Check List For Grouting Work: Material Checking

This checklist provides requirements for grouting work including material checks of grout type and proportions, location checks of grout thickness and surface preparation, and requirements for finishing, curing, strength testing with a minimum 7 day curing period and testing grout strength at 7 and 28 days. The contractor is required to verify material types and proportions, check locations and prepare surfaces before pouring and finishing grout, and properly cure and test compressive strength of samples.

Uploaded by

abhijit jana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
3K views

Check List For Grouting Work: Material Checking

This checklist provides requirements for grouting work including material checks of grout type and proportions, location checks of grout thickness and surface preparation, and requirements for finishing, curing, strength testing with a minimum 7 day curing period and testing grout strength at 7 and 28 days. The contractor is required to verify material types and proportions, check locations and prepare surfaces before pouring and finishing grout, and properly cure and test compressive strength of samples.

Uploaded by

abhijit jana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECK LIST FOR

GROUTING WORK
CONTRACT NO.: 1-14-4200/4399 Report No.: Date:

CLIENT:- Indian Oil Corporation Ltd Format No: TELC/IOCL/TKIS/GROUT/F-023

PMC:-ThyssenKrupp Industrial Solutions (India) CONTRACTOR:-Tauman Engineering Limited

Sl. No. Description of Work Required Actual


Material Checking
1 Type of Grout and manufacturer
2 Proportion of Mix
a Grout
b Aggregate
c Water
Location Checking
3 Thickness of Grout
4 Quantity of Grout Required
5 Cleaning of Surface, Pockets, Base Frame, Bolts & Other Hol
6 Water tightness of Formwork
7 Check concrete surface has been Pre-soaked
8 Roughning and hacking of surface
9 Finishing after grout pouring
10 Curing Min 07 Days
11 Cube casting
12 Compressive Strength
a 07 Days
b 28 Days
Remarks:

TEL tkIS IOCL


Signature
Name
Date