5. Definitions
6. Resources
6.1. Equipment
6.2. Safety of Equipment’s
7. Safety Precautions
7.1. Construction Hazards
7.2. Personal Protective Equipment
7.3.
.3. Safety Training and Emergency procedures
7.4. First Aid
9.Construction Program
9.1 Housekeeping
9.2 Protection of Executed Works
9.3 Responsibilities
9.4 Records
11.Related Forms
2. Scope of Work
3.Code of Practice
4. Reference
5. Definitions
DESCRIPTION
Tool box
Test kit
Meters/gauges
Power Tools
Temporary Circulation Pump
ump
Necessary measures will be taken for the safety of the equipment and any other works affected by the works
subject of this document. Relevant entities which might require protection include any such works in the vicinity
of the area of work or on the service access or discharge path. The construction team will ensure that aany such
requirements are documented.
Danger for Danger of
Constrained Slippery Falling from
Explosive the Electrocutio Other
Space Surface Height
Environment n
____________________
____________________
____________________
____________________
____________________
____________________
____________________
____________________
The hazards identified above will be controlled under the overall project specific safety plan
p which is a separate
document communicated to all parties on the project.
The works subject of this document requires that the following PPE be used:
Safety
Gloves Protective Safety Equipment
Shoes Lifejacket Other
Required Clothing Harness Guards
Required
____________________
____________________
____________________
____________________
____________________
____________________
____________________
____________________
7.3.
.3. Safety Training and Emergency procedures
Before commencing any works, all employees will attend a site safety induction training to ensure all safety
measures are understood and implemented and to cover specific procedures in case of emergency. If necessary,
practical training exercises will be conducted
conducted on escape routes, signage, evacuation and rescue.
Name of On-Site
Site First
Aider/s:
Location of Nearest
Hospital:
8.1. Procedure
a) Preparation :
The following preparation checks / works shall be carried out prior to commencement of flushing and
cleaning of chilled water system.
i) Check and ensure the system is hydrostatically pressure tested and verify test certificate.
iii) Check and ensure sufficient quantities of chemicals are available as per requirement.
ii) Fill the underground and out house roof water reservoir before commencement of work.
iii) Fill the system with clean water and drain the water after 30 minutes.
iv) Refill the system with clean water and run the chilled water pump for 2 hours.
v) Open the drain valves in the main lines and drain the water completely.
vii) During the above flushing process the drain valves shall be kept open
open while the pump is
running, until the water appears clean.
ix) Refill the system with clean water and add cleaning chemicals at the rate of 01Kg per Meter
cube of water volume.
x) Once the cleaning process started Samples of solution shall be collected from various parts of
the system to ensure the chemical solution has reached all parts of the system.
xi) Run the pump and circulate the water (with chemicals added) for
for a minimum period of 24
hours.
xiii) After the cleaning process is completed as described above the cleaning
cleaning solution shall be
flushed out.
9. Construction Program
9.1 Housekeeping
The work area shall be maintained neat and tidy as reasonable practical at all times.
9.2 Responsibilities
Overall
Position Resp. Supervise Perform Short Description
Project Manager
Construction
Manager
Project Engineer
Site Manager
Site Engineer
Land Surveyor
Safety Engineer
QA/QC Engineer
MEP Coordinator
General Foreman
Foreman
Charge hand
Labourer
Helper
In accordance with the NEBB Commissioning procedural Standard,, the following records will be maintained as
documentary evidence of the establishment of this method statement:
In Process works shall be monitored for quality of workmanship and fabrication against approved shop
drawings and standards by the relevant supervisor.
All works shall be inspected for conformance to specification.
The inspection formats shall be used in accordance with the requirements
requirements of the Civil Aviation Authority,
consultant, CSCEC.
Raise the inspection and witness invitation for flushing of chilled water system.
system
As per site requirement SIE standard format to be modified and shall be submitted.