Horn Sea Wind Farm 02 Offshore Substation Cooling Pipe & Instrumentation Diagrams (P&Id) All Decks

The document contains piping and instrumentation diagrams for the cooling systems on multiple decks of an offshore substation. It includes labeling conventions for equipment and piping identifiers as well as revision information.

Uploaded by

kristian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
207 views

Horn Sea Wind Farm 02 Offshore Substation Cooling Pipe & Instrumentation Diagrams (P&Id) All Decks

The document contains piping and instrumentation diagrams for the cooling systems on multiple decks of an offshore substation. It includes labeling conventions for equipment and piping identifiers as well as revision information.

Uploaded by

kristian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

HORN SEA WIND FARM 02

OFFSHORE SUBSTATION
COOLING PIPE & INSTRUMENTATION DIAGRAMS (P&ID)
ALL DECKS
REVISION NUMBER
HVAC - OFFSHORE SUBSTATION P&ID- COOLING PIPE & INSTRUMENTATION DIAGRAMS
DRAWING NUMBER DESCRIPTION
#HOW02=Z11XAM02&MFB501/001 OFFSHORE SUBSTATION - P&ID COOLING PIPE & INSTRUMENTATION DIAGRAMS - ROOF DECK C01
#HOW02=Z11XAM02&MFB501/002 OFFSHORE SUBSTATION - P&ID COOLING PIPE & INSTRUMENTATION DIAGRAMS - UTILITY DECK C01
#HOW02=Z11XAM02&MFB501/003 OFFSHORE SUBSTATION - P&ID COOLING PIPE & INSTRUMENTATION DIAGRAMS - MEZZANINE DECK C01
#HOW02=Z11XAM02&MFB501/004 OFFSHORE SUBSTATION - P&ID COOLING PIPE & INSTRUMENTATION DIAGRAMS - MAIN DECK C01
#HOW02=Z11XAM02&MFB501/005 OFFSHORE SUBSTATION - P&ID COOLING PIPE & INSTRUMENTATION DIAGRAMS - HVAC ROOM (UTILITY DECK) C01

INLINE EQUIPMENT RDS-PP CODE

F0 F1 F2 P1

ANN AAA NN AA NNN AA N NN

GQ = AIR HANDLING UNIT(AHU) AHU UNIT # = 001 DECK # SUPPLY PENETRATION PIECE
Z11 = OSS XAM = HVAC 01 = VENTILATION BM = HUMIDITY TRANSMITTER
# = 01-50
Z01 = RCS SYSTEM 02 = AIR CONDITIONING BP = PRESSURE DIFFERENTIAL O ROOF DECK = 8NN-900
SUPPLY STRING # = 100-199 DECK PENETRATION PIECE #
TRANSMITTER (PDT)/ PRESSURE S UTILITY DECK = 6NN-800 = 51-99
RELIEF DUCT (PRD) # = DIFFERENTIAL INDICATOR S MEZZANINE DECK = 5NN-600 RELIEF PENETRATION PIECE
WP = MAIN DISTRIBUTION 201-299 TRANSMITTER (PDIT)
STRING/ DUCT/ PIPE CHILLED WATER SUPPLY # = (PRD) # = 01-99
MAIN DECK = 2NN-400
300-399 BR = SMOKE DETECTOR VENTILATION LOUVERS # =
ROOF DECK = 5NN-600 01-50
CHILLED WATER RETURN # = R C01 2-SEPT-19 NG.H HAN.H ISSUED FOR INFORMATION (IFI)
400-499 BT = TEMPERATURE TRANSMITTER C UTILITY DECK = 4NN-500 A02 30-MAY-19 JWA MPO REISSUED FOR REVIEW (IFR)
VENTILATION HOOD # = 51-99
S MAIN DECK = 2NN-300
A01 27-MAY-19 NG.H HAN.H ISSUED FOR REVIEW (IFR)
TABLE 1 EB = ELECTRICAL HEATING P01 01-APR-19 NG.H HAN.H INTER DISCIPLINE CHECK (IDC)

TABLE 3 TABLE 4 Rev. Date Accep. Appr. Description


Drawn by Accepted Approved
EQ = COOLING BY CONVECTION 01-APR-19 LSL/HGS 01-APR-19 NG.H 01-APR-19 HAN.H
Scale Size Ørsted Document No.
GQ = FAN BLOWER NTS A3 00553992
Supplier Supplier Document No.
QM = ELECTRIC-ACTUATED Sembcorp Marine Offshore Platforms Pte. Ltd. N/A
SHUT-OFF DAMPER
RF = FILTER/SEPARATOR
sembcorp
marine
UA = PENETRATION PIECE (SUPPLY/
PRD/ DECK PENETRATION) Kraftværksvej 53 - 7000 Fredericia - Denmark
Tel. +45 9955 1111
www.orsted.dk

WP = DISTRIBUTION DUCT
Horn Sea Wind Farm 02
TABLE 2
OFFSHORE SUBSTATION
P&ID COOLING PIPE AND INSTRUMENTATION
DIAGRAMS - ALL DECKS
RDS-PP code Rev.:
#HOW02=Z11XAM02&MFB501 C01
This unpublished drawing is not available to the public and must not be used, copied or handed over to any third party or otherwise disposed of without DONG Energy's expressed permission in writing
NOTES:
PIPING DISTRIBUTION - OSS - ROOF DECK 1. MOTORIZED VALVES SHALL BE WITH
POSITION INDICATORS TO MONITOR
OPEN/CLOSED POSITIONS.

2. AIR SEPARATOR SHALL DE-AERATE THE


BUFFER VESSEL.

3. REMOVABLE PIPE SPOOL FOR BASKET


STRAINER INSTALLATION DURING
COMMISSIONING.

4. AIR SEPARATOR SHALL BE INSTALLED AS


HIGH AS POSSIBLE.

5. CONTROL VALVE FOR CONDENSING


PRESSURE CONTROL DURING SYSTEM
STARTUP.

COOLING WATER TO HVA/C ROOM 6. BYPASS PIPE FOR ACHIEVING A MINIMUM


WP308-WP801 TP01
CONTINUOUS FLOW AT THE LOWEST
(8) DRY COOLER 1
#HOW02=Z11XAM02&MFB801/002
#HOW02=Z11XAM02&MFB801/002
WP413-WP801 TP02 FREQUENCY ON THE PUMP VARIABLE SPEED
=Z11XAM02EZ011-EZ801
(5) COOLING WATER FROM HVA/C ROOM
6"
DRIVE.

88620 7. FOR INSTRUMENTATION AND HEATING


COOLING WATER TO HVA/C ROOM REFER TO D&ID DRAWINGS
WP359-WP801 TP03
#HOW02=Z11XAM02&MFB801/002 DRY COOLER 2
(9)
#HOW02=Z11XAM01&MFB501.
WP457-WP801 TP04
#HOW02=Z11XAM02&MFB801/002 =Z11XAM02EZ012-EZ801
COOLING WATER FROM HVA/C ROOM 8. FOR DETAIL P&ID, PLEASE REFER TO
VENDOR'S DOCUMENT
#HOW02=Z11XAM02&MFB801

3"
26200

WP301-WP801 TP06
AIR HANDLING UNIT
WP401-WP801 =Z11XAM01GQ001 TP07
TP05

C01 2-SEPT-19 NG.H HAN.H ISSUED FOR INFORMATION (IFI)


A02 30-MAY-19 NG.H HAN.H RE-ISSUED FOR EWVIEW (IFR)
A01 27-MAY-19 NG.H HAN.H ISSUED FOR REVIEW (IFR)
P01 01-APR-19 NG.H HAN.H INTER DISCIPLINE CHECK (IDC)
Rev. Date Accep. Appr. Description
Drawn by Accepted Approved
01-APR-19 LSL 01-APR-19 NG.H 01-APR-19 HAN.H
Scale Size Ørsted Document No.
NTS A3 00553992
Supplier Supplier Document No.
Sembcorp Marine Offshore Platforms Pte. Ltd. N/A

sembcorp
marine
Kraftværksvej 53 - 7000 Fredericia - Denmark
Tel. +45 9955 1111
www.orsted.dk

Horn Sea Wind Farm 02


OFFSHORE SUBSTATION
P&ID COOLING PIPE AND INSTRUMENT DIAGRAMS
- ROOF DECK
RDS-PP code Rev.:
#HOW02=Z11XAM02&MFB501/001 C01
This unpublished drawing is not available to the public and must not be used, copied or handed over to any third party or otherwise disposed of without DONG Energy's expressed permission in writing
NOTES:

PIPING DISTRIBUTION - OSS - UTILITY DECK 1. MOTORIZED VALVES SHALL BE WITH


POSITION INDICATORS TO MONITOR
OPEN/CLOSED POSITIONS.

2. AIR SEPARATOR SHALL DE-AERATE THE


BUFFER VESSEL.
3"
10420 CHILLED WATER (MAIN RETURN) 3. REMOVABLE PIPE SPOOL FOR BASKET
WP401-WP501
FROM MEZZANINE DECK STRAINER INSTALLATION DURING
WP301-WP501
#HOW02=Z11XAM02&MFB801/003
(1) COMMISSIONING.
(4) #HOW02=Z11XAM02&MFB801/003
CHILLED WATER (MAIN SUPPLY) 4. AIR SEPARATOR SHALL BE INSTALLED AS
4" TO MEZZANINE DECK
CHILLED WATER (MAIN RETURN) HIGH AS POSSIBLE.
FROM MEZZANINE DECK 40350 CHILLED WATER (REDUNDANT SUPPLY)
WP401-WP502 TO MEZZANINE DECK
#HOW02=Z11XAM02&MFB801/003 WP351-WP501
#HOW02=Z11XAM02&MFB801/003 5. CONTROL VALVE FOR CONDENSING
#HOW02=Z11XAM02&MFB801/003
CHILLED WATER (MAIN SUPPLY)
WP301-WP502
WP451-WP501
#HOW02=Z11XAM02&MFB801/003 (2) PRESSURE CONTROL DURING SYSTEM
TO MEZZANINE DECK CHILLED WATER (REDUNDANT RETURN) STARTUP.
FROM MEZZANINE DECK

HVA/C ROOM 6. BYPASS PIPE FOR ACHIEVING A MINIMUM


CONTINUOUS FLOW AT THE LOWEST
WP301-WP601

WP401-WP601

WP352-WP601

WP452-WP601
TOILET 2 FREQUENCY ON THE PUMP VARIABLE SPEED
WORKSHOP TOILET 1
DRIVE.

FES 7. FOR INSTRUMENTATION AND HEATING


6" 3" ROOM 2 REFER TO D&ID DRAWINGS
50770 11530 #HOW02=Z11XAM01&MFB501.
(10) (11) (10) (11) FES ROOM 1 STORAGE DAY CREW LOCKER
ROOM 02 8. FOR DETAIL P&ID, PLEASE REFER TO
ROOM ROOM
VENDOR'S DOCUMENT
#HOW02=Z11XAM02&MFB801
WP402-WP601

WP302-WP601

COOLING WATER FROM ROOF


#HOW02=Z11XAM02&MFB801/001 1.5"
1460 STORAGE
#HOW02=Z11XAM02&MFB801/001
ROOM 01
(8)
COOLING WATER TO ROOF

TP08 TP09 HELI PILOT HELI PILOT


COOLING WATER FROM ROOF
FAN COIL UNIT ROOM 1 ROOM 2
#HOW02=Z11XAM02&MFB801/001
=Z11XAM02EZ101-EZ601
#HOW02=Z11XAM02&MFB801/001

(9)
COOLING WATER TO ROOF
TP10

TRANSFORMER ROOM 6 TRANSFORMER ROOM 4 TRANSFORMER ROOM 2

TRANSFORMER ROOM 5 TRANSFORMER ROOM 3 TRANSFORMER ROOM 1

C01 2-SEPT-19 NG.H HAN.H ISSUED FOR INFORMATION (IFI)


HV SHUNT 3 NER ROOM 3 HV SHUNT 2 NER ROOM 2 HV SHUNT 1 NER ROOM 1 A02 30-MAY-19 NG.H HAN.H RE-ISSUED FOR EWVIEW (IFR)
A01 27-MAY-19 NG.H HAN.H ISSUED FOR REVIEW (IFR)
P01 01-APR-19 NG.H HAN.H INTER DISCIPLINE CHECK (IDC)
Rev. Date Accep. Appr. Description
Drawn by Accepted Approved
01-APR-19 LSL 01-APR-19 NG.H 01-APR-19 HAN.H
Scale Size Ørsted Document No.
NTS A3 00553992
Supplier Supplier Document No.
Sembcorp Marine Offshore Platforms Pte. Ltd. N/A

sembcorp
marine
Kraftværksvej 53 - 7000 Fredericia - Denmark
Tel. +45 9955 1111
www.orsted.dk

Horn Sea Wind Farm 02


OFFSHORE SUBSTATION
P&ID COOLING PIPE AND INSTRUMENT DIAGRAMS
- UTILITY DECK
RDS-PP code Rev.:
#HOW02=Z11XAM02&MFB501/002 C01
This unpublished drawing is not available to the public and must not be used, copied or handed over to any third party or otherwise disposed of without DONG Energy's expressed permission in writing
NOTES:
1. MOTORIZED VALVES SHALL BE WITH

PIPING DISTRIBUTION - OSS - MEZZANINE DECK POSITION INDICATORS TO MONITOR


OPEN/CLOSED POSITIONS.

2. AIR SEPARATOR SHALL DE-AERATE THE


BUFFER VESSEL.

3. REMOVABLE PIPE SPOOL FOR BASKET


STRAINER INSTALLATION DURING
COMMISSIONING.
(4) (2) (3) 4. AIR SEPARATOR SHALL BE INSTALLED AS
HIGH AS POSSIBLE.

5. CONTROL VALVE FOR CONDENSING


PRESSURE CONTROL DURING SYSTEM
STARTUP.

3" 3" 2" 1.5"


1"
6. BYPASS PIPE FOR ACHIEVING A MINIMUM
11530 8480 6230 4220
1110 CONTINUOUS FLOW AT THE LOWEST
4"
=Z11XAM02WP370-WP501
FREQUENCY ON THE PUMP VARIABLE SPEED
40350 (1) =Z11XAM02WP470-WP501 DRIVE.
3" 2" 2"
10420 7370 5120 7. FOR INSTRUMENTATION AND HEATING
WP320-WP501 REFER TO D&ID DRAWINGS
2"
CHILLED WATER (MAIN RETURN)
6720
WP420-WP501 #HOW02=Z11XAM01&MFB501.
FROM MAIN DECK
WP401-WP202
#HOW02=Z11XAM02&MFB801/004
(7) #HOW02=Z11XAM02&MFB801/004
WP301-WP202
BATTERY LV LV BATTERY
8. FOR DETAIL P&ID, PLEASE REFER TO
VENDOR'S DOCUMENT
CHILLED WATER (MAIN SUPPLY)
TO MAIN DECK
ROOM 1 ROOM 1 ROOM 2 ROOM 2 #HOW02=Z11XAM02&MFB801
4"
3" 33630
CHILLED WATER (MAIN RETURN)
26200 1.5"
FROM ROOF
WP401-WP801 2010
#HOW02=Z11XAM02&MFB801/001
(5) #HOW02=Z11XAM02&MFB801/001
WP301-WP801 TP17 TP18 TP23 TP24
1.5" 1.5" 1.5" 1.5"
CHILLED WATER (MAIN SUPPLY) 3050 3050 3110 3110
FAN COIL UNIT FAN COIL UNIT
TO ROOF
2" =Z11XAM02EZ203-EZ501 =Z11XAM02EZ204-EZ501
CHILLED WATER (MAIN RETURN) 7430
TP11 TP12 TP14 TP15 TP29 TP30 TP32 TP33
FROM MAIN DECK
WP401-WP201 TP19 TP25
#HOW02=Z11XAM02&MFB501/004
(6) #HOW02=Z11XAM02&MFB801/004
WP301-WP201
FAN COIL UNIT
=Z11XAM02EZ102-EZ501
FAN COIL UNIT
=Z11XAM02EZ202-EZ501
FAN COIL UNIT
=Z11XAM02EZ105-EZ501
FAN COIL UNIT
=Z11XAM02EZ205-EZ501
1.5" 1.5"
CHILLED WATER (MAIN SUPPLY)
TO MAIN DECK 2250 2010 TP34
TP13 TP16 TP31
TP20 TP21
TP26 TP27
FAN COIL UNIT
=Z11XAM02EZ103-EZ501 FAN COIL UNIT
=Z11XAM02EZ104-EZ501
TP22
C&C C&C TP28
ROOM 1 ROOM 2
TRANSFORMER ROOM 6 TRANSFORMER ROOM 4 TRANSFORMER ROOM 2

TRANSFORMER ROOM 5 TRANSFORMER ROOM 3 TRANSFORMER ROOM 1

C01 2-SEPT-19 NG.H HAN.H ISSUED FOR INFORMATION (IFI)


A02 30-MAY-19 NG.H HAN.H RE-ISSUED FOR EWVIEW (IFR)
A01 27-MAY-19 NG.H HAN.H ISSUED FOR REVIEW (IFR)
P01 01-APR-19 NG.H HAN.H INTER DISCIPLINE CHECK (IDC)
Rev. Date Accep. Appr. Description
Drawn by Accepted Approved
01-APR-19 LSL 01-APR-19 NG.H 01-APR-19 HAN.H
Scale Size Ørsted Document No.
NTS A3 00553992
HV SHUNT ROOM 3 EAT ROOM 3 HV SHUNT ROOM 2 HV SHUNT ROOM 1 EAT ROOM 1 Supplier Supplier Document No.
Sembcorp Marine Offshore Platforms Pte. Ltd. N/A

sembcorp
marine
Kraftværksvej 53 - 7000 Fredericia - Denmark
Tel. +45 9955 1111
www.orsted.dk

Horn Sea Wind Farm 02


OFFSHORE SUBSTATION
P&ID COOLING PIPE AND INSTRUMENT DIAGRAMS
- MEZZANINE DECKS
RDS-PP code Rev.:
#HOW02=Z11XAM02&MFB501/003 C01
This unpublished drawing is not available to the public and must not be used, copied or handed over to any third party or otherwise disposed of without DONG Energy's expressed permission in writing
NOTES:
PIPING DISTRIBUTION - OSS - MAIN DECK 1. MOTORIZED VALVES SHALL BE WITH
POSITION INDICATORS TO MONITOR
OPEN/CLOSED POSITIONS.

2. AIR SEPARATOR SHALL DE-AERATE THE


BUFFER VESSEL.
(7) 3. REMOVABLE PIPE SPOOL FOR BASKET
STRAINER INSTALLATION DURING
COMMISSIONING.

4. AIR SEPARATOR SHALL BE INSTALLED AS


HIGH AS POSSIBLE.

5. CONTROL VALVE FOR CONDENSING


PRESSURE CONTROL DURING SYSTEM
STARTUP.

6. BYPASS PIPE FOR ACHIEVING A MINIMUM


2"
2" CONTINUOUS FLOW AT THE LOWEST
6720 4550 FREQUENCY ON THE PUMP VARIABLE SPEED
WP330-WP201 DRIVE.
(6) WP430-WP201
(3)
7. FOR INSTRUMENTATION AND HEATING
REFER TO D&ID DRAWINGS
MV GIS ROOM 3 MV GIS ROOM 2 MV GIS ROOM 1 #HOW02=Z11XAM01&MFB501.

8. FOR DETAIL P&ID, PLEASE REFER TO


VENDOR'S DOCUMENT
#HOW02=Z11XAM02&MFB801

1.5" 1.5" 1.5"


2170 2360 2190

TP35 TP36 TP38 TP39 TP41 TP42

FAN COIL UNIT FAN COIL UNIT FAN COIL UNIT


=Z11XAM02EZ108-EZ201 =Z11XAM02EZ107-EZ201 =Z11XAM02EZ106-EZ201

TP37 TP40 TP43

TRANSFORMER ROOM 6 TRANSFORMER ROOM 4 TRANSFORMER ROOM 2

TRANSFORMER ROOM 5 TRANSFORMER ROOM 3 TRANSFORMER ROOM 1

HV GIS ROOM 3 HV GIS ROOM 2 HV GIS ROOM 1 C&C ROOM 3 (US213)


a TP55
TP46 TP49
TP52
FAN COIL UNIT
FAN COIL UNIT FAN COIL UNIT
FAN COIL UNIT =Z11XAM02EZ109-EZ201 C01 2-SEPT-19 NG.H HAN.H ISSUED FOR INFORMATION (IFI)
=Z11XAM02EZ112-EZ201 =Z11XAM02EZ111-EZ201
2" =Z11XAM02EZ110-EZ201 1" 1"
A02 30-MAY-19 NG.H HAN.H RE-ISSUED FOR EWVIEW (IFR)
TP54 TP53 A01 27-MAY-19 NG.H HAN.H ISSUED FOR REVIEW (IFR)
7430 TP45 TP44 TP48 TP47 1110 1110
TP51 TP50 P01 01-APR-19 NG.H HAN.H INTER DISCIPLINE CHECK (IDC)
Rev. Date Accep. Appr. Description
Drawn by Accepted Approved
1.5" 1.5" TP58
1.5" 01-APR-19 LSL 01-APR-19 NG.H 01-APR-19 HAN.H
2120 2130 Scale Size Ørsted Document No.
2070 FAN COIL UNIT
NTS A3 00553992
=Z11XAM02EZ209-EZ201 Supplier Supplier Document No.
Sembcorp Marine Offshore Platforms Pte. Ltd. N/A
TP56 TP57

sembcorp
2" 1.5"
WP381-WP201
marine
5310 3240 e WP481-WP201
Kraftværksvej 53 - 7000 Fredericia - Denmark
Tel. +45 9955 1111
www.orsted.dk

Horn Sea Wind Farm 02


OFFSHORE SUBSTATION
P&ID COOLING PIPE AND INSTRUMENT DIAGRAMS
- MAIN DECK
RDS-PP code Rev.:
#HOW02=Z11XAM02&MFB501/004 C01
This unpublished drawing is not available to the public and must not be used, copied or handed over to any third party or otherwise disposed of without DONG Energy's expressed permission in writing
NOTES:

PIPING DISTRIBUTION - OSS - UTILITY DECK 1. MOTORIZED VALVES SHALL BE WITH


POSITION INDICATORS TO MONITOR
OPEN/CLOSED POSITIONS.

2. AIR SEPARATOR SHALL DE-AERATE THE

FROM UTILITY DECK- LV ROOM 1,2 & C&C ROOM


#HOW02=Z01XAM02&MFB501/002

#HOW02=Z01XAM02&MFB501/002
BUFFER VESSEL.

#HOW02=Z01XAM02&MFB501/002

#HOW02=Z01XAM02&MFB501/002
TO UTILITY DECK-LV ROOM 1,2& C&C ROOM

CHILLED WATER (REDUNDANT RETURN)


CHILLED WATER (REDUNDANT SUPPLY)
3. REMOVABLE PIPE SPOOL FOR BASKET

CHILLED WATER (MAIN RETURN)


STRAINER INSTALLATION DURING

CHILLED WATER (MAIN SUPPLY)


COMMISSIONING.

FROM UTILITY DECK


4. AIR SEPARATOR SHALL BE INSTALLED AS
HIGH AS POSSIBLE.

TO UTILITY DECK
5. CONTROL VALVE FOR CONDENSING
PRESSURE CONTROL DURING SYSTEM
STARTUP.
6"
6. BYPASS PIPE FOR ACHIEVING A MINIMUM
52230
3" CONTINUOUS FLOW AT THE LOWEST
11530 FREQUENCY ON THE PUMP VARIABLE SPEED
DRIVE.
=Z01XAM02WP407-WP601
7. FOR INSTRUMENTATION AND HEATING
TP59 TP60 TP61 TP62
REFER TO D&ID DRAWINGS
#HOW02=Z11XAM01&MFB501.
TP68 TP89 PUMP 5 =Z11XAM02GP005-GP601
PUMP 3 =Z11XAM02GP003-GP601 PUMP 6 =Z11XAM02GP006-GP601 8. FOR DETAIL P&ID, PLEASE REFER TO
PUMP 4 =Z11XAM02GP004-GP601 VENDOR'S DOCUMENT
BUFFER TANK =Z11XAM02CM002-CM601 #HOW02=Z11XAM02&MFB801
EXPANSION TANK =Z11XAM02CM003-CM601 TP90
AIR SEPARATOR 2 =Z11XAM02FL002-FL601
TP69
=Z01XAM02WP408-WP601
4"
4"
52230
52230
TP67

=Z01XAM02WP455-WP601
=Z01XAM02WP305-WP601
=Z01XAM02WP355-WP601

TP71 TP72 TP73 TP74

CHILLER UNIT 1- CHILLER UNIT 2-


=Z11XAM02EZ001-EZ601 =Z11XAM02EZ002-EZ601

TP75 TP76 TP77 TP78

=Z01XAM02WP409-WP601
=Z01XAM02WP306-WP601 =Z01XAM02WP456-WP601
C01 2-SEPT-19 NG.H HAN.H ISSUED FOR INFORMATION (IFI)

=Z01XAM02WP356-WP601 A02 30-MAY-19 NG.H HAN.H RE-ISSUED FOR EWVIEW (IFR)


A01 27-MAY-19 NG.H HAN.H ISSUED FOR REVIEW (IFR)
6"
P01 01-APR-19 NG.H HAN.H INTER DISCIPLINE CHECK (IDC)
88620 Rev. Date Accep. Appr. Description
TP82 TP84 Drawn by Accepted Approved
01-APR-19 LSL 01-APR-19 NG.H 01-APR-19 HAN.H
=Z01XAM02WP457-WP801 Scale Size Ørsted Document No.
PUMP 1- =Z01XAM02GP001-GP601 DRY COOLER 1-
TP63 TP88
NTS A3 00553992

PUMP 2- =Z01XAM02GP002-GP601 =Z01XAM02WP359-WP801 =Z11XAM02EZ011-EZ801 Supplier


Sembcorp Marine Offshore Platforms Pte. Ltd.
Supplier Document No.
N/A

EXPANSION TANK- =Z01XAM02CM001-CM601 TP64 TP87


=Z01XAM02WP413-WP801 sembcorp
AIR SEPARATOR 1 - =Z01XAM02FL001-FL601
TP65 TP86 DRY COOLER 2- marine
=Z01XAM02WP308-WP801 =Z11XAM02EZ012-EZ801
TP66 TP85 Kraftværksvej 53 - 7000 Fredericia - Denmark
Tel. +45 9955 1111
www.orsted.dk

Horn Sea Wind Farm 02


OFFSHORE SUBSTATION
P&ID COOLING PIPE AND INSTRUMENT DIAGRAMS
- UTILITY DECK ( HVA/C ROOM)
RDS-PP code Rev.:
#HOW02=Z11XAM02&MFB501/005 C01
This unpublished drawing is not available to the public and must not be used, copied or handed over to any third party or otherwise disposed of without DONG Energy's expressed permission in writing

You might also like