3/2-Way Direct Mounting Pilot Valve
3/2-Way Direct Mounting Pilot Valve
Power consumption
Orifice Inrush AC Hold AC (hot coil) DC (hot coil)
[mm] [VA] [VA] [W] [W]
1.5 11 6 2 2
2.0 24 17 8 8
Response times
Orifice AC DC
[mm] Opening [ms] Closing [ms] Opening [ms] Closing [ms]
1.5 ca. 25 ca. 35 ca. 25 ca. 35
2.0 ca. 18 ca. 22 ca. 18 ca. 22
Response times [ms]:
Measured at valve outlet at 87 PSI and 68°F (+20°C)
Opening: pressure build-up 0 to 90%, closing: pressure relief 100 to 10%
www.burkert–usa.com p. 1/3
6014P
consumption
Orifice [mm]
Service port
flange body
(banjo bolt)
QNn value
air [l/min]
Pressure
Pressure
Material
function
coupler)
024/DC
024/60
120/60
240/60
Circuit
inlet P
(banjo
Power
range
[PSI]
[W]
CV
A
C 3/2-way, normally NPT 1/4 G 1/8 1.5 .08 75 PA 0 – 87 2 429 150 429 151 429 152 429 153
closed (NC) G 1/4 1.5 .08 75 PA 0 – 87 2 429 138 429 139 429 140 429 141
G 1/8 2.0 .13 120 Brass 0 – 145 8 429 146 429 147 429 148 429 149
G 1/4 2.0 .13 120 Brass 0 – 145 8 429 134 429 135 429 136 429 137
I &URTHERôVERSIONSôONôREQUEST
Approvals
ATEX Version (Encapsulation and intrinsically safe)
UR / UL / CSA
Materials
Flange body in stainless steel
Fixing screw
frequency
Voltage /
Circuitry
Item no.
Flat seal
p. 2/3
6014P
Dimensions [mm]
11.5
57.5
G M L
G 1/8 10 51
G 1/4 12 54
To find your nearest Burkert facility, click on the orange box ➞ www.burkert-usa.com
In case of special application conditions, We reserve the right to make technical changes without notice.
please consult for advice. © Christian Bürkert GmbH & Co. KG 0806/2_US-en_1000084665
p. 3/3