SA4 – Assignment n. 1
Title
In situ inspection and damage survey of the Church of Nossa Senhora da Oliveira in Guimarães.
Rules
The assignment must be carried out in groups of four/five students (different from SA7 groups). Each
group shall carry out the in-situ inspection of the Church and elaborate a preliminary report about its
conservation status. The report must follow the template provided at the end of this document.
The assignment must be submitted on October 11th, 2019.
Objectives
Students have to perform the visual inspection of the Oliveira Church, located in the historical centre
of Guimarães. The Church presents various damages and deterioration processes. The owner is
concerned with the conservation status of the building and wants a preliminary inspection & diagnosis
report with recommendations on maintenance and preventive conservation actions to undertake in
the short term, prior to further diagnostic investigations and safety analysis procedures.
Google Address:
https://www.google.com/maps/place/Igreja+de+Nossa+Senhora+da+Oliveira/@41.4434084,-
8.293347,383m/data=!3m1!1e3!4m5!3m4!1s0xd24efe9f4decec9:0x725631a382bad66e!8m2!3d41.
4429454!4d-8.2926069
SA4 – INSPECTION AND DIAGNOSIS
The inspection is expected to be finished in 3 hours of site works. For inspection, students are
advised to have a digital camera, measure tapes, cracks scales, drawings of the building and a
Checklist of items to inspect.
Tasks
T1
Prior to the inspection task, students will search for information in order to get a general overview of
the case study and properly prepare their subsequent site work by defining:
• An inspection plan;
• The checklist of items to inspect;
• Inspection tools to use.
T2
T3
During and after the inspection the students have to carry out the following subtasks:
• Damage mapping:
o Damage representation should be carried out according to the HeritageCare damage
code.
• Damage interpretation.
T4
Finally, the students have to produce a preliminary inspection & diagnosis report with the following
table of contents:
• Executive summary
• Introduction (with general information about the inspected building)
• Historical Survey
• Inspection procedures (methods and tools);
• All collected information;
• Damage description, mapping and interpretation;
• A list of recommendations/repairs and proposals for further investigations and inspections.
Available Elements
AutoCAD drawings of the building, damage representation code, crack scales and measure tapes.