Estimation and Specification - Question Papers
Estimation and Specification - Question Papers
PART A
PART B
1. Describe in detail about the types of specification and the necessity of specification in building construction
2. Elaborate in detail the principles of specification writing and sources of information for specification
3. Give a detailed specification for plain cement concrete and marble flooring
4. Chart out a detailed specification for damp proof course and cement plastering for brick wall.
5. Elaborate in detail the types of estimate of buildings and requirement for preparing estimation
6. Describe the principles of measurement and billing contingencies. State the measurement of brickwork.
7. Explain in detail the method of deriving detailed quantity of estimate for woodwork and iron works
8. Describe in general guidelines for preparing detailed estimate by using long wall and short wall method -Assume
9. Elaborate about the significance of cost adjustment and cost analysis in budgeting
10. Describe about the role of various financial agencies for building and land development
11. Explain plinth area estimate and cube rate estimate in detail
12. Explain abstract of estimated cost and revised estimate in detail
13. Discuss the purposes of cost control in detail
14. Explain two important stages at which cost control can be exercised
15. Describe the sinking fund method and the straight line method of calculating depreciation
16. Explain the quantity survey method and constant percentage method of calculating depreciation
17. Discuss the relevant points to be considered while working out the financial control of a project
18. Explain 4 methods of valuation of the present day cost of a building
19. Explain the development method of valuation and the depreciation
20. Explain the types of estimation
21. Explain the measurement of structural and service item of work
22. Detail out the construction planning technique for efficient cost control
23. Write in detail about the cost budgeting of a project
24. Explain in detail about the project finance
25. Write short notes on a) Taxation b) Depreciation c) Valuation
26. Detail out the parties involved in project financing
27. Explain in detail about the project feasibility report
28. Write in detail the economics of building plant and material handling
29. Explain the contents of the report accompanying a detailed estimate and state its importance
30. What is detailed estimation? Explain in detail the stages involved in preparation of the detailed estimate.
31. Explain the common methods used for the collection of data of cost control
32. Explain the methods by which present day cost can be assessed for the various items of work
33. Explain the outgoings which are to be considered during the valuation of a building