This checklist is for backfilling at the KMI Project Assembly Shop location. It contains 8 items to check including barricading the area, clearing structural defects, ensuring MEP clearance, marking layers from the top of poured concrete, checking the required water content and compactor load, compacting to 95%, and having test reports for compacting subsequent layers. The checklist is to be verified by the site engineer, L&W engineer, and HEC.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
295 views
Checklist For Backfilling
This checklist is for backfilling at the KMI Project Assembly Shop location. It contains 8 items to check including barricading the area, clearing structural defects, ensuring MEP clearance, marking layers from the top of poured concrete, checking the required water content and compactor load, compacting to 95%, and having test reports for compacting subsequent layers. The checklist is to be verified by the site engineer, L&W engineer, and HEC.