0% found this document useful (0 votes)
56 views20 pages

Impe BR100 Ce

The document provides instructions for setting up a cash management application. It details steps for defining system parameters, responsibilities, profile options, banks, bank accounts, bank statements mapping, and issues tracking. Configuration parameters and an error log are also included.

Uploaded by

Facundo Bodner
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views20 pages

Impe BR100 Ce

The document provides instructions for setting up a cash management application. It details steps for defining system parameters, responsibilities, profile options, banks, bank accounts, bank statements mapping, and issues tracking. Configuration parameters and an error log are also included.

Uploaded by

Facundo Bodner
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 20

CASH MANAGEMENT APPLICATION

SETUP
BR100
Iron Mountain

Author: IT Convergence
Creation Date: May 7, 2015
Last Updated: Oct 16, 2015
Updated by: IT Convergence
Version: 1.1

Approvals:

Page 1 of 20 Version 1.0


Document Control

Change Record
4

Date Author Version Change Reference

07-may-2015 IT Convergence Draft Initial Draft Document


16-oct-2015 IT Convergence Final

Reviewers

Name Position

Distribution

Copy No. Name Location

1 Share Point Setups


2
3
4

Page 2 of 20 Version 1.0


Contents
Document Control.........................................................................................................................................................................2

CE: Define System Parameters.........................................................................................................................................................4

CE: Responsibility Definition............................................................................................................................................................6

CE: Profile System Options...............................................................................................................................................................7

CE: Define Banks...............................................................................................................................................................................8

CE: Define Branch Banks.................................................................................................................................................................9

CE: Define Banks Accounts............................................................................................................................................................11

CE: Define Banks Statements Mapping.........................................................................................................................................13

CE: Define Banks Statements Mapping.........................................................................................................................................15


Open and Closed Issues............................................................................................................................................................18
Closed Issues............................................................................................................................................................................18
Setup result.....................................................................................................................................................................................19
Attachment xx - Error Log..............................................................................................................................................................20

Page 3 of 20 Version 1.0


CE: Define System Parameters

Cash Management>Setup>System Parameters


Oldest Date Placed in Service changed
Form
Name
System Parameters

Page 4 of 20
Page 5 of 20
CE: Responsibility Definition
Navigation Path  System Administrator > Security > Responsibility > Define

Page 6 of 20
CE: Profile System Options
Navigation Path  System Administrator > Profile > System

CE Perú Profiles.xlsx

Page 7 of 20
CE: Define Banks
Form
Cash Management>Setup>Bank>Banks Name
<Customer Short Name> Process: Business Area: Date:
<Process Name> <Business Area> <Date>
Control Number: Priority(H, M, L): Process Owner:
<Control Number> <Priority (H, M, L)> <Process Owner>

Description: Define Banks

Page 8 of 20
CE: Define Branch Banks
Form
Cash Management>Setup>Banks Name

<Customer Short Name> Process: Business Area: Date:


<Process Name> <Business Area> <Date>
Control Number: Priority(H, M, L): Process Owner:
<Control Number> <Priority (H, M, L)> <Process Owner>

Description: Define Branch Banks

Page 9 of 20
Page 10 of 20
CE: Define Banks Accounts

Cash Management>Setup>Banks>Bank Accounts


Form
Name

<Customer Short Name> Process: Business Area: Date:


<Process Name> <Business Area> <Date>
Control Number: Priority(H, M, L): Process Owner:
<Control Number> <Priority (H, M, L)> <Process Owner>

Description: Define Bank Accounts

Page 11 of 20
Page 12 of 20
CE: Define Banks Statements Mapping

Cash Management>Setup>Banks>Bank Statement Mapping


Form
Name

<Customer Short Name> Process: Business Area: Date:


<Process Name> <Business Area> <Date>
Control Number: Priority(H, M, L): Process Owner:
<Control Number> <Priority (H, M, L)> <Process Owner>

Description: Define Bank Statement Mapping

BCP
Page 13 of 20
BBVA

Page 14 of 20
CE: Define Banks Statements Mapping

Cash Management>Setup>Banks>Bank Statement Mapping


Form
Name

<Customer Short Name> Process: Business Area: Date:


<Process Name> <Business Area> <Date>
Control Number: Priority(H, M, L): Process Owner:
<Control Number> <Priority (H, M, L)> <Process Owner>

Description: Define Bank Transactions Codes

BCP- PEN
Page 15 of 20
BCP - USD

BBVA – PEN

Page 16 of 20
BBVA – USD

Page 17 of 20
Open and Closed Issues

Open Issues

Sl # Issues Owner Closure Date

Closed Issues

Page 18 of 20
Setup result
To be filled out immediately after execution
Result (PASS/FAIL): No of pages attached: Setup run number:

Environment:
Development Test Pre-Production Production
Comments:

Additional configuration parameters to record:

Setup Executor: Date: Signature:

Setup Reviewer (if PASS): Date: Signature:

Page 19 of 20
Attachment xx - Error Log
Title of installation: Environment: Setup run
number:
Development Test Pre-Production
Production
Step ID: Classification: Other steps concerned: No of pages attached:
Major error Minor error
Error Description:

Corrective Actions: Raised Change Request? Change ID (if YES):


Yes No

Responsible person: Due Date:

Setup Executor: Date: Signature:

Setup Reviewer: Date: Signature:

Closure
Closing Information:

Error closed by: Date: Signature:

Page 20 of 20

You might also like