NCR Flow Chart: Inspector QC Engineer

The NCR flow chart outlines the non-conformance report process. The inspector issues an NCR immediately when a job does not comply with project requirements or quality system, including a description, reason, and inspector's comments and signature. The vendor/performer proposes corrections or concessions and submits a response. The technical department reviews and provides an acceptance, rejection, or comment with signature. Finally, the QC manager closes out the NCR with inspector/QC engineer comments and signature.

Uploaded by

rty2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
258 views

NCR Flow Chart: Inspector QC Engineer

The NCR flow chart outlines the non-conformance report process. The inspector issues an NCR immediately when a job does not comply with project requirements or quality system, including a description, reason, and inspector's comments and signature. The vendor/performer proposes corrections or concessions and submits a response. The technical department reviews and provides an acceptance, rejection, or comment with signature. Finally, the QC manager closes out the NCR with inspector/QC engineer comments and signature.

Uploaded by

rty2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NCR FLOW CHART

INSPECTOR QC ENGINEER
Issue immediately when job Numbering NCR, Expedite
do not comply with project response from VENDOR
requirement or Quality /PERFORMER & Signature
System along with
Description, Reason,
Inspector's comments &
Signature VENDOR/PERFORMER TECHNICAL DEPARTMENT
Correction proposed/Concession Response with
Request, Explanations, any impact Accept/Reject/Comment &
on schedule, Proposed completion Signature
date, Signature

PROJECT ENGINEERING
Review Accept/Reject/
VENDOR/PERFORMER Comment , if required raise
For Final Documentation / QC Technical Query to client and
Dossier incorporate client Signature /
TQ no. & PROJECT ENGINEER
or PROJECT MANAGER
Signature

QC MANAGER
Carry out CLOSE-OUT with
INSPECTOR/QC ENGINEER,
Comments & Signature