The document outlines the space allocation and area requirements for different zones in an area program, including administration, academic, cultural, service, and other areas. It provides the space, number of users, and total area for facilities like a reception, directors office, board room, auditorium, theaters, music studios, art galleries, cafeterias, and more. The total area requirements are calculated based on the number of users accommodated in each space.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
173 views
BB2020 Area Programe
The document outlines the space allocation and area requirements for different zones in an area program, including administration, academic, cultural, service, and other areas. It provides the space, number of users, and total area for facilities like a reception, directors office, board room, auditorium, theaters, music studios, art galleries, cafeterias, and more. The total area requirements are calculated based on the number of users accommodated in each space.
Robert Blanchard The Stone Missal A Grimoire On The Magick of The Gargoyles-International Guild of Occult Sciences, College and Research Society (1993)