This document provides an abstract of cost for the improvement of the Dwari-Sarudada-Hupseghat Road project in Madhyabindu Municipality, Nepal. It details the various civil works items required, including excavation, stone soling, concrete work, stone masonry, geo-textiles, and weep holes. The total estimated cost is NPR 6,025,789.67 with the project office contributing NPR 4,800,000 and the user contributing NPR 1,225,789.67 which is 20.34% of the total cost. A detailed estimate breaks down the quantities of materials required at different sections of the road.

Uploaded by

Er Saroj Paudel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views

Abstract of Cost

This document provides an abstract of cost for the improvement of the Dwari-Sarudada-Hupseghat Road project in Madhyabindu Municipality, Nepal. It details the various civil works items required, including excavation, stone soling, concrete work, stone masonry, geo-textiles, and weep holes. The total estimated cost is NPR 6,025,789.67 with the project office contributing NPR 4,800,000 and the user contributing NPR 1,225,789.67 which is 20.34% of the total cost. A detailed estimate breaks down the quantities of materials required at different sections of the road.

Uploaded by

Er Saroj Paudel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Government of Nepal

Ministry of Urban Development


Department of Urban Development and Building Construction
Project Office of Urban Development and Building Construction
Chitwan

Abstract of Cost
F/Y: 2076/077
Project Name: Improvement of Dwari-Sarudada-Hupseghat Road
Project Location: Madhyabindu Municipality, Ward no 14, Nawalpur
Budget Sub Head No:
S.No. Description of Item of Works Unit Quantiy Rate Amount Remarks
A. Civil Works
Road way excavation in all types of soil (Soft/Hard/BMS)
including removal of stumps and other deleterious
matter and disposal upto relevant lift and lead all
complete as per drawing and technical specification.
1 Cu.m 22335.00 39.34 878658.9
[Mechanical Mean] {Norms No.9.1 I B , Spec. Clause No.
905}

Road way excavation in Soft/ hard rock using rock


breaker including breaking rock and disposal upto
2 relevant lift and lead all complete as per drawing and Cu.m 3087.00 401.42 1239183.54 weightage(75%Soft
Rock + 25% Hard Rock)
technical specification. [Mechanical Mean lead upto 30
m] {Norms No.9.1 IV A & 9.1 II B, Spec. Clause No. 905 }

Providing and Laying of Dry Stone Soling for foundation


works of drain all complete works as mentioned in
3 specification and directed by the Engineer [Spec clause Cu.m 18.00 4071.02 73278.36
No 1006, Norms 10.8]

Providing and laying of plain cement concrete M10 (or


1:3:6 for nominal mix) in Foundation complete as per
4 Cu.m 12.00 6948.70 83384.4
Drawing and Technical Specifications. (Norms No. 20.1,
Spec Clasue No.2000 }

Providing, assmebling and laying mechanically woven


heavily zinc coated, double twisted 100 mm X 120 mm
hexagonal mesh type gabion structure (mesh wire 3 mm,
selvage wire 3.9 mm, lacing wire 2.4 mm) for retaining
earth including stretching; forming compartments; tying 50% of Excavated Rock
5 the sides and diaphragms with binding wire in each Cu.m 385.88 2362.93 911795.61 is used in Filling Gabion
mesh; tying with bracing wires and tie wires; filling Crates
stone/boulder obtained from rock excavation in gabion
boxes/mattress including dressing, bedding, bonding and
tying down the lid all complete as per specifications.
{Norms No. 24.2.A, Spec Clasue No. 2402}

Providing, assmebling and laying mechanically woven


heavily zinc coated, double twisted 100 mm X 120 mm
hexagonal mesh type gabion structure (mesh wire 3 mm,
selvage wire 3.9 mm, lacing wire 2.4 mm) for retaining
earth including stretching; forming compartments; tying
6 the sides and diaphragms with binding wire in each Cu.m 253.13 4716.04 1193747.62
mesh; tying with bracing wires and tie wires; filling
stone/boulder in gabion boxes/mattress including
dressing, bedding, bonding and tying down the lid all
complete as per specifications. {Norms No. 24.2.A, Spec
Clasue No. 2402}
S.No. Description of Item of Works Unit Quantiy Rate Amount Remarks

Providing and laying Stone Masonry work in cement


mortar 1:4 in structure all complete as per drawing and
7 Technical Specifications. Cu.m 180.00 8332.92 1499925.6
[Random Rubble Masonry / in Structure / CS 1:4 Mortar]
{Norms No. 26.5 A, Spec Clause No.2607 }

Providing and laying and fixing of Geo-membrane all


8 complete as per specifications. {Norms No. 24.6, Spec. Sq.m 290.06 120.15 34850.7
Clause No. 2403, 2404}

Providing, and applying Pointing with cement mortar on


stone masonry work in structure as per Technical
9 Specifications. Sq.m 240.00 181.39 43533.6
[Pointing on Stone masonry (RRM) / CS 1:3 Mortar]
{Norms No.26.7 A , Spec Clause No. 2600}

Providing and laying weep holes in Retaining Wall with


110 mm dia HDPE pipe, extending through the full width
10 of the structure with slope of 1V :20H towards drawing R-m 68.76 716.92 49295.41
face Complete as per Drawing and Technical
Specifications. { Norms No. 20.7, Spec Clasue No. 3109}

B. Provisional Sum
Providing and installation of project signboards with size
i of 1.8 x 1.2 m as per specification and instruction of Ls 1 3135.93 3135.93
engineer.
ii Lab-Test Provision Ls 1 15000 15000
Sub-Total 6025789.67
Contengency (4%) 200000
PUDBC'S Contribution 4800000
User's Contribution 1225789.67 20.34%
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Project Office of Urban Developmengt and Building Construction
Chitwan

Detail Estimate

Project Name: Improvement of Dwari-Sarudada-Hupseghat Road


Project Location: Madhyabindu Municipality, Ward no 14, Nawalpur

Earth Work in Excavayion Retaining Wall

Soft PCC Area 110mm HDPE


S.No. Chainage Length Structure Total Soft Soft/Hard Soling PCC Masonary Remarks
Area from Avg Area Soft/Hard/ /Hard Soling (m2) Masonary Geo-Textile Pipe for Weep
CAD (m2) (m2) Cutting Cutting BMS Soil /BMS/ /Hard Rock Area (m2) Quantity (Base + Quantity Area (m2) Quantity Gabion (m2) Pointing (m2) Hole @1.5mc/c
(m2) Quantity Rock Quantity (m3) (m3) (m3)
Quantity Caping) (R-m)

1 0+000 0+020 20.00 6.1 3.05 61 100% 61.00 0% 0.00


2 0+020 0+040 20.00 6.1 6.1 122 100% 122.00 0% 0.00
3 0+040 0+060 20.00 8.1 7.1 142 100% 142.00 0% 0.00
4 0+060 0+080 20.00 11.3 9.7 0.5 204 100% 204.00 0% 0.00 0.15 3 0.1 2 1.5 30 1.01 40 11.46
5 0+080 0+100 20.00 2.6 6.95 0.5 149 100% 149.00 0% 0.00 0.15 3 0.1 2 1.5 30 1.01 40 11.46
6 0+100 0+120 20.00 13.9 8.25 165 100% 165.00 0% 0.00
7 0+120 0+140 20.00 5.3 9.6 192 100% 192.00 0% 0.00
8 0+140 0+160 20.00 4.1 4.7 94 100% 94.00 0% 0.00
9 0+160 0+180 20.00 13.6 8.85 177 100% 177.00 0% 0.00
10 0+180 0+200 20.00 15.5 14.55 0.5 301 100% 301.00 0% 0.00 0.15 3 0.1 2 1.5 30 1.01 40 11.46
11 0+200 0+220 20.00 15.5 15.5 0.5 320 100% 320.00 0% 0.00 0.15 3 0.1 2 1.5 30 1.01 40 11.46
12 0+220 0+240 20.00 13.4 14.45 0.5 299 100% 299.00 0% 0.00 0.15 3 0.1 2 1.5 30 1.01 40 11.46
13 0+240 0+260 20.00 5.9 9.65 193 100% 193.00 0% 0.00
14 0+260 0+280 20.00 8 6.95 139 100% 139.00 0% 0.00
15 0+280 0+300 20.00 12.3 10.15 203 100% 203.00 0% 0.00
16 0+300 0+320 20.00 6.4 9.35 0.5 197 100% 197.00 0% 0.00 0.15 3 0.1 2 1.5 30 1.01 40 11.46
17 0+320 0+340 20.00 8.3 7.35 147 100% 147.00 0% 0.00
18 0+340 0+360 20.00 14.1 11.2 0.5 234 100% 234.00 0% 0.00
19 0+360 0+380 20.00 15.1 14.6 292 100% 292.00 0% 0.00
20 0+380 0+400 20.00 7.7 11.4 228 100% 228.00 0% 0.00
21 0+400 0+420 20.00 10.3 9 180 100% 180.00 0% 0.00
22 0+420 0+440 20.00 11.4 10.85 217 100% 217.00 0% 0.00
23 0+440 0+460 20.00 11.4 11.4 228 100% 228.00 0% 0.00
24 0+460 0+480 20.00 9.7 10.55 211 100% 211.00 0% 0.00
25 0+480 0+500 20.00 9.1 9.4 188 100% 188.00 0% 0.00
26 0+500 0+520 20.00 7.7 8.4 168 100% 168.00 0% 0.00
27 0+520 0+540 20.00 8.8 8.25 165 100% 165.00 0% 0.00
28 0+540 0+560 20.00 13.2 11 220 100% 220.00 0% 0.00
29 0+560 0+580 20.00 5.3 9.25 185 100% 185.00 0% 0.00
30 0+580 0+600 20.00 13.6 9.45 189 100% 189.00 0% 0.00
31 0+600 0+620 20.00 8.5 11.05 221 100% 221.00 0% 0.00
32 0+620 0+640 20.00 8.3 8.4 168 100% 168.00 0% 0.00
33 0+640 0+660 20.00 2.7 5.5 110 100% 110.00 0% 0.00
34 0+660 0+680 20.00 14.3 8.5 170 100% 170.00 0% 0.00
35 0+680 0+700 20.00 9 11.65 233 100% 233.00 0% 0.00
36 0+700 0+720 20.00 12.7 10.85 217 0% 0.00 100% 217.00
37 0+720 0+740 20.00 10.5 11.6 232 100% 232.00 0% 0.00
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Project Office of Urban Developmengt and Building Construction
Chitwan

Detail Estimate

Project Name: Improvement of Dwari-Sarudada-Hupseghat Road


Project Location: Madhyabindu Municipality, Ward no 14, Nawalpur

Earth Work in Excavayion Retaining Wall

Soft PCC Area 110mm HDPE


S.No. Chainage Length Structure Total Soft Soft/Hard Soling PCC Masonary Remarks
Area from Avg Area Soft/Hard/ /Hard Soling (m2) Masonary Geo-Textile Pipe for Weep
CAD (m2) (m2) Cutting Cutting BMS Soil /BMS/ /Hard Rock Area (m2) Quantity (Base + Quantity Area (m2) Quantity Gabion (m2) Pointing (m2) Hole @1.5mc/c
(m2) Quantity Rock Quantity (m3) (m3) (m3)
Quantity Caping) (R-m)

38 0+740 0+760 20.00 10.2 10.35 207 100% 207.00 0% 0.00


39 0+760 0+780 20.00 11.6 10.9 218 100% 218.00 0% 0.00
40 0+780 0+800 20.00 7.7 9.65 193 100% 193.00 0% 0.00
41 0+800 0+820 20.00 9.3 8.5 170 100% 170.00 0% 0.00
42 0+820 0+840 20.00 5.6 7.45 149 100% 149.00 0% 0.00
43 0+840 0+860 20.00 14.9 10.25 205 100% 205.00 0% 0.00
44 0+860 0+880 20.00 12.8 13.85 277 100% 277.00 0% 0.00
45 0+880 0+900 20.00 12.2 12.5 250 100% 250.00 0% 0.00
46 0+900 0+920 20.00 7.7 9.95 199 100% 199.00 0% 0.00
47 0+920 0+940 20.00 5 6.35 127 100% 127.00 0% 0.00
48 0+940 0+960 20.00 4.6 4.8 96 100% 96.00 0% 0.00
49 0+960 0+980 20.00 5.9 5.25 105 100% 105.00 0% 0.00
50 0+980 1+000 20.00 7.6 6.75 135 100% 135.00 0% 0.00
51 1+000 1+020 20.00 8.5 8.05 161 100% 161.00 0% 0.00
52 1+020 1+040 20.00 7.1 7.8 156 100% 156.00 0% 0.00
53 1+040 1+060 20.00 18.1 12.6 252 100% 252.00 0% 0.00
54 1+060 1+080 20.00 17.9 18 360 100% 360.00 0% 0.00
55 1+080 1+100 20.00 13.9 15.9 318 100% 318.00 0% 0.00
56 1+100 1+120 20.00 15.7 14.8 296 100% 296.00 0% 0.00
57 1+120 1+140 20.00 10.6 13.15 263 100% 263.00 0% 0.00
58 1+140 1+160 20.00 17 13.8 276 100% 276.00 0% 0.00
59 1+160 1+180 20.00 20.7 18.85 377 100% 377.00 0% 0.00
60 1+180 1+200 20.00 18.1 19.4 388 100% 388.00 0% 0.00
61 1+200 1+220 20.00 19.8 18.95 379 100% 379.00 0% 0.00
62 1+220 1+240 20.00 10.9 15.35 307 100% 307.00 0% 0.00
63 1+240 1+260 20.00 10.9 10.9 218 100% 218.00 0% 0.00
64 1+260 1+280 20.00 7.7 9.3 186 100% 186.00 0% 0.00
65 1+280 1+300 20.00 8.5 8.1 162 100% 162.00 0% 0.00
66 1+300 1+320 20.00 10 9.25 185 100% 185.00 0% 0.00
67 1+320 1+340 20.00 15.6 12.8 256 100% 256.00 0% 0.00
68 1+340 1+360 20.00 11.6 13.6 272 0% 0.00 100% 272.00
69 1+360 1+380 20.00 15.5 13.55 271 100% 271.00 0% 0.00
70 1+380 1+400 20.00 12.8 14.15 283 100% 283.00 0% 0.00

71 1+400 1+420 20.00 11.9 12.35 247 0% 0.00 100% 247.00 180 80 w=(3+2.5+2+1.5)/4,
H=4m
72 1+420 1+440 20.00 11.4 11.65 233 0% 0.00 100% 233.00 99 44 13 m length
73 1+440 1+460 20.00 25.8 18.6 372 100% 372.00 0% 0.00
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Project Office of Urban Developmengt and Building Construction
Chitwan

Detail Estimate

Project Name: Improvement of Dwari-Sarudada-Hupseghat Road


Project Location: Madhyabindu Municipality, Ward no 14, Nawalpur

Earth Work in Excavayion Retaining Wall

Soft PCC Area 110mm HDPE


S.No. Chainage Length Structure Total Soft Soft/Hard Soling PCC Masonary Remarks
Area from Avg Area Soft/Hard/ /Hard Soling (m2) Masonary Geo-Textile Pipe for Weep
CAD (m2) (m2) Cutting Cutting BMS Soil /BMS/ /Hard Rock Area (m2) Quantity (Base + Quantity Area (m2) Quantity Gabion (m2) Pointing (m2) Hole @1.5mc/c
(m2) Quantity Rock Quantity (m3) (m3) (m3)
Quantity Caping) (R-m)

74 1+460 1+480 20.00 17.7 21.75 435 100% 435.00 0% 0.00


75 1+480 1+500 20.00 17 17.35 347 100% 347.00 0% 0.00
76 1+500 1+520 20.00 20.7 18.85 377 100% 377.00 0% 0.00
77 1+520 1+540 20.00 17 18.85 377 100% 377.00 0% 0.00
78 1+540 1+560 20.00 10.4 13.7 274 100% 274.00 0% 0.00
79 1+560 1+580 20.00 15.6 13 260 100% 260.00 0% 0.00
80 1+580 1+600 20.00 13.2 14.4 288 0% 0.00 100% 288.00
81 1+600 1+620 20.00 31.7 22.45 449 0% 0.00 100% 449.00
82 1+620 1+640 20.00 5.7 18.7 374 100% 374.00 0% 0.00
83 1+640 1+660 20.00 14.2 9.95 199 0% 0.00 100% 199.00
84 1+660 1+680 20.00 4 9.1 182 100% 182.00 0% 0.00
85 1+680 1+700 20.00 6.4 5.2 104 100% 104.00 0% 0.00
86 1+700 1+720 20.00 4.4 5.4 108 100% 108.00 0% 0.00
87 1+720 1+740 20.00 8.3 6.35 127 100% 127.00 0% 0.00
88 1+740 1+760 20.00 8.6 8.45 169 100% 169.00 0% 0.00
89 1+760 1+780 20.00 7.6 8.1 162 100% 162.00 0% 0.00
90 1+780 1+800 20.00 8.5 8.05 161 100% 161.00 0% 0.00
91 1+800 1+820 20.00 20.7 14.6 292 100% 292.00 0% 0.00
92 1+820 1+840 20.00 24.5 22.6 452 0% 0.00 100% 452.00
93 1+840 1+860 20.00 19.1 21.8 436 0% 0.00 100% 436.00
94 1+860 1+880 20.00 10.3 14.7 294 0% 0.00 100% 294.00
95 1+880 1+900 20.00 15.9 13.1 262 100% 262.00 0% 0.00
96 1+900 1+920 20.00 12.8 14.35 287 100% 287.00 0% 0.00
97 1+920 1+940 20.00 27.1 19.95 399 100% 399.00 0% 0.00
98 1+940 1+960 20.00 12.7 19.9 398 100% 398.00 0% 0.00
99 1+960 1+980 20.00 8.5 10.6 212 100% 212.00 0% 0.00
100 1+980 2+000 20.00 10 9.25 185 100% 185.00 0% 0.00
101 2+000 2+020 20.00 15.1 12.55 251 100% 251.00 0% 0.00
102 2+020 2+040 20.00 5.8 10.45 209 100% 209.00 0% 0.00
103 2+040 2+060 20.00 8.6 7.2 144 100% 144.00 0% 0.00
104 2+060 2+080 20.00 5.8 7.2 144 100% 144.00 0% 0.00
105 2+080 2+100 20.00 5.5 5.65 113 100% 113.00 0% 0.00
106 2+100 2+120 20.00 5 5.25 105 100% 105.00 0% 0.00

107 2+120 2+140 20.00 12.8 8.9 178 100% 178.00 0% 0.00 2.5 5 180 80 w=(3+2.5+2+1.5)/4,
H=4m
108 2+140 2+160 20.00 11.9 12.35 247 100% 247.00 0% 0.00 2.5 5 180 80
109 2+160 2+180 20.00 9.9 10.9 218 100% 218.00 0% 0.00
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Project Office of Urban Developmengt and Building Construction
Chitwan

Detail Estimate

Project Name: Improvement of Dwari-Sarudada-Hupseghat Road


Project Location: Madhyabindu Municipality, Ward no 14, Nawalpur

Earth Work in Excavayion Retaining Wall

Soft PCC Area 110mm HDPE


S.No. Chainage Length Structure Total Soft Soft/Hard Soling PCC Masonary Remarks
Area from Avg Area Soft/Hard/ /Hard Soling (m2) Masonary Geo-Textile Pipe for Weep
CAD (m2) (m2) Cutting Cutting BMS Soil /BMS/ /Hard Rock Area (m2) Quantity (Base + Quantity Area (m2) Quantity Gabion (m2) Pointing (m2) Hole @1.5mc/c
(m2) Quantity Rock Quantity (m3) (m3) (m3)
Quantity Caping) (R-m)

110 2+180 2+200 20.00 14.4 12.15 243 100% 243.00 0% 0.00
111 2+200 2+220 20.00 10.6 12.5 250 100% 250.00 0% 0.00
Total 2220.00 25422.00 22335.00 3087.00 18.00 12.00 180.00 639.00 290.06 240.00 68.76