0% found this document useful (0 votes)
42 views1 page

1 General Assumptions: 1.1.causeways

This document discusses the design of causeways connecting Singapore to Johor and Riau, consisting of 62 and 70 spans respectively. Each span is 40 meters long and uses prestressed concrete I-girders (PCI girders) placed on pile caps as the design. The PCI girders include components like diaphragms and half concretes to connect the girders as shown in the figure.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

1 General Assumptions: 1.1.causeways

This document discusses the design of causeways connecting Singapore to Johor and Riau, consisting of 62 and 70 spans respectively. Each span is 40 meters long and uses prestressed concrete I-girders (PCI girders) placed on pile caps as the design. The PCI girders include components like diaphragms and half concretes to connect the girders as shown in the figure.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

1 GENERAL ASSUMPTIONS

1.1.Causeways

The causeways basically consist of 62 spans (to Johor) and 70 spans (to Riau). The length of each
span is 40 m. The design is utilizing PCI girders (Prestressed Concrete I-girders) placed on pile caps.
Other components required for PCI girders are diaphragms and half concretes, shown in Fig 1.2

Fig 1.2 PCI girders