System Performance - EGAT PDF

The document reports on the performance of the Electricity Generating Authority of Thailand's transmission system from June 2014 to May 2015. It provides statistics on system interruptions, transmission line and transformer performance, and shares experiences on system problems. Key metrics like SAIFI, SAIDI, and transmission line and transformer availability remained high, generally above 99%, indicating high system reliability over the period.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
168 views40 pages

System Performance - EGAT PDF

The document reports on the performance of the Electricity Generating Authority of Thailand's transmission system from June 2014 to May 2015. It provides statistics on system interruptions, transmission line and transformer performance, and shares experiences on system problems. Key metrics like SAIFI, SAIDI, and transmission line and transformer availability remained high, generally above 99%, indicating high system reliability over the period.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 40

Report on System Performance and

Experience Sharing
(1 June 2014 – 31 May 2015)
Pichit Phongprasert
Electricity Generating Authority of Thailand
Outline

• Egat Transmission System


• System Performance Statistic
• SAIFI, SAIDI and System Minute
• Transmission Line Performance statistic
• Transformer Performance statistic
• GIS Performance Statistic
• Experience Sharing on System Problems
• Tx. And Instrument Tx.
• Circuit Breaker and GIS
• Transmission Line

2
Outline

• Egat Transmission System


• System Performance Statistic
• SAIFI, SAIDI and System Minute
• Transmission Line Performance statistic
• Transformer Performance statistic
• GIS Performance Statistic
• Experience Sharing on System Problems
• Tx. And Instrument Tx.
• Circuit Breaker and GIS
• Transmission Line

3
Egat Transmission System
(as June 2015)

Voltage Substation Transmission Line


(kV) No. MVA (Circuit-km)
500 kV AC 13 21,849.99 4,746.488

230 kV AC 75 54,560.04 14,625.672

132 kV AC - 133.40 8.705

115 kV AC 128 14,579.99 13,830.977

69 kV AC - - 19.000

300 kV DC - 388.02 23.066

Total 216 91,511.44 33,253.908

4
Egat Transmission System

2012 2013 2014 2015*

Substations 212 213 215 216

Transformer Capacity (MVA) 86,730.19 87,148.94 88,461.44 91,511.44

Overhead Line (circuit-km) 31,556.46 32,384.24 32,526.99 33,253.91

Maximum Demand (MW) 26,121.10 26,598.14 26,942.10 27,345.80

* Data of June 2015


5
Outline

• Egat Transmission System


• System Performance Statistic
• SAIFI, SAIDI and System Minute
• Transmission Line Performance statistic
• Transformer Performance statistic
• GIS Performance Statistic
• Experience Sharing on System Problems
• Tx. And Instrument Tx.
• Circuit Breaker and GIS
• Transmission Line

6
System Average Interruption Frequency Index :
SAIFI
SAIFI (occ/point)
0.40
0.36
0.35 0.33
0.3
0.30
0.25
0.20 0.17 SAIFI
0.15
0.10 0.07
0.05
0.00
2011 2012 2013 2014 2015*
*Data of June 2015
7
System Average Interruption Duration Index :
SAIDI
SAIDI (minute/point)
16.00
14.43 13.97
14.00
12.00
10.00
8.00 6.79 SAIDI
6.00
4.00
2.06
2.00 0.70
0.00
2011 2012 2013 2014 2015*
*Data of June 2015
8
System Interruption Severity Index : SISI

SISI (MW-minute/MW)
9.00 8.55
8.00
7.00
6.00
5.00
4.00 3.62 SISI
3.00
1.98
2.00
1.00 0.64 0.34
0.00
2011 2012 2013 2014 2015*

*Data of June 2015


9
Outline

• Egat Transmission System


• System Performance Statistic
• SAIFI, SAIDI and System Minute
• Transmission Line Performance statistic
• Transformer Performance statistic
• GIS Performance Statistic
• Experience Sharing on System Problems
• Tx. And Instrument Tx.
• Circuit Breaker and GIS
• Transmission Line

10
Transmission Line Trip Out Statistic
(June 2014 – May 2015)

Failure
Voltage Transmission Line No. of Failures (per 100 cct.-
(kV) (Circuit-km)
km/yr)

500 4,746.488 14 0.29

230 14,625.672 115 0.79

132 8.705 0 0.00

115 13,830.977 295 2.13

69 19.000 0 0
11
Transmission Line Trip Out Statistics

Trip Out on Transmission Line


(June 2014 – May 2015)
80 72
70
60
50 46

40 36
30
30 22 24 115 kV
20 14 12
15 230 kV
9 8 9 10 9 8 9
10 5
2 0
5 6 5
500 kV
0 0 0 0 0 0 1 0 0 0 0
0

12
Transmission Line Trip Out Statistics

Trip Out on Transmission Line


(June 2014 – May 2015)
Lightning

9% Unknown
14%
3% 5% Tree
Truck and Construction

9% Fire
Animals
3%
32%
Bird amd Pollution
1%
Transmission Line Equipment
17% Protection Equipment

5% Foreign Object
2%
Other
13
Transmission Line Availability (%)

TLAF (%)
99.985 99.987 99.983 99.995 99.984
100.00
99.90
99.80
99.70
99.60
99.50
TLAF
99.40
99.30
99.20
99.10
99.00
2011 2012 2013 2014 2015*

*Data of June 2015


14
Transmission Line Outage Frequency : TLOF

TLOF (occ./100 cct.-km)


18.00
16.00
14.00
12.00
2012
10.00
2013
8.00
2014
6.00
2015*
4.00
2.13 2.04
2.00 0.79
0.29 0
0.00
500kV 230kV 115kV 69kV System

*Data of June 2015


15
Outline

• Egat Transmission System


• System Performance Statistic
• SAIFI, SAIDI and System Minute
• Transmission Line Performance statistic
• Transformer Performance statistic
• GIS Performance Statistic
• Experience Sharing on System Problems
• Tx. And Instrument Tx.
• Circuit Breaker and GIS
• Transmission Line

16
Transformer Trip Out Statistics
(June 2014 – May 2015)

No. of Major Failure (per 100


Voltage Level Installed Units
Failures units installed)

500 kV 63 1 1.51

230 kV 187 3 0.00

115 kV 349 1 1.11

69 kV 2 0 0.00

17
Transformer Availability (%)

TRAF (%)
100.00
99.90 99.862
99.80 99.752
99.70 99.672
99.60
99.50 99.426 TLAF
99.40
99.30
99.20
99.10 99.062
99.00
2011 2012 2013 2014 2015*

*Data of June 2015


18
Transformer Outage Frequency: TROF (Occ./Unit)

TROF (occ./Unit)
1.20
1
1.00

0.80
2012
0.60 2013
2014
0.40 0.34
0.32
0.29 2015*
0.22 0.24
0.18 0.2 0.15
0.20 0.1
0.13 0.14
0.05 0.05 0.07 0.07
0 0 0 0
0.00
500kV 230kV 132 kV 115kV System

*Data of June 2015


19
Outline

• Egat Transmission System


• System Performance Statistic
• SAIFI, SAIDI and System Minute
• Transmission Line Performance statistic
• Transformer Performance statistic
• GIS Performance Statistic
• Experience Sharing on System Problems
• Tx. And Instrument Tx.
• Circuit Breaker and GIS
• Transmission Line

20
Circuit Breaker and GIS
Statistics Period: June 2014 - May 2015

Failure
Substation Installed
No. of Failures (per 100 units
Equipment Units
installed)

500 kV Circuit Breaker 141 1 0.709

230 KV Circuit Breaker 1163 24 2.064

115 kV Circuit Breaker 1906 37 1.941

500 kV GIS 91 0 0

230 kV GIS 149 0 0

115 kV GIS 25 0 0
Major Failure of Circuit Breaker and GIS

CB GIS
Outline

• Egat Transmission System


• System Performance Statistic
• SAIFI, SAIDI and System Minute
• Transmission Line Performance statistic
• Transformer Performance statistic
• GIS Performance Statistic
• Experience Sharing on System Problems
• Tx. And Instrument Tx.
• Circuit Breaker and GIS
• Transmission Line

23
Case 1 – Tx. and Instrument Tx.

On 22 November 2014
RY1-KT1A was trip by oil flow relay.
Outage 30.6 MW 1 minute

24
DC Resistance Measurement after Failure

• DC resistance measurement show


the problem of main contact at
terminal number 8 and 9

25
Root Cause Analysis

All flexible leads of moving main- Root cause : Deterioration of


switch contact of OLTC breaked flexible lead from using,
while changing from tap N to 1L then unreset counter 157,218 times
severe arcing at moving main
contact made the oil expansion to
trip the oil flow relay

26
OLTC MR Type H in EGAT System

CROD
NROD

27
Solving

Short-term Solving :
1. Change flexible lead by 50 MVA spare transformer in the system
2. All Tx which using MR type H and V sent the example oil for DGA
3. All Tx which using MR type H and V will be inspect by supervisor

Long-term Solving : Prepare spare for OLTC MR type H which


have the counter over 100,000 times.

28
Outline

• Egat Transmission System


• System Performance Statistic
• SAIFI, SAIDI and System Minute
• Transmission Line Performance statistic
• Transformer Performance statistic
• GIS Performance Statistic
• Experience Sharing on System Problems
• Tx. And Instrument Tx.
• Circuit Breaker and GIS
• Transmission Line

29
Case 2 – Circuit Breaker and GIS

Impact
Bird to 500อาคาร
Eye View kV GIS
500caused
kV GISby foundation collapsed

2nd Stage
1st Stage in 1990 extension
in 2006

3rd Stage
extension in 2011
Metallic bellow level of extension side
lower than existing level max. -40 mm.

40 mm

Existing floor level

Extension floor level

Existing GIS Extension GIS


Root Cause Foundation of extension building collapsed

Failure Effect Mechanical force applied bellows over design criteria

Risk Assessment Internal Flashover/Breakdown

Immediate Action Split enclosure that over stress from the system
Before
Split Bus

After Split
Bus
Outline

• Egat Transmission System


• System Performance Statistic
• SAIFI, SAIDI and System Minute
• Transmission Line Performance statistic
• Transformer Performance statistic
• GIS Performance Statistic
• Experience Sharing on System Problems
• Tx. And Instrument Tx.
• Circuit Breaker and GIS
• Transmission Line

34
Case 3 - Transmission Line

• A transmission line lightning Trip out close to substation caused to


damage substation equipment failure

Bkr CT-700812
3 km

35
CT Substation
13:40 CT 700012, 700412, 700612, 700712, 700812, 7001012, 700112, 701212,
KRD 7012,7022 (115 kV Main Bus No.1 , 115 kV Line CT-KRD Trip )
Relay Line KRD Relay (SIEMEN) : Trip A, G Zone 1
Distance Shown 3.2 km (Line distance 25.2 km)
: 700812 Bkr. Fail Op. , 86B1
Ann. : 700812Trip
: 115 kV KRD Pri. Distance Relay Trip
: 115 kV KRD KWH Main Loss Of PT.
: Line Fault Locator Fail
36
A Structure No 8/2 with high resistance ground,
lightning strike at conductor phase A and flashover
Lightning impulse exceeding the insulation level of Breaker
CT-700812 caused breaker failure and 115 kV Main Bus No.1
trip

38
Mitigation Methods

Install more overhead ground wire


Lower structure grounding resistance close to substation – within
5 km
Install line surge arrester on the first tower of the line entering the
substation

39