PSV Tag No. 10A1 Set Pressure Loop Considered Calculation Reference C-22 and HX-27 API-521, 5TH EDITION, MARCH 2007
PSV Tag No. 10A1 Set Pressure Loop Considered Calculation Reference C-22 and HX-27 API-521, 5TH EDITION, MARCH 2007
C-22 HX-27
Operating Flow Rate (LIQUID) 5160 Kg/hr Operating Flow Rate (LIQUID) NA m3/hr
Operating Flow Rate (VAPOR) 30 m3/hr Operating Flow Rate (VAPOR) 2300 m3/hr
Operating Density (LIQUID) 780 Kg/m3 Operating Density (LIQUID) NA Kg/m3
Operating Density (VAPOR) 2.5 Kg/m4 Operating Density (VAPOR) 0.39 Kg/m3
# SULZER CONFIDENTIAL
OVERFILLING-When P-22 and P-27 discharge and all other discharge (2XV-closed) are blocked and P-04B and flow through D-21 is running
EQUIMENTS CONSIDERED C-22,HX-27
P-04B PUMP FLOW RATE TO C-22 1.1 m3/hr
Discharge pressure of pump P-04B 5.23 barg So pump P-04B can cause overpressurization
FLOW FROM D-21 6.2 m3/hr
STEAM FLOW 30 m3/hr 0.075
Total Flow to HX-08 37.3 m3/hr
HX-27 HX-27
DIAMETER (m) 0.453 DIAMETER (m) 0.453
VAPOR SPACE LENGTH (m) (TL to Tube Height - NL Height) 2.25 HEIGHT (m) (TL to Tube Height) 2.853
TOTAL 'HX-03' VOLUME FOR FILLING (m3) 0.362450396 TOTAL 'HX-03' VOLUME (m3) 0.459587102
TOTAL SYSTEM VOLUME Available for Filling (m3) 2.07 TOTAL SYSTEM VOLUME (m3) 3.82
Time required for overfilling is less than 30 min i. e. operator response time as per API guidelines. Special
Instrumental control or control logic is required.
# SULZER CONFIDENTIAL
BLOCKED DISCHARGE- 2XV-10A4 stuck closed
In this condition P-22 and P-27 are running while vacuum system failed. System pressure will go on increasing. Even accumulation rate will be very less compare to
overfilling conditon as P-22 and P-27 are running continously.
So relife load for this case is always lesser than overpressurization case. And also time required for overfilling will be also high so operator can get enough time.
# SULZER CONFIDENTIAL
TUBE RUPTURE - HX-27 tube rupture
Pressure Condition Ptube> Pshell
So tube side liquid will enter in shell side at around 40 C and 190 mbara pressure. But it will be exposed to 320oC
o
Therefore, tubeside fluid will evaporate immediately at 320oC and 190 mbara.
Therefore, Mixed-phase flow should be considered.
TUBE SIDE DESIGN PRESSURE (BAR-A) 8
SHELL SIDE DESIGN PRESSURE (BAR-A) 2.5
TUBE DIAMETER (MM) 19.05
UPSTREAM HIGH LIQUID PRESSURE (bar-a) 5
PSV SET PRESSURE (bar-a) 2
PRESSURE DIFFERENCE (dP) (bar-a) 3
RESISTANCE COEFFICIENT (k) 1.5 PER TABLE-13 API-521, MAY 2008
LIQUID DENSITY (Kg/M3) 998.00
W = 2*0.0003512*D^2*SQRT(dP*Liq. Density/K)
PHASE
Liquid Relief Load (W) kg/s 10.21 LIQUID
Kg/hr 36771.66363 LIQUID
For Two Phase Flow
Mass Flux G=96.3*sqrt(ρl(P1-P))
Liquid Density At Relief Valve Inlet (ρl) lb/ft3 62.30
Pressure at Sfety Valve Inlet (P1) psia 29.40
Down Stream Back-Pressure (P) psia -44.10
In Above equation flow should be adjusted such that the Area will be same as that we considered Initially
9.8125 mm2
Initial area cosidered was twice the cross sectional area of tube
9.8125E-06 m2
ρl 1.50 kg/m3
6516.68 lb/(s*ft2)
G
114519646.94 Kg/(hr*m2)
Correction Factor for Back-Pressure (Kb) 1
Combination Correction Factor For Installation with RD (Kc) 1
Discharge Coefficient of Valve (Kd) 0.8
Flow can be calculated as: Q=A*(G*Kb*Kc*Kd)/(0.3208*ρl)
Total Relief Load On PSV will be 1868.202885 m3/hr Mixed Phase Load
# SULZER CONFIDENTIAL
Fire Case-APPLICABLE FOR EQUIPMENTS HAVING ELEVATION LESSS THAN 25 FT or 7.62m, PER API-521
EQUIPMENT TAG NO c-22 HX-27
DIAMETER (m) 0.61 0.453 m
ELEVATION 6.38 8.55 m
LIQUID LEVEL IN VESSEL (HLL) 1.1 m
# SULZER CONFIDENTIAL
Control Valve Failure-LCV-9A01
Flow from D-21 to C-22 12080 lb/hr From simulation stream # S88
5484.32 kg/hr
Upstream pressure(P1) 69.75 bara
Downstream Pressure (P2) 29.75 bara
Pressure Drop (ΔP) 40
Since only liquid is flowing through S88 to C-22 fluid is assumed non-compressible.
Flow coefficient Cv 1.47452904 calculated Cv is 1.475. Therefore, valve Cv should be selected such that it will have proper
operating range.
For stream S89 flow mass flow rate of liquid and vapor
Total (lb/hr) liquid (lb/hr) vapor (lb/hr)
12080 9495 2585
Wt fraction flow 0.786009934 0.213990066
# SULZER CONFIDENTIAL
Blow by-FCV-10A1
Steam Flow to C-22 180 lb/hr From simulation stream # S88
81.72 kg/hr
Upstream pressure(P1) 3.5 bara
Downstream Pressure (P2) 0.19 bara
Pressure Drop (ΔP) 3.31 bar
Flow coefficient Cv 1.312458082 calculated Cv is 0.437. Therefore, valve Cv should be selected such that it will have proper
operating range.
# SULZER CONFIDENTIAL