CSC MST Test-III Project Management CS-604 (B) - Google Forms

This document appears to be a test on project management concepts for a Computer Science MST program. It consists of 14 multiple choice or short answer questions covering topics like the definition of project management, the project life cycle, responsibilities of a project manager, and factors that define project performance such as time, cost and quality. The test is assessing students' understanding of foundational project management terminology and processes.

Uploaded by

sumit jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

CSC MST Test-III Project Management CS-604 (B) - Google Forms

This document appears to be a test on project management concepts for a Computer Science MST program. It consists of 14 multiple choice or short answer questions covering topics like the definition of project management, the project life cycle, responsibilities of a project manager, and factors that define project performance such as time, cost and quality. The test is assessing students' understanding of foundational project management terminology and processes.

Uploaded by

sumit jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

5/12/2020 Computer Science Department

Computer Science Depa ment


CSC MST Test-III Project Management CS-604(B)
* Required

1. Email address *

2. Student Name *

3. Roll Number *

4. 1-A ____ is a set of activities which are networked in an order and aimed towards
achieving the goals of a project. *

Mark only one oval.

Project

Process

Project management

Project cycle

https://docs.google.com/forms/d/14bintyazKUlw_hOIRTUVrthwGpfwp5RWE8xSPtfJrlI/edit 1/5
5/12/2020 Computer Science Department

5. 2-Resources refers to *

Mark only one oval.

Manpower

Machinery

Materials

All of the above

Option 5

6. 3-Developing a technology is an example of *

Mark only one oval.

Process

Project

Scope

All of the above

7. 4-The project life cycle consists of *

Mark only one oval.

Understanding the scope of the project

Objectives of the project

Formulation and planning various activities

All of the above

https://docs.google.com/forms/d/14bintyazKUlw_hOIRTUVrthwGpfwp5RWE8xSPtfJrlI/edit 2/5
5/12/2020 Computer Science Department

8. 5-Following is(are) the responsibility(ies) of the project manager. *

Mark only one oval.

Budgeting and cost control

Allocating resources

Tracking project expenditure

All of the above

9. 6-Following are the phases of Project Management Life Cycle. Arrange them in
correct order Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing
and delivery *

Mark only one oval.

3-2-1-4

1-2-3-4

2-3-1-4

4-3-2-1

10. 7-Design phase consist of *

Mark only one oval.

Input received

Output received

Both (A) and (B)

None of the above

https://docs.google.com/forms/d/14bintyazKUlw_hOIRTUVrthwGpfwp5RWE8xSPtfJrlI/edit 3/5
5/12/2020 Computer Science Department

11. 8-Project pe ormance consists of *

Mark only one oval.

Time

Cost

Quality

All of the above

12. Explain A ifacts and its type *

13. Explain Project Responsibilities *

14. Explain the Project Environment with its state *

https://docs.google.com/forms/d/14bintyazKUlw_hOIRTUVrthwGpfwp5RWE8xSPtfJrlI/edit 4/5
5/12/2020 Computer Science Department

This content is neither created nor endorsed by Google.

 Forms

https://docs.google.com/forms/d/14bintyazKUlw_hOIRTUVrthwGpfwp5RWE8xSPtfJrlI/edit 5/5

You might also like