0% found this document useful (0 votes)
36 views4 pages

Analysis of Rate - FPS

YYBioball

Uploaded by

Thiha Kyaw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
36 views4 pages

Analysis of Rate - FPS

YYBioball

Uploaded by

Thiha Kyaw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 4
“eters 1 Site Cleaning ‘Staking Works for 2 Preparation of Foundation arthwork ‘excavation in Hard 9"thk; Hardeore ‘work ‘Sand Filling Work 6 _ 1:3:6 coment Concrete Work by Machine 41:2:4 Cement concrete Work by Machine Dismantling Formwork For 100 set Worker For 1o0text0ott Timber wie nal Surveyor Carpenter For 100cu-t Worker For 100 cu 6°39" (Boulder) Worker For 100 Cute Sand Worker For 100cu-e Cement Sand Coarse Aggregate Fuel Mason Worker Machine Driver For 1odeu-t Cement Sand Coarse Aggregate Fuel Nason Worker Machine Driver For 100sa-fe Timbers (2 tes) Playwood Nat Carpenter Worker For 1005q-ft Worker rar [sooo ]sar] 3 Enithwork Excavation Work CE torent scien Se Hardcore Werk Eillina Work carb tng + Work ‘4:3:6 Cement Concrete Work SR cance toby 1 Man-dey handel & haty os hms 1:2:4 Coment %2 eR concrete Work by 1 Man-day: Handimix 8 Man-car o's Naneay noma at is Se Ye Formwork 4 Nanay 2 Mandar 2 Mansday sepa of ead at For 100eu- cE Worker Ton Tay For 100Cut Earth (35 % Compaction) “135 Gare Worker 2) Man-day For Looeu- Cement 1440 B Sard 48 cut Conrse aggregate 98 cut Nason 1 Man-dey Worker 8 Men-day For 1ooeu-t Cement sora Coarse Aggregate Mason Worker For 100eu-t Toole] Jungle woods (3 Times) Of ‘5mm ply wood 1.15 sheet nail 083 ves Carpenter 4 Man-day Worker 2 Men-day ° 10 a 2 Reinforcing Work With for (CWT) Brick work with 1:3 ‘Cement Mortar (ist ‘Clase Brick) Plastering with 1:3 ‘Cement Mortar (2/2" thi) 44/2"thle reinforced brick ‘wal in cement mortar 1:3 reinforced at avery ‘ath course 4.4/2"thk, Cement Concrete 1:2:4 Floor Using River Shingle Aggregate 11/2" thi 12:4 Cament Concrete Floor Topping 6°x6" Glazed Tiles Flooring Laid in coment Mortar 1:3 for 10cut Rear bi Reinforcing Work Stee ier With for icTon) Worker ‘Brick Work For tooeufe in 3 ceneié 780 Brick work with 1:3, Send 26 cot Cement Mortar (lst nck 1350 ant "Stee ses Nason 4 Nenaor omer @ Noraar Plastering Work For soos n 3 eNO TE] coment 150° Plastering work Sand 5 cxf with 4:4 Cement Nason 2 Monday Mortar (4/2" th) Worker 2 Maneday Malling Work For 100sq-fein 1-3 cf Too] (Kinet 21/2" wide) “EIS” FE 3°0h; reinforced Brexs"x493/8%2-3/- $50 no brick wall in Cement 257 (b—_camantmortar 1:3 Sand 0 telnforced stevery Nasons 2 ‘Sth course Workers 3 lensing Wark For 100e9- 12:6 {700 TE] Cement 77 Sand 1725 Gut 4 4/2°th; Cement Stone or Shingle gs Concrete Nason Floor Using River Workers Shingle Aggregate Carpenter 0.2 Manaay Batons Sundies 2.5 Cunt For 100 :2:4 sand 575 Sut cement Conereta Sime Ve'to3/e" as Go Camantce fron 255 Hndoy vores ve aw aay For 1008q-ft in 1:3 Caf_too [fe _] Fie gated eC I ye oer 2 OTR aang" ctazed Send Gn tion 23 Monsey venere 2 Nenser = 2 For 10Qcu-R in 1:4 0M 630 Cerent Sena 28 crt brick 185 art Mason 4 an-day ‘orer & tan-aay For 100sa-ftini:acm [ooye _) Cement 13 bb Som Ss cut bak tock Nason 2 anday For 100s in 1:3 usm Gemet 22" nie) 105 RA Snagresa/e'na-2/4" 350 no Coment ie tb Sow cote Masons 15: Mansday Worders 2 Monday For Loos in 1:3:6 cone 100] coment 540. Sand 18 cuft Stone or Shingle agg; 36 Cut Mason 1 Man-day Workers 6 Man-day Carpenter 0.2 wan-day Batons 8 Sundries 2.35 Cute For 100sq- in 1:2:4 cone TOO] ] Cement 345 Sand 75 Coft Stone agg; 1/4't03/4" 15. Cut Mazon 0.75 Man-day Workers 2° wan-day For 100sq-t in 1:3 Comer T00]——_] 12x12" glazed tes 11 NB TIOTr Cement 180 Coloured Cement Mason 2.5 Man-day Workers 2 Man-day “4 Gypsum Board (or) Plaster Board Ceiling with 2°x1" "x2" PKD CChowket Work 4.4/2" thk; Teak Panelled Door windows of any Description Fixing UPVC sliding Window with PVC Frame Incl Necessary Accessories fer 56s wih coo FEET] 22" cement board 70.5 q PKD Jost PKD Jost 2°35" Teak Beading 1.5" Wood Screw Nall Carpenter ‘ceiling Work, 3 Plywood Rae tes complete with Cor Ton yetxt/2" eeling G03 fon joists at 2'contor 18 Doz 042 No 7 Ne fo 256 20-4 wih ov ETS] 8'x4! Gypsum or plast 2°31" Aluminium Fran 1°31" aluminum Frat Suspender (3/16" Concrete Nai Hold Anchor Serew Putty Poweiar 2° dant Tape Head Worker Worker Fixing Plaster Cornice For 100 R442") 4°32" PRD. Nail Bracket Xmet Carpenter For 24 sqft 5 5° Hinge "Tower Bolt 5" siding Bote 6° Handle 1.5" Wood Screw Carpenter For 24 sqft Carpanter For #0" Chowket Frome Window Leat Frame Liner 0.36" (4mm; Clear Stican Steel Ser Wall Pag Head Worker Worker 339 res 2 Ib 18 Nos 100 Rt 4 Not 5%x2" PRD Cchowket Work Goer OS Ran-day 7 Rt 25 Rte 25 Rete ost 1 Manday Far 256 sat with 3 aly Piywood (3p) Scantling 1/2" beadings ai Wood Screws Carpenters For 100 RR orice Pury Head Worker Worker For 100R-R (5°32") 552" PRD il Bracket Xmet Carpenter Germ 304 Cute 23 Out 3 tbe 2 Gross 75 Man-day oo Too RR 5b 1 Man-day 2 Mancday Re] 3 CHET 2b 18 Nes 100 RR 6 Nee for 59 cate For 500 Rett Roof Framing work Tiner (10% Wastage 53 GFT Gr olon (5% waste) 525 RR ‘with timber Nal pes Steal res 10. Man-day Carpenter anvingen Woe 25 Nan For 09 se(7) HOTS], (MANORONS For 100 sa-t Roofing of 32G.CGLsheuts | SRE ghar) Cl Ta, Vangaor ratte Cay “TSE NE aacecrsheets Girosingtais, 13 ub Meefmaowith 294" Io ate ce 1.76 Gift Supplied and Ped Carpenter 15 Manday Rotem ond $02" ca" common rafters 342 Cot woner 1 Nader ‘wrenstsend sakes 2 Bding wine ts Corpenters 2 Manse Workers 3 vensey 15 rnongatcumainsnne F220 Stet Dang Mange Fr S008. (Oye)

You might also like