Immediate Measures (Within 1 Working Day) Information Sheet 8D-Reporting" Immediate Measures (Within 1 Working Day) Information Sheet 8D-Reporting"
Immediate Measures (Within 1 Working Day) Information Sheet 8D-Reporting" Immediate Measures (Within 1 Working Day) Information Sheet 8D-Reporting"
▪ Determine a champion ▪ In order to solve a problem, it has to be ▪ Protect internal/ external customer from
defined precisely. failure consequences until permanent
▪ Select team members: containment actions are implemented
▪ Product specialist ▪ Following aspects have to be considered: effectively.
▪ Process specialist ▪ Exact failure description according
▪ Quality Manager to customer complaint ▪ Evaluate potential risks
▪ Other problem solving specialists ▪ Place of defect discovery
▪ Production ▪ Protect running production
▪ Specify customer contact ▪ 0 km
▪ Field Do not forget:
▪ Complaint number ▪ Quantity of rejected parts ▪ Identify sorted good parts
▪ Verify effectiveness of implemented
▪ Part number/ name ▪ Check: „affected stocks“ measures
fo noitatne
▪ Supplier(s) ▪ Evaluate possible negative side effects
▪ Customer(s)
▪ On the route of transportation Containment actions only fight the symp-
em. toms, however they do not solve the problem. .m
snoitcA tnem
▪ Declare quantity of ppm-relevant parts
(e.g. after sorting) Send completed „3D-Report“ on time as
required by customer’s notification
▪ Recurrent failure (Yes/ No)
→If yes, start internal escalation
ete- ▪ Application of standard ▪ Develop best permanent ▪ Implementation of the ▪ Use the knowledge ▪ Review the complete- ▪ App
8D
d quality tools to deter- corrective actions to planned actions [D5] of D3-D6 to prevent ness of the defined qua
8D mine possible root eliminate the root causes reoccurrence. actions and close 8D min
signa- causes (e.g. 5M, identified in D4 ▪ Important information: with the date and signa- cau
on 5Why, FTA Fault Tree ▪ Determine degree of ▪ Update product and pro- ture of the champion 5W
Analysis, FMEA). ▪ Complete each measure completion (%) for cess relevant documents: Ana
tnemssessA
a date methodically by the → If status is open, a date me
e of supplier – particularly have to eliminate root cau- Consider: ▪ Define responsible for the next update of sup
to if no troubles were ses and may not provoke ▪ Sustainable effectiveness person and due date the 8D-Report has to if n
found (NTF). other negative effects. of implemented actions for implementation be set. fou
has to be verified (e.g.
te ▪ State the ratio (%) of Consider: by statistical analysis). ▪ Check the assignability ▪ If applicable, update ▪ Sta
m- each determined root Choose corrective action(s) of gained know-how the number of ppm- eac
. cause relation to the (e.g. Poka Yoke) that reliably ▪ If effectiveness is not con- on similar products, relevant parts (e.g. cau
claimed failure [D2] avoid reoccurrence of the firmed, the implemented processes, and customers by sorting) in D3 clai
determined root cause(s)[D4] containment actions [Lessons Learned]
[D3] have to be kept up
until the determined root
causes [D4] are identified