Format 9 - Control Plan
Format 9 - Control Plan
Prototype / Pre-Launch/ Production Key contact / Phone Date (Orig.) Date (Rev.)
CONTROL PLAN NUMBER
Part Number / Latest Change Level Core team Customer Engineering
Approval / Date (if Req'd)
Part Name / Description Supplier / Plant Approval / Date Customer
Quality Approval / Date (if Req'd)
Supplier / Plant Supplier code Other Approval / Date (if Req'd) Other Approval / Date (if Req'd)
CHARACTERISTICS Methods
Sample
Process
Part / Machine, Product / Evaluation / Reaction Plan
Name / Special Control
Process Device, No Product Process Proc Spec / Measurement Size Freq
Operation Char. Method
Number Jig for Mfg Tolerance Technique
Description