Job: TICKET LEVEL BOX 1 Revision Construction Span: 2.625m Composite Span 1.9m Date: 4/1/2020 Design of Composite Deck Slab To Eurocode
Job: TICKET LEVEL BOX 1 Revision Construction Span: 2.625m Composite Span 1.9m Date: 4/1/2020 Design of Composite Deck Slab To Eurocode
Page 1
Job: TICKET LEVEL BOX 1 Revision Design of Composite Deck Slab to Eurocode
Construction span: 2.625m
Composite span = 1.9m
Date : 4/1/2020
PROPERTIES OF MATERIALS
Partial factor of safety: Profiled steel sheeting:
ϒc = 1.5 Ap = 1250 mm2
ϒs = 1.15 Ip = 1035145 mm4
ϒM0= 1 Ep = 210000 MPa
ϒM1= 1 fyp,k = 350 MPa
ϒVs= 1.25 fypd = 350 MPa
τu,Rk = 0.26 MPa
Concrete:
fck = 32 MPa
fcd= 21.33333 MPa Reinforcement:
0.85fcd = 18.13333 MPa fsk = 500 MPa
Ecm = 33345.76 MPa fsd = 434.78261 MPa
LOADS
Area of concrete section = 1.38E+05 mm2
density of dry reinforced concrete = 26.30 KN/m3
density of wet reinforced concrete = 27.62 KN/m3
Weight of dry concrete and reinforcement = 3.62 KN/m2
Weight of wet concrete and reinforcement = 3.80 KN/m2
Construction Stage
wet concrete slab = 3.80 KN/m2
profiled steel sheeting = 0.11 KN/m2
total permanent loads ( gk,1) = 3.91 KN/m2
construction loads (qk,1)= 1.50 KN/m2
Composite Stage
dry concrete slab = 3.62 KN/m2
profiled steel sheeting = 0.11 KN/m2
Floor finishes = 6.00 KN/m2
total permanent loads ( gk,2) = weight of slab + finishes = 9.73 KN/m2
Linear Perpendicular loads(gk,3) = 16.00 KN/m
Linear Parallel loads (gk,4)= 0.00 KN/m
imposed floor loads(qk,2) = 6.00 KN/m2
CONSTRUCTION STAGE
Span(L) = 2.625 m
ULTMATE LIMIT STATE
ϒG = 1.35
ϒQ = 1.50
2
Design load(ed) = ϒG*gk,1 + ϒQ*qk,1 = 8.11 KN/m
Page 2
Job: TICKET LEVEL BOX 1 Revision Design of Composite Deck Slab to Eurocode
Construction span: 2.625m
Composite span = 1.9m
Date : 4/1/2020
MRd = 8.84 KN.m/m Bending capacity provided by manufacturer
Rw,Rd/web = 2.89 KN/m single web shear capacity provided by manufaturer
Page 3
Job: TICKET LEVEL BOX 1 Revision Design of Composite Deck Slab to Eurocode
Construction span: 2.625m
Composite span = 1.9m
Date : 4/1/2020
b= 57.00 mm Kσ = 4.00
ψ= 1.00 λp = 0.72
σcom = 121.91 MPa ε= 1.39
ρ= 0.96 Flange width reduced
beff = 54.86 mm b1eff = beff/2 = 27.43 mm
COMPOSITE STAGE
Span (L) = 1.9 m
ULTIMATE LIMIT STATE
ϒG = 1.35
ϒQ = 1.50
2
Design load(ed) = ϒG*(gk,2 + gk,4) + ϒQ*qk,2 = 22.13 KN/m
Design concentrated load (edc) = ϒG*gk,3 21.60 KN/m
MEd = ed * L^2 /8 + edc * L / 4 = 20.25 KN.m/m
Ncf = 437.50 KN
required length for full shear connection (Lx) = Ncf / (τu,Rd * b) = 2.10 m
Lx(actual) = 0.95 m <Lx, Partial shear connection
Page 4
Job: TICKET LEVEL BOX 1 Revision Design of Composite Deck Slab to Eurocode
Construction span: 2.625m
Composite span = 1.9m
Date : 4/1/2020
Check deflection:
consider slab as simply supported L/dp = 13.82
L/dp < 20 no need to check deflection
Page 5
Job: TICKET LEVEL BOX 1 Revision Design of Composite Deck Slab to Eurocode
Construction span: 2.625m
Composite span = 1.9m
Date : 4/1/2020
ψ= 0.70
δL.L = 0.14 mm
δ(total) = 0.89 mm
δL.Lall = L/480 = 3.96 mm
δall = L/250 = 7.60 mm
δL.L/δL.Lall = 0.03 <1 PASS
δ(total)/δall = 0.12 <1 PASS
FIRE CASE
Design Load (ed) = (gk,2 + gk,4) + (qk,2) 15.73 KN/m
Design concentrated load (edc) = gk,3 16.00 KN/m
MEd = ed * L^2 /8 + edc * L / 4 = 14.70 KN.m/m
2
use : ø12 /rib of As = 339.29 mm /m
fs,d = fs,k/ϒM0 = 500.00 MPa
fcd = 21.33 MPa
Nc = fcd x Ac = 2933.33 KN
Np = fs,d x As = 169.65 KN
Np < Ncf, neutral axis lies within concrete above sheeting
Xpl = Ap x fyp,d / 0.85fcd x b = 9.36 mm
cover = 50.00 mm
z = h - c -(xpl/2) 120.32 mm
Page 6