0% found this document useful (0 votes)
47 views1 page

Approved For . Calendar Days Not Approved

This document is a request for an extension of time (EOT) on a construction project. It provides the project name, original and requested completion dates, reasons for the requested extension, and approval from the project manager. The project manager will either approve or not approve the requested extension and provide any conditions for their decision.

Uploaded by

Vikash Peerthy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

Approved For . Calendar Days Not Approved

This document is a request for an extension of time (EOT) on a construction project. It provides the project name, original and requested completion dates, reasons for the requested extension, and approval from the project manager. The project manager will either approve or not approve the requested extension and provide any conditions for their decision.

Uploaded by

Vikash Peerthy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

EOT NO.

01
PROJECT NAME

CONTRACT START DATE CONTRACT COMPLETION DATE

EXTENSION OF TIME REQUESTED


FOR (incl. No. of Calendar days) PROJECTED COMPLETION DATE

REASONS FOR REQUESTING EOT

Attached CVI NO. ……………….. RFI NO. ……………..….. DRAWING NO. ………...………
REQUESTED BY

Name Signature Date

PROJECT MANAGER APPROVAL


Approved for ………………. Calendar Days
Not Approved
Conditions for Approving/Not approving EOT

Name Signature Date