0% found this document useful (0 votes)
182 views

Approved by Approved By: Del Monte Philippines, Inc. Del Monte Philippines, Inc

This document appears to be an approval form for an engineering project. It lists the departments and positions that must sign off on the project, including Cannery Operations Director, Project Engineering, Powerplant, Safety and Health, Quality Assurance, Wastewater Treatment, Electrical, Plant Maintenance, and Project Owner. Once all required signatures have been obtained, the project is approved to move forward.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views

Approved by Approved By: Del Monte Philippines, Inc. Del Monte Philippines, Inc

This document appears to be an approval form for an engineering project. It lists the departments and positions that must sign off on the project, including Cannery Operations Director, Project Engineering, Powerplant, Safety and Health, Quality Assurance, Wastewater Treatment, Electrical, Plant Maintenance, and Project Owner. Once all required signatures have been obtained, the project is approved to move forward.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

APPROVED BY

CANNERY OPRN. DIRECTOR

W
SIGNATURE OVER PRINTED NAME

S
DESIGNATION

North
DATE SIGNED

PROJECT ENG'G. DEPT.


20.30m

E
SIGNATURE OVER PRINTED NAME

DESIGNATION

DATE SIGNED

POWERPLANT DEPT.

SIGNATURE OVER PRINTED NAME

DESIGNATION

DATE SIGNED

S.H.E.C. DEPT.

SIGNATURE OVER PRINTED NAME

DESIGNATION

DATE SIGNED
13.00m QA / SANITATION DEPT.

EXTRACTION AREA
SIGNATURE OVER PRINTED NAME

DESIGNATION

DATE SIGNED

WWTP DEPT.

SIGNATURE OVER PRINTED NAME

DESIGNATION

DATE SIGNED

13.00m ELECTRICAL DEPT.

SIGNATURE OVER PRINTED NAME

DESIGNATION

DATE SIGNED

PLANT MTCE. DEPT.

SIGNATURE OVER PRINTED NAME

DESIGNATION

DATE SIGNED

PROJECT OWNER

SIGNATURE OVER PRINTED NAME

DESIGNATION

DATE SIGNED

5
DESIGNED ENGINEERING SUPERVISOR OWNER AND LOCATION PROJECT TITLE SHEET CONTENTS DRAWING NUMBER SHEET NUMBER
4

DRAWN MACA NAME : 3


REG. NO. : DEL MONTE PHILIPPINES, INC. NFC JUICING PLANT
- Plan 2
1
CHECKED CPG T.I.N. NO. : CANNERY ENGINEERING 5
1
PTR NO. : DATE ISSUED : BUGO, CAGAYAN DE ORO CITY FILENAME
APPROVED RYL PLACE ISSUED : PROJECT LOCATION
LOCATION:
NO BY DATE R E V I S I O N S ADDRESS

You might also like