0% found this document useful (0 votes)
64 views

CVI Form

1) This document is a confirmation of verbal instructions regarding revisions to the installation for the granite elevator lobby of the Avalon project located in Ayala Business Park, Cebu City. 2) The instructions were discussed on December 22, 2011 in a telephone conversation with architects Stephen Charles U. Liu and Timoty P. Lazarte. 3) Details of the revisions and any cost implications were to be provided by the architects in their response by the expected response date.

Uploaded by

Jyles Sirab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

CVI Form

1) This document is a confirmation of verbal instructions regarding revisions to the installation for the granite elevator lobby of the Avalon project located in Ayala Business Park, Cebu City. 2) The instructions were discussed on December 22, 2011 in a telephone conversation with architects Stephen Charles U. Liu and Timoty P. Lazarte. 3) Details of the revisions and any cost implications were to be provided by the architects in their response by the expected response date.

Uploaded by

Jyles Sirab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

PRIMARY

STRUCTURES
CORPORATION

CONFIRMATION OF VERBAL INSTRUCTION


Project AVALON Reference No.: CVI-PSC-Avalon-AR #
Location Ayala Business Park, Cebu City Date: 12/22/2011
No. of copies including this page:

To Arch't. Stephen Charles U. Liu Civil Plumbing


Arch't. Timoty P. Lazarte Architectural Mechanical
Subject Revise Installation for Granite Elevator Lobby Electrical
Expected date of response :

This serves as a confirmation of our telephone personal conversation regarding the following matters:
Cell Phone VHF Radio
ITEM DETAILS SKETCH
( indicate exact location) ( use additional sheet if necessary )
1

Item(s) with cost implication : 1 Additive Deductive


2 Additive Deductive
3 Additive Deductive
( check above for the nature of cost)
RESPONSE: (Provide additional sheet if not enough)
Approved
Disapproved
Approved with comments

Prepared by : Confirmed and Acknowledged by :

Juncel A. Merced
Project In-Charge (signed over printed name)
Date :
Noted by :

TRV3
Project Manager

You might also like