The document provides information on building condition surveys including the process, methodology, and key aspects to evaluate. It discusses diagnosis of defects through data collection and analysis. It also covers prognosis, predicting outcomes and assessing defect causes. The document outlines defect description, symptoms, possible causes, and remedial work steps to repair issues. It provides examples of structural cracks and repair procedures.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views

DIAGNOSIS

The document provides information on building condition surveys including the process, methodology, and key aspects to evaluate. It discusses diagnosis of defects through data collection and analysis. It also covers prognosis, predicting outcomes and assessing defect causes. The document outlines defect description, symptoms, possible causes, and remedial work steps to repair issues. It provides examples of structural cracks and repair procedures.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

DIAGNOSIS EXAMPLE:

 PROCESS OF COLLECTION DATA


 NDT EQUIPMENT
 ANALYSIS AND RECORD DATA AFTER SURVEY

PROGNOSIS

 PREDICTION
 A TECHNICAL ASSESSMENT OF PROABLE CAURSE AND
OUTCOME OF BUILDING DEFECT
DEFECT DESCRIPTION:
SYMPTOM  CRACK AT CONCRETE COLOMN STUMP WITH SIZE 500 MM × 500MM.

 A SIGN OR INDICATION OF SOMETHING POSSIBLE CAUSES:

POSSIBLE CAUSES  UNBALANCE LOAD DISTRIBUTION / WEAR AND TEAR

 WHAT CAUSE THE DEFECT OCCUR SYMPTOM:

 SMALL HOLE AT THE SURROUNDING OF THE COLUMN STUMP


REMIDIAL WORK  ADA SERPIHAN YG PECAH DI CORNER COLUMN STUMP

 STEP BY STEP TO REPAIR OR PREVENT THE DEFECT FROM PROGNOSIS:


OCCUR
 AFFECT THE WHOLE BUILDING
DEFECT DESCRIPTION  DANGEROUS TO PEOPLE

REMIDIAL WORK
 WHAT IS THE DEFECT?
 SIZE?  IDENTIFY THE AFFECTED AREA
 MATERIAL?  CLEAN THE AFFECTED AREA
 MAKE A SHORING TO THE AFFECTED AREA TO GIVE THE STABILITY TO THE
COLUMN
 HACK THE AFFECTED AREA
 MAKE A FORMWORK AT THE HACKING AREA
 POUR CONCERETE INTO THE FORMWORK
 MAKE SURE THE FORMWORK DRY FOR 3 DAYS
 REMOVE THE FORMWORK
 REMOVE THE SHORING
 CLEAR ALL THE DEBRIS
PREPARATION AND PROCUDURE OF BUILDING CONDITION 5. PREAPARING REPORT AND SUBMISSION TO CLIENT
-DEALING WITH OCCUPIER (REPORT PRESENTATION)
SURVEY

 UNDERSTANDING WORKFLOW
REMEDIAL WORK AND WRITING METHOD STATEMENT
 UNDERSTANDING DEEPLY THE PROCUDURE WHOLE ACTIVITIES CATOGERIES OF INSPECTION WORK
 DETERMINE LEVEL BUILDING CONDITIION (GOOD/BAD)
1. PRELIMENARY INSPECTION
 STANDARD GUIDELINE FOR BUILDING SURVEYOR TO DO
 VISUAL INTERNAL AND EXTERNAL INCLUDING SURRROUNDING
CONDITION SURVEY WORK
AREA
2. GENERAL INSPECTION
AIM/PURPOSE  INTERNAL AND EXTERNAL BUILDING FABRICS, FINISHING AND
o GIVE INDEPENDENT ‘PROPESSIONAL OPINION ‘OF THE FORECAST FUTURE DEFECT
CONDITION OF THE PROPERTIES 3. FURTHER INSPECTION
o PROVIDE CONSIDERABLE AMOUNT OF IMPORTANT DATA  INCLUDE DEFECT DETAIL OF BUILDING STRUCTURE AND FABRIC
ON PERFORMANCE 4. REPAIRING COST
 INSPECTION THAT INCLUDE REMEDIAL COST ESTIMANATION OF
‘PROPESSIONAL OPINION’ REPAIRING COST

a) STRUCTURAL OF BUILDING (FOUNDATION, COLUMN, BEAM, FLOOR, REMEDIAL:


WALL, ROOF) GIVING OR INTENDED AS REMEDY OR CURE
b) COMMENT ENVIRONMENT AD PLANNING PROPERTY
c) REPORT ON FINISHES AND SERVICES SPECIFICATION:
d) OBSERVATION AND RECEMMANDATION ON MAINTENANCE COST
CORRECTION
GENERAL PRINCIPLES
REPAIR:
 OPERATE BASIS OF PROPER SEQUENCES THE ACTION OF FIXIXNG OR MENDING SOMETHING
 INTERRELATE EACH ELEMENT THAT CAUSED AND AFFECT SURVEY
REMEDIAL WORK
1. CONFIRMATION OF CLIENT INSTRUCTION
(CLIENT INSTRUCTION – AGREEMENT WRITING)  INCLUDE MATERIALS SUGGESTED, SIZE, MEASUREMENT OF THE
2. PREMELINARIES AND SURVEY COMPONENTS AND INSTALLATION METHODS INVOLVED
(LIMITATION/DO SURVEY THROUGH GOOGLE FIRST OF THE PROPERTY  STATED IN STEPS TO SHOW CLEARLY PROCESS INVOLVE
BEFORE DOING SURVEY)
FOR THE PROPOSED REMEDIAL WORKS ON YOUR REPORT, THE REMEDIAL WORKS
3. PREPARATION OF EQUIPMENT AND TOOL
SHOULD BE:
(EQUIPMENT – SAFETY / TOOL – ALAT)
4. INSPECTION PROCUDURE 1. PRACTICAL
a) WHOLE PROPERTY
b) MAIN ROOF 2. IMMEDIATE/FAST
c) BOUNDARIES/SURROUNDING
d) DRAINAGE(MAINHOLE) 3. REASONABLE COST
e) FINISHES/EXTERNAL ROOF CONDITION
f) BUILDING CONDITION IN THE PROPERTY(ROOM)
10.ALL DOWNPIPES ARE TO BE THOROUGHLY WATER
TESTED TO ENSURE THERE ARE NOT FAILURES.

METHOD STATEMENT

FOR THE METHOD STATEMENT, ALL STEPS MUST BE IN DETAIL


WHICH IS EVERY STEP ON REMEDIAL WORKS SHOULD BE
EXPLAINED IN DETAILS.

EXAMPLE OF METHOD STATEMENT

REPAIR EXISTING CAST IRON RAINWATER GOODS


1.SCAFFOLDING IT TO BE ERECTED IN ADVANCED BY A
COMPETENT SCAFFOLDING COMPANY IN CONVERSATION WITH
EXTERNAL/SITE CONDITION
THE SITE MANAGER.
2.DEBRIS SHOULD BE CLEARED FROM THE GUTTERS, TAKING  SITE AND GROUND CODITION, EXTERIOR ELEMENTS OF BUILDING, PARKING
CARE NOT TO SCRATCH OR DAMAGE THE PROTECTIVE SURFACE. AREAS, COVERED CAR PARK, LANDSCAPE, COMPOUND LIGHTINGS,
PERIMETER FENCES, GATES, REFUSES DISPOSALS ETC. WITHIN THE
3.ONCE DEBRIS ARE REMOVED, CONTAMINATED AREAS SHOULD BOUNDARY OF THE PREMISES/ASSET.
BE CLEANED WITH FRESH WATER.
4.DOWNPIPES ARE TO BE CHECKED FOR POSSIBLE BLOCKAGES.
IF ANY ARE FOUND PRESSURED WATER SHOULD USED FOR
FABRIC AND COMPONENT
CLEARANCE.
5.FIXINGS SHOULD BE CHECKED AND IF DAMAGED, REPLACED  CONDITION OF THE FABRIC AND COMPONENTS OF THE BUILDING SUCH AS
WITH SIMILAR. THE ROOF TOP; PARAPET. EXTERNAL AND INETERNAL FAÇADE; APRON,
PERIMETER DRAIN, BEAM, COLUMN, FLOOR, STAIRCASE, CEILING, WALL,
6.EXISTING PAINTWORK IS TO BE STRIPPED BACK AND WINDOW, DOOR
CLEANED, BEFORE APPLYING A NEW PAINT TO MATCH EXISTING
USING SOFT-HAIRED BRUSHES.
7.RUST PATCHES SHOULD BE SMOOTHED WITH EMERY CLOTH,
BUILDING SERVICES
OR IF THERE ARE LARGE AREAS, BRUSHED BACK WITH A WIRE
HAND BRUSH.  HOT AND COLD WATER SUPPLY, AIR CONDITIONING AND MECHANICAL
VENTILATION SYSTEMS, SANITATION AND CLEANSING SYSTEM, SEWERAGE
8.AFFECTED AREAS SHOULD BE RE-COATED WITH RUST- SYSTEM, FIRE PROTECTION SYSTEM, VERTICAL AND HORIZONTAL
INHIBITING METAL PRIMER, FOLLOWED BY EITHER BLACK TRANSPOTATION SYSTEM, GAS, SPECIAL SERVICES, PUBLIC ADDRESS
SYSTEM, COMMUNICATION AND NETWORK SYSTEM, SURVEILLANCE
BITUMEN OR GLOSS PAINT.
SYSTEM, ELECTRICAL SERVICES, SAFETY AND SECURTY AND SUSTAINABLE
SYSTEM.