Experience Sharing
(1 June 2014 – 31 May 2015)
Pichit Phongprasert
Electricity Generating Authority of Thailand
Outline
2
Outline
3
Egat Transmission System
(as June 2015)
69 kV AC - - 19.000
4
Egat Transmission System
6
System Average Interruption Frequency Index :
SAIFI
SAIFI (occ/point)
0.40
0.36
0.35 0.33
0.3
0.30
0.25
0.20 0.17 SAIFI
0.15
0.10 0.07
0.05
0.00
2011 2012 2013 2014 2015*
*Data of June 2015
7
System Average Interruption Duration Index :
SAIDI
SAIDI (minute/point)
16.00
14.43 13.97
14.00
12.00
10.00
8.00 6.79 SAIDI
6.00
4.00
2.06
2.00 0.70
0.00
2011 2012 2013 2014 2015*
*Data of June 2015
8
System Interruption Severity Index : SISI
SISI (MW-minute/MW)
9.00 8.55
8.00
7.00
6.00
5.00
4.00 3.62 SISI
3.00
1.98
2.00
1.00 0.64 0.34
0.00
2011 2012 2013 2014 2015*
10
Transmission Line Trip Out Statistic
(June 2014 – May 2015)
Failure
Voltage Transmission Line No. of Failures (per 100 cct.-
(kV) (Circuit-km)
km/yr)
69 19.000 0 0
11
Transmission Line Trip Out Statistics
40 36
30
30 22 24 115 kV
20 14 12
15 230 kV
9 8 9 10 9 8 9
10 5
2 0
5 6 5
500 kV
0 0 0 0 0 0 1 0 0 0 0
0
12
Transmission Line Trip Out Statistics
9% Unknown
14%
3% 5% Tree
Truck and Construction
9% Fire
Animals
3%
32%
Bird amd Pollution
1%
Transmission Line Equipment
17% Protection Equipment
5% Foreign Object
2%
Other
13
Transmission Line Availability (%)
TLAF (%)
99.985 99.987 99.983 99.995 99.984
100.00
99.90
99.80
99.70
99.60
99.50
TLAF
99.40
99.30
99.20
99.10
99.00
2011 2012 2013 2014 2015*
16
Transformer Trip Out Statistics
(June 2014 – May 2015)
500 kV 63 1 1.51
69 kV 2 0 0.00
17
Transformer Availability (%)
TRAF (%)
100.00
99.90 99.862
99.80 99.752
99.70 99.672
99.60
99.50 99.426 TLAF
99.40
99.30
99.20
99.10 99.062
99.00
2011 2012 2013 2014 2015*
TROF (occ./Unit)
1.20
1
1.00
0.80
2012
0.60 2013
2014
0.40 0.34
0.32
0.29 2015*
0.22 0.24
0.18 0.2 0.15
0.20 0.1
0.13 0.14
0.05 0.05 0.07 0.07
0 0 0 0
0.00
500kV 230kV 132 kV 115kV System
20
Circuit Breaker and GIS
Statistics Period: June 2014 - May 2015
Failure
Substation Installed
No. of Failures (per 100 units
Equipment Units
installed)
500 kV GIS 91 0 0
115 kV GIS 25 0 0
Major Failure of Circuit Breaker and GIS
CB GIS
Outline
23
Case 1 – Tx. and Instrument Tx.
On 22 November 2014
RY1-KT1A was trip by oil flow relay.
Outage 30.6 MW 1 minute
24
DC Resistance Measurement after Failure
25
Root Cause Analysis
26
OLTC MR Type H in EGAT System
CROD
NROD
27
Solving
Short-term Solving :
1. Change flexible lead by 50 MVA spare transformer in the system
2. All Tx which using MR type H and V sent the example oil for DGA
3. All Tx which using MR type H and V will be inspect by supervisor
28
Outline
29
Case 2 – Circuit Breaker and GIS
Impact
Bird to 500อาคาร
Eye View kV GIS
500caused
kV GISby foundation collapsed
2nd Stage
1st Stage in 1990 extension
in 2006
3rd Stage
extension in 2011
Metallic bellow level of extension side
lower than existing level max. -40 mm.
40 mm
Immediate Action Split enclosure that over stress from the system
Before
Split Bus
After Split
Bus
Outline
34
Case 3 - Transmission Line
Bkr CT-700812
3 km
35
CT Substation
13:40 CT 700012, 700412, 700612, 700712, 700812, 7001012, 700112, 701212,
KRD 7012,7022 (115 kV Main Bus No.1 , 115 kV Line CT-KRD Trip )
Relay Line KRD Relay (SIEMEN) : Trip A, G Zone 1
Distance Shown 3.2 km (Line distance 25.2 km)
: 700812 Bkr. Fail Op. , 86B1
Ann. : 700812Trip
: 115 kV KRD Pri. Distance Relay Trip
: 115 kV KRD KWH Main Loss Of PT.
: Line Fault Locator Fail
36
A Structure No 8/2 with high resistance ground,
lightning strike at conductor phase A and flashover
Lightning impulse exceeding the insulation level of Breaker
CT-700812 caused breaker failure and 115 kV Main Bus No.1
trip
38
Mitigation Methods
39
Thank you for your attention