Assignment 1 - Traffic Signal Design - 03042020

This document provides instructions for a traffic signal design assignment due on April 4th, 2020. It includes two problems to solve: 1) Determine the estimated effective green time of the fourth phase of a pretimed four-phase signal with given critical lane group flow rates and a cycle length of 60 + the last digit of the student's ID seconds. 2) Referring to a 4-legged intersection diagram with peak hour traffic volumes: a) determine right-turn phasing b) determine critical lane group and flow ratio c) calculate optimal and minimum cycle length d) allocate green, yellow and all-red times e) determine minimum pedestrian green time assuming a maximum of the last 3 digits of the student's ID

Uploaded by

SNK
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views

Assignment 1 - Traffic Signal Design - 03042020

This document provides instructions for a traffic signal design assignment due on April 4th, 2020. It includes two problems to solve: 1) Determine the estimated effective green time of the fourth phase of a pretimed four-phase signal with given critical lane group flow rates and a cycle length of 60 + the last digit of the student's ID seconds. 2) Referring to a 4-legged intersection diagram with peak hour traffic volumes: a) determine right-turn phasing b) determine critical lane group and flow ratio c) calculate optimal and minimum cycle length d) allocate green, yellow and all-red times e) determine minimum pedestrian green time assuming a maximum of the last 3 digits of the student's ID

Uploaded by

SNK
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Traffic Signal Design

Assignment 1
(Due Date: 04 April, 2020, Time: 12.00 pm)
1) A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200
+ (last 3-digits of your ID), 187, and 210 + (last 3-digits of your ID) veh/h (saturation flow
rates are 1800 veh/h/ln for all phases). The lost time is known to be (last digit of your ID)
seconds for each phase. If the cycle length is 60 + (last digit of your ID) seconds, determine
the estimated effective green time of the fourth phase.

2) Refer to the following level-grade 4-legged intersection (Figure 2) with peak hour volume for
right-rurn, left-turn and through movement (Figure 1). Assume, drivers are driving at right-
hand side in context of Bangladesh. Determine the following:
a) Determine the right-turn phasing. Split the right-turn movement based on Highway
Capacity Manual.
b) Determine the flow ratio and critical lane group.
c) Calculate optimal and minimum cycle length.
d) Allocate effective green-time, yellow time and all-red time.
e) Determine the minimum amount of pedestrian green time required for the intersection
of Vine and Maple Streets. Assume a maximum of (last 3-digit of your ID)
pedestrians crossing either street during any one phase and a crosswalk width of 12 ft

Figure 1: Peak-hour Traffic Volume


Figure 2: 4-legged Intersection