0% found this document useful (0 votes)
66 views4 pages

Calculation of Power Consumption

This document summarizes the operating costs of a vacuum furnace used for pre-weld and post-weld heat treatment processes. It provides details on power consumption over 4 and 13 hours of operation, respectively, as well as gas and manpower costs. The total operating cost per firing is calculated to be RM5371.497 for pre-weld and RM11806.24 for post-weld treatment. When operating at full capacity with two sets, the total costs are RM10742.99 and RM23612.48, respectively. These costs are compared to operating an air furnace.

Uploaded by

Azril Dahari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views4 pages

Calculation of Power Consumption

This document summarizes the operating costs of a vacuum furnace used for pre-weld and post-weld heat treatment processes. It provides details on power consumption over 4 and 13 hours of operation, respectively, as well as gas and manpower costs. The total operating cost per firing is calculated to be RM5371.497 for pre-weld and RM11806.24 for post-weld treatment. When operating at full capacity with two sets, the total costs are RM10742.99 and RM23612.48, respectively. These costs are compared to operating an air furnace.

Uploaded by

Azril Dahari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Cost of Operating equipment

Name of equipment: Vacuum Furnace


Process: Pre-weld TP Nimonic
Voltage: 415 V
Amps: 671 A (use current at steady state - reading from Panel)
Op. hours: 4 hours
Price/KWH 0.41 RM (average after adding kW based on max. demand - data Jan - April 2011)

Apparent Power:
482.3155 KVA

Power consumption:
1929.262 KVA

Price of power consumption:


RM 790.9975 (neglect power factor) ------------------(A)

Calculation of gas usage for the operation hour:


Quantity UOM Price / Qua (RM) Total Price (RM)
Purified Argon 1 pallet 2855 2855
Purified Nitrogen 0.5 pallet 1451 725.5
3580.5 ---------------(B)

Calculation of manpower usage for the operation hours:


Rate / hourTotal hour Total manpower cost (RM)
Staff 1 100 5 500
Staff 2 100 5 500
1000 -------------------(C)
Total cost to operate the equipment for the operating hours:
A+B+C 5371.497 per firing (only half set)
10742.99 per set
Comparison:
Air furnace, 10,500 per firing (boleh buat 2 sets)
nd - data Jan - April 2011)
Cost of Operating equipment

Name of equipment: Vacuum Furnace


Process: Post weld (solution + aging) TP Nimonic
Voltage: 415 V
Amps: 671 A (use current at steady state - reading from Panel)
Op. hours: 13 hours
Price/KWH 0.41 RM (average after adding kW based on max. demand - data Jan - April 2011)

Apparent Power:
482.3155 KVA

Power consumption:
6270.102 KVA

Price of power consumption:


RM 2570.742 (neglect power factor) ------------------(A)

Calculation of gas usage for the operation hour:


Quantity UOM Price / Qua (RM) Total Price (RM)
Purified Argon 2 pallet 2855 5710
Purified Nitrogen 0.5 pallet 1451 725.5
6435.5 ---------------(B)

Calculation of manpower usage for the operation hours:


Rate / hourTotal hour Total manpower cost (RM)
Staff 1 100 14 1400 (RM100/staffhour - average incl. overhead,
Staff 2 100 14 1400
2800 -------------------(C)
Total cost to operate the equipment for the operating hours:
A+B+C 11806.24 per firing (only half set)
23612.48 per set

Comparison:
Air furnace, 21,000 per firing (boleh buat 2 sets)
nd - data Jan - April 2011)

taffhour - average incl. overhead, overtime)