Advance Direction Sign: 4.10 Manipur

This document provides updates on road construction projects across several Indian states. In Assam, 25 highway improvement projects costing 1,487 crore are underway, and a 667 km East-West corridor has been mostly completed. Under other programs, 44 state road projects are in progress for 859 crore and 2 projects are underway for 82 crore. New projects approved include the four-laning of NH-37 and an Arunachal Pradesh roads package. In Manipur, 11 highway projects costing 875 crore and 2 bridge projects for 53 crore are ongoing. Meghalaya has 6 projects for 71 crore in progress.

Uploaded by

Q C Shamlaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

Advance Direction Sign: 4.10 Manipur

This document provides updates on road construction projects across several Indian states. In Assam, 25 highway improvement projects costing 1,487 crore are underway, and a 667 km East-West corridor has been mostly completed. Under other programs, 44 state road projects are in progress for 859 crore and 2 projects are underway for 82 crore. New projects approved include the four-laning of NH-37 and an Arunachal Pradesh roads package. In Manipur, 11 highway projects costing 875 crore and 2 bridge projects for 53 crore are ongoing. Meghalaya has 6 projects for 71 crore in progress.

Uploaded by

Q C Shamlaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Ministry of Road Transport & Highways, Government of India

Advance Direction
Sign

4.8.2 As on 31st March 2019, one improvement works costing ₹ 943.40 Crore is in progress under
NH(O)
4.8.3 Under the CRF, 58 works for the Improvement of state roads amounting to ₹ 522 Crore are in
progress for the improvement of State Roads.
4.8.4 Under the EI & ISC schemes, 12 works costing ₹ 292.21 crore are in progress.
4.9 Assam
4.9.1 As on 31stMarch, 2019, 25 improvement works costing ₹ 1,487.08 crore, are in progress under
NH (O).
4.9.2 A length of 667 Km connecting Silchar to Srirampur via Lumding-Daboka-Nagaon-Guwahati
in Assam has been entrusted to NHAI & NHIDCL as part of East West corridor under NHDP
Phase-II. East-West Corridor portion in Assam. Work in 636 Km has been awarded by NHAI
and about 606 Km, including 18 Km of Guwahati bypass, have been completed so far. For
balance 31 Km length, work has been awarded by NHIDCL.
4.9.3 Under the CRF, 44 works amounting to ₹ 859.06 crore are in progress for the improvement of
state Roads.
4.9.4 Two works amounting to about ₹ 81.52 crore are in progress under ISC scheme.
4.9.5 Government has approved implementation of four laning of NH-37 from Numaligarh to
Dibrugarh (201 Km) along with construction of 4-lane bridge over river Brahmputra
connecting Numaligarh and Gohpur under Phase 'A' SARDP-NE. The work has been
awarded in six packages from Numaligarh –Dibrugarh and is under implementation by
NHIDCL. As regard to Numaligarh-Gohpur bridge, consultant has been engaged for
preparation of DPR.
4.9.6 Government has approved implementation of Arunachal Pradesh Package of Roads &
Highways covering 2319 Km of roads at an estimated cost of ₹ 11,919 crore. Out of 2,319 Km,
139 Km falls in the State of Assam.
4.10 Manipur
4.10.1 As on 31st March, 2019, 11improvements works costing ₹ 874.90 crore, and work on two
bridge costing ₹ 53.32 crore are in progress under NH(O)
4.10.2 Under CRF, 10 works amounting to ₹ 141.58 crore are in progress.
4.10.3 Under EI & ISC, 4 works amounting to ₹ 210.97 crore are in progress.
4.11 Meghalaya
4.11.1 As on 31st March, 2019, 06 works amounting to ₹ 71.41 crore are in progress under NH(O).