System Development Life Cycle (SDLC) Mcqs
System Development Life Cycle (SDLC) Mcqs
a) Steering committee
b) Project managers
c) Business Analyst
d) Domain Specialist
Q2. “Consider a system where, a heat sensor detects an intrusion and alerts the security
company.” What kind of a requirement the system is providing ?
a) Functional
b) Non-Functional
c) Known Requirement
Q3. Which one of the following models is not suitable for accommodating changes?
a) spiral model
b) Prototyping Model
c) RAD Model
d) Waterfall Model
Q4. The work associated with software development can be categorized into three generic phases
, regardless of application area, project size, or complexity ,namely the__________ phase which
focuses on what, the_________ phase which focuses on how and the_________ phase which
focuses on change.
i. support
ii. development
iii. definition
a) 1, 2, 3
b) 2, 1, 3
c) 3, 2, 1
d) 3, 1, 2
a) Maintainability
b) Portability
c) Robustness
Q7. Which of the following is not the primary objectives in the Preliminary investigation of system
development?
d)Report finding to the management with recomendation to accept or reject the proposal
Q8. _________ and _________ are not the subject matter of Requirement Analysis.
c) Functional, Non-Functional
Q9. Arrange the given sequence to form a SRS Prototype outline as per SRS Standard.
i. General description
ii. Introduction
iii. Review
iv. Appendices
v. Specific Requirements
a) iii, i, ii,v, iv
b) iii, ii, i, v, iv
d) iii, i, ii,v,iv
b) Process errors are avoided or trapped before they result in product errors
c) Defined process is acceptable and usable by the engineers responsible for producing the
software
a) alpha testing
b) beta testing
c) regression testing
a) Performance
b) Functionality
c) Design solutions
d) External Interfaces
Q13. If you were a lead developer of a software company and you are asked to submit a project
/product within a stipulated time-frame but within cost barriers, which model would you select?
a) Waterfall
b) Spiral
c) RAD
d) Incremental
a) Only i is true
B . Feasibility Study
C. Implementation phase
D. Maintenance phase
Q16. Which two of the following models will not be able to give the desired outcome if user’s
participation is not involved?
Q19. The modification of the software to match changes in the ever changing environment, falls
under which category of software maintenance?
a) Corrective
b) Adaptive
c) Perfective
d) Preventive
Q20. Which model can be selected if user is involved in all the phases of SDLC?
a) Waterfall Model
b) Prototyping Model
a) Expandability
b) Existence of technology
c) Suitability of technology
Q22. Which of the following life cycle model can’t be chosen if the development team has less
experience on similar projects?
a) Spiral
b) Waterfall
c) RAD
d) Iterative Model
a) Sequential structure
b) A List
c) A plan
d) An Algorithm
Q24. Which of the following property does not correspond to a good Software Requirements
Specification (SRS) ?
a) Verifiable
b) Ambiguous
c) Complete
d) Traceable
a) Condition Stub
b) Preferences Stub
c) Action Stub
d) Action Entries
a) Error corrections
b) Enhancements of capabilities
a) Developers
b) Testers
c) Users
a) True
b) False
a) Stress
b) Structural
c) Functional
d) Security
A. Waterfall modeling
B. Iterative modeling
Q32. Which of the following does not apply to agility to a software process?
Solution
1 c 9 c 17 b 25 b
2 a 10 d 18 c 26 d
3 d 11 b 19 b 27 a
4 c 12 c 20 c 28 c
5 b 13 c 21 d 29 a
6 d 14 c 22 a 30 d
7 c 15 b 23 d 31 c
8 b 16 d 24 b 32 c