Week 9 Solutions: Clods in Abundance Decreases Permeability
This document contains 10 multiple choice questions about landfill design and management. The questions cover topics like decreasing permeability, connecting geo-membranes during landfill preparation, the purpose of the HELP model, rationales for landfill design, appropriate landfill sites, leachate management options without an ETP, factors to consider during landfill siting, components of a landfill design plan, the purpose of leachate circulation in bioreactor landfills, and expenses included in a landfill design budget.
Week 9 Solutions: Clods in Abundance Decreases Permeability
This document contains 10 multiple choice questions about landfill design and management. The questions cover topics like decreasing permeability, connecting geo-membranes during landfill preparation, the purpose of the HELP model, rationales for landfill design, appropriate landfill sites, leachate management options without an ETP, factors to consider during landfill siting, components of a landfill design plan, the purpose of leachate circulation in bioreactor landfills, and expenses included in a landfill design budget.
1. Which of the following is wrong about decreasing the Permeability?
Increasing clay content decreases permeability Compaction decreases permeability Clods in abundance decreases permeability All of the above 2. While preparing landfill, the process by which two geo-membranes are connected is called as Stitching Gluing Welding None 3. What does Hydrologic Evaluation of Landfill Performance (HELP) model estimates? Estimates gas formation in landfill Estimates Water balance in landfill Estimates life of landfill Estimates amount of waste landfill can handle 4. Which of the following is a rational behind designing landfill? Containing waste for a control release of emissions Containing waste for a elimination of emissions Containing waste for blockage of emissions none 5. If you are a design engineer for construction of landfill in your state, which of the following site you will choose for landfill construction Wetland far from the city Unused but unstable terrain Waste land along the immediate river side Stable land with shallow ground water table 6. In the absence of ETP at a landfill site which of the following method should be opt out Mass evaporation Disposed off to nearby by lake for dilution Aeration in lined lagoon Hauled over to ETP using pipeline 7. ‘Potential ultimate uses for the completed site’ is not a factor to be considered in siting a new potential landfill site for the long term disposal of solid waste True False 8. Post closure plan is not included in a plan for a landfill design True False 9. Rational behind leachate circulation in the bioreactor landfill is to speed up the biodegradation of waste True False 10. The budget allocated to landfill design doesn’t include closer and post closure expenses True False