Independent Verification & Validation Plan
Independent Verification & Validation Plan
Blue italicized text enclosed in angle brackets (<text>) indicates a field that
should be replaced with information specific to a particular project.
Text and tables in black are provided as boilerplate examples of wording and
formats that may be used or modified as appropriate to a specific project. These
are offered only as suggestions to assist in developing project documents; they
are not mandatory formats.
2 IV&V approach.............................................................5
2.1 Organization.............................................................................................................5
2.2 IV&V Activities..........................................................................................................5
2.3 IV&V Reporting........................................................................................................5
2.4 Assumptions and Constraints................................................................................5
3 IV&V Responsibilities...................................................6
Appendix A: Independent Verification & Validation Plan Approval
7
Appendix B: References.......................................................8
Appendix C: Key Terms........................................................9
The IV&V Plan is created during the Planning Phase of the project as a part of the
Project Management Plan. The intended audience is project stakeholders such as the
project sponsor and senior leadership.
2 IV&V APPROACH
2.1 ORGANIZATION
[Describe the organization of the IV&V effort. Include the degree of independence
required as well as any variance to the EPLC requirements which will require
governance approval as a component of the Project Process Agreement.]
2.2 IV&V ACTIVITIES
[List and define the IV&V activities that are appropriate to the project given the
size and risk factors. The IV&V Activities Job Aid document provides a
comprehensive list for consideration.]
2.3 IV&V REPORTING
[List and define the IV&V Assessment Reviews that are appropriate to the project
given the size and risk factors. The EPLC Stage Gate Reviews cycle provides a
framework for consideration. Use this to outline the deliverables to be completed
by the IV&V effort.]
2.4 ASSUMPTIONS AND CONSTRAINTS
[Include a detailed explanation of any assumptions and/or constraints applied to
the information documented within this IV&V Plan.]
The undersigned acknowledge that they have reviewed the Independent Verification
& Validation Plan and agree with the information presented within this document.
Changes to this Independent Verification & Validation Plan will be coordinated with,
and approved by, the undersigned, or their designated representatives.
[List the individuals whose signatures are desired. Examples of such individuals are
Business Owner, Project Manager, and any appropriate stakeholders. Add additional
lines for signature as necessary.]
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role: