This checklist provides requirements for grouting work including material checks of grout type and proportions, location checks of grout thickness and surface preparation, and requirements for finishing, curing, strength testing with a minimum 7 day curing period and testing grout strength at 7 and 28 days. The contractor is required to verify material types and proportions, check locations and prepare surfaces before pouring and finishing grout, and properly cure and test compressive strength of samples.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100%(2)100% found this document useful (2 votes)
3K views
Check List For Grouting Work: Material Checking
This checklist provides requirements for grouting work including material checks of grout type and proportions, location checks of grout thickness and surface preparation, and requirements for finishing, curing, strength testing with a minimum 7 day curing period and testing grout strength at 7 and 28 days. The contractor is required to verify material types and proportions, check locations and prepare surfaces before pouring and finishing grout, and properly cure and test compressive strength of samples.
Material Checking 1 Type of Grout and manufacturer 2 Proportion of Mix a Grout b Aggregate c Water Location Checking 3 Thickness of Grout 4 Quantity of Grout Required 5 Cleaning of Surface, Pockets, Base Frame, Bolts & Other Hol 6 Water tightness of Formwork 7 Check concrete surface has been Pre-soaked 8 Roughning and hacking of surface 9 Finishing after grout pouring 10 Curing Min 07 Days 11 Cube casting 12 Compressive Strength a 07 Days b 28 Days Remarks: