Terms of Reference For Surveys at Dhamlej

The document outlines the terms of reference for surveys to be conducted at Dhamlej in Gujarat, India to prepare a detailed project report for a proposed captive port facility by Binani Cement Limited. [1] A bathymetry survey, tide and current measurements, wave and wind data collection are to be conducted. [2] A geotechnical survey including 3 boreholes each for the jetty and storage yard areas and associated laboratory tests on collected samples is also required. [3] The surveys are to be completed within 3 weeks and reports submitted, including field test results, data interpretation and recommendations. [4] The consultant is asked to provide an all-inclusive fee quote excluding applicable taxes.

Uploaded by

amit5084
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Terms of Reference For Surveys at Dhamlej

The document outlines the terms of reference for surveys to be conducted at Dhamlej in Gujarat, India to prepare a detailed project report for a proposed captive port facility by Binani Cement Limited. [1] A bathymetry survey, tide and current measurements, wave and wind data collection are to be conducted. [2] A geotechnical survey including 3 boreholes each for the jetty and storage yard areas and associated laboratory tests on collected samples is also required. [3] The surveys are to be completed within 3 weeks and reports submitted, including field test results, data interpretation and recommendations. [4] The consultant is asked to provide an all-inclusive fee quote excluding applicable taxes.

Uploaded by

amit5084
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

May 2010

Binani Cement Ltd,


3rd Floor, Dubash House No.15
J N Heredia Marg
Terms of Ballard Estate
Mumbai 400 001
Reference for Tel.: +91-22-2264 0040-41/42
Surveys at Fax: +91-22-2264 0045
www.binaniindustries.com
Dhamlej

Page 1
Contents
1 INTRODUCTION..........................................................................................................................................3

2 OBJECTIVE OF THE STUDY....................................................................................................................3

3 TERMS OF REFERENCE...........................................................................................................................3

4 TIME SCHEDULE & DELIVERABLES...................................................................................................3

5 FEES................................................................................................................................................................3

Page 2
1 INTRODUCTION

Binani Cement Limited (BCL) a subsidiary of Binani Industries Limited (BIL), a prominent business
house in India is planning to develop the captive port facility at Dhamlej close to Veraval in Gujarat.

The company is planning to develop the captive port facility near Dhamlej close to Veraval in Gujarat.
The site is approximately 6 kms up the shore line from Dhamlej village. The port is envisaged to be
developed in two phases:

Phase-1: Captive port to cater to the proposed power plant which is around 6 kms ( though based on
interaction with BCL’s officials the location has not been frozen)from the waterfront (~ 1.0 MTPA of
thermal coal imports – from Indonesia)

Phase-2: Captive port to cater to the cement plant (~2.5 MTPA of clinker exports)

It is now decided to appoint a Consultant to carry out various surveys in order to prepare Detailed
Project Report (DPR) for Captive Jetty at Dhamlej.

Dhamlej

Source: google image

Page 3
2 OBJECTIVE OF THE STUDY

The objective of the study is to give the information on various physical parameters such as wave,
current, tide, depth, wind, soil etc. which will form the basis for Detailed Project Report (DPR).

3 TERMS OF REFERENCE

The broad terms of reference for the consultancy assignment will include (but not limited to) at least
the following:

A) Bathymetry survey
Objective- To prepare a contour map in a scale of 1:2000 at a gap of 1 m in the area (2kmx1km)
while taking soundings at every 20m interval.

Deliverables

The following deliverables should be there-

1. XYZ-file for uploading on Dredge-pack being used on board dredgers.

2. Soft copy of chart.

3. Hard copy of chart (1:2000 Scale).

4. CD of all Raw data files + processed files along with above files.

B) Tide, Current, Wave and Wind

Deliverable

1. Tidal data for a period of 15 days need to be submitted as a chart


2. Wave data including dominant wave height, period and directions
3. Current data need to be submitted in the form of current direction and speed for one point
4. Wind data need to be collected

C) Geo-technical Survey

Objective
-To prepare Report on soil condition including Test outcomes by doing 3 bore holes in the area for
the jetty (200mx20m) and 3 bore holes in the stack yard (200mx23m).

The purpose, in brief, of the proposed geotechnical investigations is:

i. To determine type of substrata below sea bed and their characteristics up to the specified
depths,

ii. To assess the general suitability of the site for the construction of jetty;

iii. To enable an adequate and economic design to be prepared, including the design of temporary
works;

iv. To plan the best method of construction; to foresee and provide against difficulties and delays
that may arise during construction due

v. To ground and other local conditions;

Page 4
vi. To determine the changes that may arise either naturally or as a result of the proposed works,
and the effect of such changes on adjacent works and on the environment in general;

vii. To advise on the relative suitability of different sites, or different parts of the same site; in case
alternatives are to be studied for any specific purpose that may be indicated in this Specification.

Deliverables

The deliverables have been outlined after the following tests which need to be conducted

TESTS IN A BOREHOLE

Standard Penetration Test (SPT)

Standard penetration test needs to be carried out in a borehole generally at 3.0m intervals and at
every noticeable change of strata and as per the procedure in IS:2131 or equivalent code of
practice.

LABORATORY TESTS
General
All laboratory tests need to be performed by qualified and experienced personnel, familiar with
and having access to equipment and facilities for the accurate determination of data necessary,
for requirements under this specification.

The following laboratory tests need to be conducted from the selected samples recovered from
the test bore-holes:

a. Sieve Analysis

b. Liquid and Plastic Limit

c. Shrinkage Limit

d. Natural Moisture Content

e. Bulk and Dry Density

f. Specific Gravity

g. Unconsolidated Undrained Triaxial Shear Test

h. Direct Shear Test

i. Consolidation Test

j. Crushing Strength of rock samples

k. Triaxial Test

l. U.C.C. Test

Deliverable Reports

Page 5
General

The report shall be in SI units only. Metric units may be used only if needed. A plot plan, showing
locations of all tests properly drawn and dimensioned with reference to the established grid lines,
need to be presented in the report.

Geotechnical Investigation Report

The Report should be in two volumes.

The Volume 1 will present only field tests results.

The Volume 2 shall give interpretations of all tests results and recommendations and shall
complement Volume 1.

Recommendations

The recommendations need to be given based on observations and test results and shall
encompass theoretical as well as practical considerations for foundations for type of structures
envisaged and other relevant systems as in the area under investigation.

4 TIME SCHEDULE & DELIVERABLES

The entire assignment will be completed within 3 weeks from the date of award of work.

5 FEES

The consultant should indicate all inclusive sum amount, excluding the service tax (which shall be
paid by Binani Cement Ltd, as applicable from time to time, in addition to quoted fee).