This non-conformance report documents an issue found with a contractor's work on a project. It identifies the contractor, location of the issue, and provides a description of the non-conforming work or required action. The contractor must then provide a proposed date to take corrective action and signature, which the project management company will review and either accept or reject, and note when the corrective action is completed.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
198 views
Non-Conformance Report
This non-conformance report documents an issue found with a contractor's work on a project. It identifies the contractor, location of the issue, and provides a description of the non-conforming work or required action. The contractor must then provide a proposed date to take corrective action and signature, which the project management company will review and either accept or reject, and note when the corrective action is completed.