0% found this document useful (0 votes)
41 views

Assignment Project

This document provides instructions for a project planning and management assignment. Students are asked to discuss the stakeholders of the Sialkot International Airport project by listing 5 internal stakeholders, 5 external stakeholders, 5 national stakeholders, and 5 international stakeholders. The assignment is worth 10 total marks and is due on April 8, 2020.

Uploaded by

Mohsin Ali meer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Assignment Project

This document provides instructions for a project planning and management assignment. Students are asked to discuss the stakeholders of the Sialkot International Airport project by listing 5 internal stakeholders, 5 external stakeholders, 5 national stakeholders, and 5 international stakeholders. The assignment is worth 10 total marks and is due on April 8, 2020.

Uploaded by

Mohsin Ali meer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

This Week Assignment

Project Planning and Management

Total Marks = 10
Date = 06/04/2020
Submission Date = 08/04/2020

Question…..
 Assignment Question: Sialkot International Airport is a mega project which has been completed
in the near past. This airport facilitates the air cargo of the Export Triangle Cities (Gujranwala,
Gujrat and Sialkot) of Pakistan. The main export of these cities are Sports Goods, Gloves,
Surgical instruments, Sports Wears, Cutlery, Ceramics, and Leather Garments etc. This airport
also facilitates the passengers of these cities to travel abroad or to land in Pakistan. As a student
of Project Management, you are required to enlist the following points relating to Sialkot
International Airport Project:

Point of Discussion:

1. Internal Stakeholders (any five)


2. External Stakeholders (any five)
3. National Stakeholders (any five)
4. International Stakeholders (any five)

Thank you