WS 005

The document provides specifications for the concrete mix design and reinforcement details for building foundations and columns. It specifies a M25 concrete mix with a minimum cement content of 300 kg/cum. The pile cap dimensions range from 5'-0" x 5'-0" to 7'-6" x 7'-6" with varying bar diameters and spacings. Lap splices for reinforcement bars can only be provided in the central half of members and no more than 50% of bars can be spliced at one section. Stirrups/hoops must be provided over the entire splice length at a maximum spacing of 150mm. The drawing provides ductile detailing requirements for columns according to IS 13920 including number and spacing of ties.

Uploaded by

Er Navneet Jassi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views

WS 005

The document provides specifications for the concrete mix design and reinforcement details for building foundations and columns. It specifies a M25 concrete mix with a minimum cement content of 300 kg/cum. The pile cap dimensions range from 5'-0" x 5'-0" to 7'-6" x 7'-6" with varying bar diameters and spacings. Lap splices for reinforcement bars can only be provided in the central half of members and no more than 50% of bars can be spliced at one section. Stirrups/hoops must be provided over the entire splice length at a maximum spacing of 150mm. The drawing provides ductile detailing requirements for columns according to IS 13920 including number and spacing of ties.

Uploaded by

Er Navneet Jassi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

REGD.No.

1173

NOTES:-
TP TECH PECIFIC
1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE SPECIFIED.
STRUCTURAL CONSULTANTS
JOINT Morth No:-RW/NH-34054/1/2014-S&R(B)
2. M25 CONCRETE MIX FOR ALL. Category=II(17)
ROOF LVL.
3. THE ENGINEER-IN-CHARGE MAY GET THE CONCRETE MIX Office: Plot No.-307, Sector-79, Mohali
DESIGNED BUT CEMENT CONTENT SHOULD NOT BE LESS THAN Mob. No.- +91-8968012763
300 Kg/Cum FOR M25 MIX.
E-mail: [email protected]
4. P.C.C UNDER FOOTING IS 1:4:8.
5. MINIMUM CLEAR COVER TO THE REINFORCEMENT IS TO BE
PROVIDED AS FOLLOWS:

H/6
FOUNDATION 50mm
A REGION COLUMNS 40mm
BEAMS 25mm
SLAB 20mm NOTE-
6. REINFORCEMENT BARS TO BE USED SHALL BE TMT BARS A.S.P- AS PER SITE
P.L -PLINTH LEVEL
CONFORMING TO IS 1786.
7. IS 456-2000, IS 13920 SHALL BE REFERRED FOR DETAILING OF
REINFORCEMENT AND TO MEET DUCTILITY REQUIREMENTS.
all over lap in
middle half
H

8 (a) LAP SPLICES TO BE PROVIDED ONLY IN THE


CENTRAL HALF OF THE MEMBER LENGTH AND
NOT MORE 50% OF THE BARS SHALL BE SPLICED
AT ONE SECTION.
B REGION
(b) HOOPS/STIRRUPS SHALL BE PROVIDED OVER THE
ENTIRE SPLICE LENGTH AT THE SPACING NOT
EXCEEDING 150mm.
9. HOOKS FOR TIES/STIRRUPS = 13.5D
H/6

A REGION

N.S.L

FOUNDATION D d ASB
LXB
5'-0" x 5'-0" 1'-0" 0'-8"
6'-9" x 6'-9" 1'-4" 0'-10"
4'-0"

7'-6" x 7'-6" 1'-6" 0'-10"


D

Ld
d
4"

P.C.C 1:4:8 9" 9"


1'-6"
CLIENT-
1'-6"
4" BxL 4" W/S & SANITATION DIVISION
ASB FATEHGARH SAHIB
DUCTILE DETAILING OF
COLUMN & FOUNDATION AS PER IS13920 PROJECT- 10 No. TOILET BLOCK
C1 C2 C1A C2A FATEHGARH SAHIB
TABLE: DUCTILE DETALING FOR COLUMNS Y Y Y Y

A
DRAWING TITLE-
8 o @ 100 c/c X X X X
(REGION) FOR H/6 ESO. JOINT FOUNDATION DETAIL
B 8 o @ 150 c/c DRAWING NO-
(REGION) FOR REST PORTION
STC-001
SHEET NO. REVISION-
02/06