 3.08 3.08
B. COMPACTION M²
420.00 193.29 81,180.00 1.64 - - -
C. BACKFILL M³
708.00 125.85 89,100.00 1.80 - - -
B. FORMWORKS M²
454.00 572.41 259,875.00 5.25 216.97 2.51 2.51
C. CONCRETE WORKS M³
170.50 2,276.13 388,080.00 7.84 69.36 3.19 3.19
C. CONCRETE WORKS M³
170.50 2,276.13 388,080.00 7.84 69.36 3.19 3.19
A. FABRICATION TONS
197.00 5,628.43 1,108,800.00 22.40 128.05 14.56 14.56
TOTAL COST
4,950,000.00 100.00 - -
36.595 %
36.681 %
0.0864 %
Value of Accomplishment % weghted
This Period To Date Accomp. to date
- - -
- - -
- - -
1,815,730.83
181,573.08
363,146.17
45,393.27
1,225,618.31
APPROVED:
TOMAS BAUTISTA
OWNER
PROJECT: PROPOSED FOUR STOREY COMMERCIAL & EDUCATIONAL INSTITUTION BUILDING
PHASE 1-FOUNDATIONS AND STRUCTURAL ERECTION WORKS
LOCATION: MAHARLIKA HIGHWAY, VILLASIS, SANTIAGO CITY
CONTRACTOR: V RISE BUILDERS/ENGR. EDUARDO C. VILLA
MISCELLANEOUS
ENGINEERING OVERHEAD