0% found this document useful (0 votes)
32 views

Tender No.: A-17580 Title: Outsourcing Manpower For Contact Center Hse Procedure Volume 2 of 2

This two volume document contains Health, Safety, and Environment (HSE) procedures for a contact center outsourcing project. Volume 2 includes 22 HSE procedures and guidelines covering topics like the company's HSE policy, safety rules, requirements for contractors, scaffolding, camps, communications, confined spaces, excavations, risk assessments, lock out/tag out, incident reporting, material handling, offices, PPE, emissions, and waste management. Bidders must submit a compliance letter and signed/stamped Volume 2 with their proposal.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

Tender No.: A-17580 Title: Outsourcing Manpower For Contact Center Hse Procedure Volume 2 of 2

This two volume document contains Health, Safety, and Environment (HSE) procedures for a contact center outsourcing project. Volume 2 includes 22 HSE procedures and guidelines covering topics like the company's HSE policy, safety rules, requirements for contractors, scaffolding, camps, communications, confined spaces, excavations, risk assessments, lock out/tag out, incident reporting, material handling, offices, PPE, emissions, and waste management. Bidders must submit a compliance letter and signed/stamped Volume 2 with their proposal.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Tender No.

: A-17580
Title: Outsourcing manpower for
Contact Center

HSE PROCEDURE

Volume 2 of 2

March 2020

EMPLOYER CONTRACTOR
Logo

Al Ain Distribution Company M/s ......


P.O Box 1065 P.O Box ……
Al Ain - UAE Abu Dhabi - UAE

HSE - 1 Page 1 of 2
Particular Tender Requirements
AADC Tender No. A-17580
SUPPLY DEPARTMENT

CONTENTS

No. of
Sl. No. Description
Pages
1 AADC HSE Policy 1
2 AADC System Safety Rules – Final 157
3 ADWEA HSE Requirements of Contractors Booklet 53
4 ADWEA Scaffolding Procedures – Chapter - 26 32
5 Contractors Camp and Temporary Buildings Guidelines 21
6 Communication Procedures 7
7 Confined Space Procedures 18
8 Excavation Permit Procedures 6
9 HSE Impact Assessment Procedure 13
10 HSE Plan Structure 8
11 HSE Requirements of Contractors 13
12 HSE Requirements from Group Companies, Consultants and Contractors 3
13 Hazards Identification Risk Assessment & Risk Control 2
14 Lock Out & Tag Out Procedure 19
15 Health, Safety, and Environment Risk Management guidelines Procedures 19
16 Incident Reporting, Investigation and Analysis Procedures 39
17 Material Handling and Lifting Guidelines 25
18 Office Safety Guidelines 17
19 Personal Protective Equipment (PPE) 31
20 Standards for Effluent and Emissions Discharges 7
21 Waste Management Procedure (HSEP-009) 17
22 Waste Management Quarterly Reports – Master Template 1

Note 1: A compliance letter for the above contents with Index page to be submitted along with
the proposed bids.
Note 2: The Volume-V (HSE Procedure) to be signed and stamped in all pages and to be
submitted during the Contract Agreement signature stage.

HSE - 1 Page 2 of 2

You might also like