Units Generated: Telangana State Power Generation Corporation LTD
1) Unit 9 of Kothagudem TPS Stage 5 generated 5.9620 MU of electricity on November 2nd 2018 with a plant load factor of 99.37% and availability of 100%.
2) Coal consumption was 4100 MT with a specific coal consumption of 0.6877 kg/kwh.
3) Chemical analysis of condensate, feedwater, boiler drum, saturated steam, and main steam samples showed parameters within acceptable ranges.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
46 views
Units Generated: Telangana State Power Generation Corporation LTD
1) Unit 9 of Kothagudem TPS Stage 5 generated 5.9620 MU of electricity on November 2nd 2018 with a plant load factor of 99.37% and availability of 100%.
2) Coal consumption was 4100 MT with a specific coal consumption of 0.6877 kg/kwh.
3) Chemical analysis of condensate, feedwater, boiler drum, saturated steam, and main steam samples showed parameters within acceptable ranges.
Gas-Engines and Producer-Gas Plants
A Practice Treatise Setting Forth the Principles of Gas-Engines and Producer Design, the Selection and Installation of an Engine, Conditions of Perfect Operation, Producer-Gas Engines and Their Possibilities, the Care of Gas-Engines and Producer-Gas Plants, with a Chapter on Volatile Hydrocarbon and Oil Engines