0% found this document useful (0 votes)
220 views17 pages

Design A Beams by Eurocode

The document provides details on the design of a reinforced concrete beam, including its dimensions, material properties, loads, and calculations to determine the required reinforcement. The beam is 8 meters long with a 500mm depth and 110mm thick slab. It is designed to resist a distributed load of 3 kN/m^2 and calculations are shown to find the bending moment and reinforcement needed at different spans.

Uploaded by

Soubra Senmarec
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
220 views17 pages

Design A Beams by Eurocode

The document provides details on the design of a reinforced concrete beam, including its dimensions, material properties, loads, and calculations to determine the required reinforcement. The beam is 8 meters long with a 500mm depth and 110mm thick slab. It is designed to resist a distributed load of 3 kN/m^2 and calculations are shown to find the bending moment and reinforcement needed at different spans.

Uploaded by

Soubra Senmarec
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

1

REF OUTPUT
Φ

Dimension:
Span , L 8000
width, B 3000
Slab Thickness 110
Beam size 225 500 mm
Characteristic loads
Finishes etc 1.5 KN/m2
Variable, qk 3 KN/m2
Materials:
Unit weight of concrete 25 KN/MM3
Characteristic strength of concrete, fck 25 KN/mm2
Characteristic strength ofsteel, fyk 500 KN/mm2
Characteristic strength of link, fyk 500 KN/mm2
Nominal concrete cover 30 mm
Assumed :
Φbar1 = 20 mm
Φbar2 = 12 mm
Φlink = 6 mm
5.3.2.1

Distributed load 33.36 KN/m

Moment 269 KNm


2

REF CALCULATIONS OUTPUT


L= 8000 mm
L= 8000 mm
L= 8000 mm
span 1-2 span2-3 span3-4
Bw = 225 mm 225 mm 225 mm
hf = 110 mm 110 mm 110 mm
h = 500 mm 500 mm 500 mm
b1 = 1400 mm 1400 mm 1400 mm
b2 = 1400 mm 1400 mm 1400 mm

Actual flange with


b = b1 + b 2 + b w
= 3025 mm
Span 1-2
Effective flange width
LO = 0.85 X L 6800
beff , = ∑ b eff , I + bw < b 2145 2145
beff , 1 0.2b
= i + 0.1l0 < 0.2lo 960 960
beff , 1 0.2b
= i + 0.1l0 < 0.2lo 960 960

5.3.2.1 Span 2-4

b = b1 + b 2 + b w = 3025 mm
LO = 0.7 X L 5600
beff , = ∑ b eff , I + bw < b 1905 1905
beff , 1 0.2b
= i + 0.1l0 < 0.2lo 840 840
beff , 1 0.2b
= i + 0.1l0 < 0.2lo 840 840

Span 4-5

b = b1 + b 2 + b w = 3025 mm
LO = 0.85 X L 6800
beff , = ∑ b eff , I + bw < b 2145 2145
beff , 1 0.2b
= i + 0.1l0 < 0.2lo 960 960
3

beff , 1 0.2b
= i + 0.1l0 < 0.2lo 960 960

ACTIONS

Actions on slab:
Self-weight = 2.75 KN/m2
Finishes 1.5 KN/m2
Characteristic permanent load, g k 4.25 KN/m2
characteristic variable load, qk 3 KN/m2

Actions of beamC/A-D

Distribution of action from slabs to beam are as follows


Panel 1-1a/A-D:
ly/lx = 2.6666666667 > 2
one way

shear coefficient, Bv 0.5


4

MAIN REINFORCEMENT

Span 1-2
Effective depth , d = h-cnom - Φlink - 0.5Φbar = 454 mm

Bening moment,
M = 193.68 KNm

Mf = 0.567fck bhf(d-0.5hf)
1334.4919088 KNm

M > Mf
Neutral axis within flange

k = M/fck bd2
= 0.0175228912

z = d [ 0.5 ( 0.25 - k / 1.134)1/2]


= 0.9843012647 0.95

Area of tension reinforcement


As = M/0.87 fykz
= 1032.3240884 mm2

9.2.1.1 Minimum and maximum reinforcement area

As,min = (0.26(fctm/fyk)bd
= 135.98208 135.98208 mm2

As, max = 0.04Ac


4500 mm2

support 2
5

Effective depth , d = h-cnom - Φlink - Φbar = 444 mm

M = 237 KNm

k = M/fck bd2
= 0.2137272408

Redistribution =

Kbal = 0.454(δ-k1 )/k2 - 0.182[(δ-k1)/k2]2


= 0.166863872

k < Kbal
compression reinforcement is required

d' = c + Φlink + 0.5Φbar


= 46

z = d [ 0.5 ( 0.25 - kbal / 1.134)1/2]


= 0.820708167 0.8207082
= 364.39442616

x = (d-z)/0.4
= 199.0139346

d'/x = 0.2311395938 0.2311396

Area of compression steel


A's = (k - kbal )fck bd2/(0.87fyk(d-d')
= 300.15780615

Area of tension steel

As = kbal fck bd2/0.87 fykz + A's


= 1467.4774708

As,min = (0.26(fctm/fyk)bd 132.98688 132.98688 mm

As, max = 0.04Ac


6

= 4500 mm

span 2-4
Effective depth , d = h-cnom - Φlink - 0.5Φbar = 454

M= 151 kNm

Bening moment,
M = 150.64 KNm

Mf = 0.567fck bhf(d-0.5hf)
= 1185.1781288
M < Mf
Neutral axis within flange

k = M/fck bd2
= 0.0153459441

z = d [ 0.5 ( 0.25 - k / 1.134)1/2]


= 0.98627916 0.95

Area of tension reinforcement


As = M/0.87 fykz
= 802.91873539 mm2
As,min = (0.26(fctm/fyk)bd
= 135.98208 135.98208 0.0013bd

As, max = 0.04Ac


4500 mm2
support 4

Effective depth , d = h-cnom - Φlink - Φbar = 444 mm


7

M = 237 KNm

k = M/fck bd2
= 0.2137272408

Redistribution =

Kbal = 0.454(δ-k1 )/k2 - 0.182[(δ-k1)/k2]2


= 0.166863872

k < Kbal
compression reinforcement is required

d' = c + Φlink + 0.5Φbar


= 46

z = d [ 0.5 ( 0.25 - kbal / 1.134)1/2]


= 0.820708167 0.8207082
= 364.39442616

x = (d-z)/0.4
= 199.0139346

d'/x = 0.2311395938 0.2311396

Area of compression steel


A's = (k - kbal )fck bd2/(0.87fyk(d-d')
= 300.15780615

Area of tension steel

As = kbal fck bd2/0.87 fykz + A's


= 1467.4774708

As,min = (0.26(fctm/fyk)bd 132.98688 132.98688 mm

As, max = 0.04Ac


= 4500 mm
8

span4-5
Effective depth , d = h-cnom - Φlink - 0.5Φbar = 454

M= 151 kNm

Bening moment,
M = 193.68 KNm

Mf = 0.567fck bhf(d-0.5hf)
= 1334.4919088
M < Mf
Neutral axis within flange

k = M/fck bd2
= 0.0175228912

z = d [ 0.5 ( 0.25 - k / 1.134)1/2]


= 0.9843012647 0.95

Area of tension reinforcement


As = M/0.87 fykz
= 1032.3240884 mm2
As,min = (0.26(fctm/fyk)bd
= 135.98208 135.98208

As, max = 0.04Ac


4500 mm2

SHEAR REINFORCEMENT
6.2.3 Concrete strut capacity

VRd, max = 0.36bwd fck ( 1-fck/250)/(cot θ + tan θ)


= 285.32 KN cot θ = 2.5
413.71 KN cot θ = 1
9

Support 1

Ved = 0.45 F
= 0.45*269
= 121.05 KN
< vRd, max cotθ =2.5
< vRd, max cotθ =1.0

Therefore angle θ < 22°


Shear links

Asw / s = Ved / 0.78fyk dcotΦ


= 0.2818808262

try link : H 6

ASW = 56.52 mm2


Spacing , s = 200.51026796 < 0.75 d
9.2.2(6) 340.5

6.2.3(7)
Additioinal longitudinal reinforcement
additional tensile force,
ΔFtd = 0.5V ed cot Φ
= 150.102 KN

Med , max / z =
449.06097844 KN > ΔFtd

As,req = ΔFtd /0.87fyk


= 345.06206897 mm2

Support 2

Ved = 0.60 F
= 0.60*269
= 161.4 KN
< vRd, max cotθ =2.5
10

< vRd, max cotθ =1.0

Therefore angle θ < 22°


Shear links

Asw / s = Ved / 0.78fykcotΦ


= 0.3758411016

try link : H 6

ASW = 56.52 mm2


Spacing , s = 150.38270097 > 0.75 d
9.2.2(6) 150.3827

6.2.3(7)
Additioinal longitudinal reinforcement
additional tensile force,
ΔFtd = 0.5V ed cot Φ
= 200.136 KN

Med , max / z =
449.06097844 KN > ΔFtd

As,req = ΔFtd /0.87fyk


= 460.08275862 mm2
Support 2

Ved = 0.55 F
= 0.55*269
= 147.95 KN
< vRd, max cotθ =2.5
< vRd, max cotθ =1.0

Therefore angle θ < 22°


Shear links

Asw / s = Ved / 0.78fykcotΦ


= 0.3445210098

try link : H 6

ASW = 56.52 mm2


11

Spacing , s = 164.0538556 > 0.75 d


9.2.2(6) 164.05386

6.2.3(7)
Additioinal longitudinal reinforcement
additional tensile force,
ΔFtd = 0.5V ed cot Φ
= 183.458 KN

Med , max / z =
449.06097844 KN > ΔFtd

As,req = ΔFtd /0.87fyk


= 421.74252874 mm2

Support 4

Ved = 0.55 F
= 0.55*269
= 147.95 KN
< vRd, max cotθ =2.5
< vRd, max cotθ =1.0

Therefore angle θ < 22°


Shear links

Asw / s = Ved / 0.78fykcotΦ


= 0.3445210098

try link : H 6

ASW = 56.52 mm2


Spacing , s = 164.0538556 > 0.75 d
9.2.2(6) 164.05386

6.2.3(7)
Additioinal longitudinal reinforcement
additional tensile force,
ΔFtd = 0.5V ed cot Φ
= 183.458 KN
12

Med , max / z =
449.06097844 KN > ΔFtd

As,req = ΔFtd /0.87fyk


= 421.74252874 mm2
Support 4

Ved = 0.6 F
= 0.6*269
= 161.4 KN
< vRd, max cotθ =2.5
< vRd, max cotθ =1.0

Therefore angle θ < 22°


Shear links

Asw / s = Ved / 0.78fykcotΦ


= 0.3758411016

try link : H 6

ASW = 56.52 mm2


Spacing , s = 150.38270097 > 0.75 d
9.2.2(6) 150.3827

6.2.3(7)
Additioinal longitudinal reinforcement
additional tensile force,
ΔFtd = 0.5V ed cot Φ
= 200.136 KN

Med , max / z =
449.06097844 KN > ΔFtd

As,req = ΔFtd /0.87fyk


= 460.08275862 mm2
Support 4

Ved = 0.45F
= 0.45*269
= 121.05 KN
< vRd, max cotθ =2.5
13

< vRd, max cotθ =1.0

Therefore angle θ < 22°


Shear links

Asw / s = Ved / 0.78fykcotΦ


= 0.2818808262

try link : H 6

ASW = 56.52 mm2


Spacing , s = 200.51026796 > 0.75 d
9.2.2(6) 200.51027

6.2.3(7)
Additioinal longitudinal reinforcement
additional tensile force,
ΔFtd = 0.5V ed cot Φ
= 150.102 KN

Med , max / z =
449.06097844 KN > ΔFtd

As,req = ΔFtd /0.87fyk


= 345.06206897 mm2

9.2.2(5)
minimum links

Asw / s = 0.08fck 1/2 bw/fyk


= 0.18

try link : H 6 ASW = 56.52

9.2.2(6) Spacing , s 314 < 0.75d

shear resistance of minimum links


Vmin = (Asw /s)(0.78fykcotΦ)
= 79.677 KN
14

Link arrangement

x1 = 118.66160072 m
x2 = 159.01160072 m
x4 = 145.56160072 m
x5 = 118.66160072 m

6.2.4 Transverse steel in the flange


The longitudinal shear stresses are the greatest over
a distance Δx measured from the point of zero moment

Δx = 0.5(0.3L) = 1200 mm *Estimate


The change in moment over distance Δx from zero moment
= 135.576

The change in longitudinal force,


Δftd = 152.0736106 KN

Longitudinal shear stress


Ved = Δftd /(hf Δx)
= 1.1520728076 KN/mm2

6.2.4(6) Ved = 0.27fctk = 0.486 N/mm2

Transverse shear reinforcement is required

Concrete strut capacity in the flange


Ved max = 0.4fck (1-fck/250)/(cotθ+tanθ)
= 3.5938597952 c cotθ = 2.0056897
4.5 cc cotθ = 1
cc
< vRd, max cotθ =2.5
c
< vRd, max cotθ =1.0
Therefore angle θ < 26.5 °

-1
θ = 0.5*sin [ved /0.2fck(1-fck/250)]
= 7.4169034469 °
use : θ = 26.5 tan θ = 0.4985816
cot θ = 2.006
transverse shear reinforcement
Asf /sf = ved hf /0.87 fyk cotθ
15

= 0.1452286919

Try : H 10 Asf = 78.539816 mm2

Spacing , sf = 540.80096237 mm

9.2.1.1 Minimum transverse steel area,


As,min = (0.26(fctm/fyk)bhf use H10
= 146.71593622 mm2/m 157mm2/m)

7.4 DEFLECTIOIN
Percentage of required tension of reinforcement
ρ = As,required / bd
= 0.010105963

Reference reinforcement ratio,


ρo = (fck)1/2 x 10-3 =
0.005

Percentage of required compression reinforcement,

ρ' = As',required / bd = 0

ρ > ρo #NAME?

k[11 +1.5√fck po/ρ +3.2√fck (po/ρ -1)3/2] (1)


k[11 +1.5√fck (po/ρ-ρ' ) +1/12√fck √ (ρ' /ρo )] (2)

k end slab = 1.3


k interior slab = 1.5

= k[11 +1.5√fck po/ρ +3.2√fck (po/ρ -1) ]


3/2
l/d (1)
#NUM!

Modification factor for span less than 7m 1

Modification factor for steel area provided,


Aprov /As,required = #DIV/0!
Therefore allowable span effective depth ratio,
16

(l/d) allowable = #NUM!

(l/d)actual = #VALUE! #NUM! (l/d) allowable


17

157mm2/m)

You might also like