1) Unit 9 of Kothagudem TPS Stage 5 generated 5.9620 MU of electricity on November 2nd 2018 with a plant load factor of 99.37% and availability of 100%. 2) Coal consumption was 4100 MT with a specific coal consumption of 0.6877 kg/kwh. 3) Chemical analysis of condensate, feedwater, boiler drum, saturated steam, and main steam samples showed parameters within acceptable ranges.

Uploaded by

Naveen Chodagiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views

Units Generated: Telangana State Power Generation Corporation LTD

1) Unit 9 of Kothagudem TPS Stage 5 generated 5.9620 MU of electricity on November 2nd 2018 with a plant load factor of 99.37% and availability of 100%. 2) Coal consumption was 4100 MT with a specific coal consumption of 0.6877 kg/kwh. 3) Chemical analysis of condensate, feedwater, boiler drum, saturated steam, and main steam samples showed parameters within acceptable ranges.

Uploaded by

Naveen Chodagiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

TELANGANA STATE POWER GENERATION CORPORATION LTD

KOTHAGUDEM TPS ST-V


DAILY PERFORMANCE REPORT
STAGE-5 UNIT-9 Date: 02.11.2018
Sl No DESCRIPTION VALUE REMARKS

1 Units Generated MU 5.9620


2 BACK-DOWN GEN. DUE TO
Loss of Gen-System MU 0.0380
Constrains
Coal Consumption
3 Sp Coal Consumption Kg./Kwh 0.0000
4 Coal Fed To Bunkers (CHP) MT 4100
5 Sp Coal Consumption( Kg/Kwh 0.6877
Bunkers )
6 Average Load MW 248.4167
7 Plant Load Factor % 99.36667
8 Availability Factor % 100
9 FO Consumption H
10 Sp FO Consumption ml/kwh 0.0000
11 Unit Running Hours H 24.00
12 Maximum Load MW@HH: 248.00@173000
MM:SS
13 Minimum Load MW@HH: 239.00@083000
MM:SS
14 DM Water consumption MT 510.00
15 % DM Water Make up % 2.623
16 GCV of Coal CV 3372
17 Contunious Running days DAY 7
18 H2 Cylinders Consumption NO 2
19 Stock of H2 Cylinders NO 24
20 Stock of Empty H2 Cylinders NO 29
21 H2 Purity - Max % 96.900
22 H2 Purity - Min % 96.700
23 Coal - Opening Balance MT 171461
24 Coal - Receipts MT 10930
25 Coal - Closing Balance MT 167467
26 Net Export through GT MU 5.3588
27 UAT-9A MU 0.1560-
28 UAT-9B MU 0.2500-
29 AUXILLARIES CONSUMPTION
Generator Transformer-9 MU 5.5060-
Generation for Aux. MU 5.9620
Consumption Calc
Station Transformer-5A MU 0.1652
Aux. Consumption to Unit-11 MU 0.0180-
30 Auxulary Cconsumption MU 0.6032
31 % Aux. Consumption % 10.12

Chemical Analysis

PH Conductivity Silica Phosphate Ammonia


Material Max Min Max Min Max Min Max Min Max Min
TELANGANA STATE POWER GENERATION CORPORATION LTD

KOTHAGUDEM TPS ST-V


DAILY PERFORMANCE REPORT
STAGE-5 UNIT-9 Date: 02.11.2018

PH Conductivity Silica Phosphate Ammonia


Material Max Min Max Min Max Min Max Min Max Min
Condensate Sample 8.88 8.85 3.86 3.85 8.3 8.2 0.00 0.00 0.36 0.35
Feed Water Sample 9 8.98 4.01 3.99 8.6 8.5 17 16 0.36 0.35
Boiler Drum Sample 9.60 9.58 21.6 19.8 84 80 3.35 2.80
Saturated Steam Sample 8.98 8.95 3.96 3.95 8.5 8.4
Main Steam Sample 8.92 8.90 3.91 3.90 8.4 8.3 0.36 0.35