0% found this document useful (0 votes)
38 views

No Client No of Elevator Schedule Date Remark Collection

This document is a schedule for elevator maintenance for various clients from March 6th to March 24th. It lists the client name, number of elevators, scheduled date, any remarks, and date of last collection. Fifteen clients are listed, with dates ranging from March 6th to March 24th and some remarks noting if the work is done or collection was on a certain date.

Uploaded by

elias
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views

No Client No of Elevator Schedule Date Remark Collection

This document is a schedule for elevator maintenance for various clients from March 6th to March 24th. It lists the client name, number of elevators, scheduled date, any remarks, and date of last collection. Fifteen clients are listed, with dates ranging from March 6th to March 24th and some remarks noting if the work is done or collection was on a certain date.

Uploaded by

elias
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

No of

No Client Schedule date remark Collection


Elevator
1 Yohanes derse 2 06/03/2020 Done 2-Apr-20
2 Dagi plc 2 08/03/2020 Done
3 Tensaye 2 09/03/2020 Done
Bekele abshroplc 1(bedesta
4 2 12/03/2020 Done
bldg..)
5 Bekele Abshro plc (bawa bldg) 1 11/03/2020
6 New bright 1 12/03/2020 Done
7 Tezez hotel 1 13/03/2020 Done
8 Homage hotel 1 18/03/2020 Done
9 Jupiter 2 15/03/2020 Done
10 Bata hotel 1 18/03/2020
11 Chirchil hotel 2 22/03/2020
12 farid 1 23/03/2020
13 Dangote 2 24/03/2020
14 Sil 1 19/03/2020 Done
15 Aster 1 Done

You might also like