CRRC-ASTS-NMML1-PC-F-736 Kinematic Envelope Calculation Specification (Detailed) - 05 (Without Any Color) PDF
CRRC-ASTS-NMML1-PC-F-736 Kinematic Envelope Calculation Specification (Detailed) - 05 (Without Any Color) PDF
Dear Sir,
We are pleased to send you the Calculation for Kinematic Envelope (Detailed)-05 for
LBG’s review and approval based on comments provided by LOT LBG/1S2/01696.
Attachment list:
Yours faithfully,
Project Manager
1 of 1
Attachment 1:
NMML1-RST-8-B-0027
Calculation for Kinematic Envelope
(Detailed)-05
Navi Mumbai Metro Line 1
AnTaCs
Detailed Design Document
Document Title:
Calculation for Kinematic Envelope (Detailed)-05
Modified as per
05 February.04,2016 Xia Mengyu Lu Zhilong Li Yunlong LBG/1S2/01696
Comments
Table of contents
1 GENERAL .................................................................................................................... 9
1.1 Purpose ................................................................................................................... 9
1.2 Introduction ............................................................................................................. 9
2 CALCULATION BASIS ................................................................................................. 9
2.1 Formation Type ....................................................................................................... 9
2.2 Technical Parameters ............................................................................................. 9
2.3 Technical Requirement ........................................................................................... 9
2.4 Calculation Standard ............................................................................................. 11
3 CALCULATION PARAMETERS AND WORKING CONDITIONS .............................. 11
3.1 Calculation Parameters ......................................................................................... 11
4 CALCULATION NORM............................................................................................... 13
4.1 Kinematic Envelope............................................................................................... 13
4.2 Extra Clearance For Platform KE in Curved Track ................................................ 15
4.3 Calculation Method................................................................................................ 15
4.4 Calculation Section................................................................................................ 18
4.5 Calculation Requirements ..................................................................................... 18
4.6 Working Conditions ............................................................................................... 19
5 CALCULATION RESULT ........................................................................................... 20
6 CONCLUSION .......................................................................................................... 212
6.1 Maximum KE of Rolling Stock ............................................................................. 212
6.2 Maximum Speed Passing through the Platform .................................................. 213
6.3 Maximum Vehicle Speed Passing through the KE for Pantograph with Wind Speed
of 125km/h ....................................................................................................................... 214
6.4 Pantograph Selection .......................................................................................... 215
Figure 14 Section F-F for Working Condition 1 for Normal KE .......................................... 27
Figure 15 Section G-G for Working Condition 1 for Normal KE ......................................... 28
Figure 16 Section A-A for Working Condition 2 for Normal KE .......................................... 29
Figure 17 Section B-B for Working Condition 2 for Normal KE .......................................... 30
Figure 18 Section C-C for Working Condition 2 for Normal KE.......................................... 31
Figure 19 Section D-D for Working Condition 2 for Normal KE.......................................... 32
Figure 20 Section E-E for Working Condition 2 for Normal KE .......................................... 33
Figure 21 Section F-F for Working Condition 2 for Normal KE .......................................... 34
Figure 22 Section G-G for Working Condition 2 for Normal KE ......................................... 35
Figure 23 Section A-A for Working Condition 3 for Normal KE .......................................... 36
Figure 24 Section B-B for Working Condition 3 for Normal KE .......................................... 37
Figure 25 Section C-C for Working Condition 3 for Normal KE.......................................... 38
Figure 26 Section D-D for Working Condition 3 for Normal KE.......................................... 39
Figure 27 Section E-E for Working Condition 3 for Normal KE .......................................... 40
Figure 28 Section F-F for Working Condition 3 for Normal KE .......................................... 41
Figure 29 Section G-G for Working Condition 3 for Normal KE ......................................... 42
Figure 30 Section A-A for Working Condition 4 for Normal KE .......................................... 43
Figure 31 Section B-B for Working Condition 4 for Normal KE .......................................... 44
Figure 32 Section C-C for Working Condition 4 for Normal KE.......................................... 45
Figure 33 Section D-D for Working Condition 4 for Normal KE.......................................... 46
Figure 34 Section E-E for Working Condition 4 for Normal KE .......................................... 47
Figure 35 Section F-F for Working Condition 4 for Normal KE .......................................... 48
Figure 36 Section G-G for Working Condition 4 for Normal KE ......................................... 49
Figure 37 Section A-A for Working Condition 5 for Normal KE .......................................... 50
Figure 38 Section B-B for Working Condition 5 for Normal KE .......................................... 51
Figure 39 Section C-C for Working Condition 5 for Normal KE.......................................... 52
Figure 40 Section D-D for Working Condition 5 for Normal KE.......................................... 53
Figure 41 Section E-E for Working Condition 5 for Normal KE .......................................... 54
Figure 42 Section F-F for Working Condition 5 for Normal KE .......................................... 55
Figure 43 Section G-G for Working Condition 5 for Normal KE ......................................... 56
Figure 44 Section A-A for Working Condition 6 for Normal KE .......................................... 57
Figure 45 Section B-B for Working Condition 6 for Normal KE .......................................... 58
Figure 46 Section C-C for Working Condition 6 for Normal KE.......................................... 59
Figure 47 Section D-D for Working Condition 6 for Normal KE.......................................... 60
Figure 48 Section E-E for Working Condition 6 for Normal KE .......................................... 61
Figure 49 Section F-F for Working Condition 6 for Normal KE .......................................... 62
Figure 50 Section G-G for Working Condition 6 for Normal KE ......................................... 63
Figure 51 Section A-A for Working Condition 7 for Normal KE .......................................... 64
Figure 52 Section B-B for Working Condition 7 for Normal KE .......................................... 65
Figure 53 Section C-C for Working Condition 7 for Normal KE.......................................... 66
Figure 54 Section D-D for Working Condition 7 for Normal KE.......................................... 67
Figure 55 Section E-E for Working Condition 7 for Normal KE .......................................... 68
Figure 56 Section F-F for Working Condition 7 for Normal KE .......................................... 69
Figure 57 Section G-G for Working Condition 7 for Normal KE ......................................... 70
Figure 58 Section A-A for Working Condition 8 for Normal KE .......................................... 71
Figure 59 Section B-B for Working Condition 8 for Normal KE .......................................... 72
Figure 60 Section C-C for Working Condition 8 for Normal KE.......................................... 73
Figure 61 Section D-D for Working Condition 8 for Normal KE.......................................... 74
Document Number NMML1-RST-8-B-0027
Page 4 of 216
Revision 05
Navi Mumbai Metro Line 1
AnTaCs
Detailed Design Document
Figure 62 Section E-E for Working Condition 8 for Normal KE .......................................... 75
Figure 63 Section F-F for Working Condition 8 for Normal KE .......................................... 76
Figure 64 Section G-G for Working Condition 8 for Normal KE ......................................... 77
Figure 65 Section A-A for Working Condition 9 for Normal KE .......................................... 78
Figure 66 Section B-B for Working Condition 9 for Normal KE .......................................... 79
Figure 67 Section C-C for Working Condition 9 for Normal KE.......................................... 80
Figure 68 Section D-D for Working Condition 9 for Normal KE.......................................... 81
Figure 69 Section E-E for Working Condition 9 for Normal KE .......................................... 82
Figure 70 Section F-F for Working Condition 9 for Normal KE .......................................... 83
Figure 71 Section G-G for Working Condition 9 for Normal KE ......................................... 84
Figure 72 Section A-A for Working Condition 10 for Normal KE ........................................ 85
Figure 73 Section B-B for Working Condition 10 for Normal KE ........................................ 86
Figure 74 Section C-C for Working Condition 10 for Normal KE........................................ 87
Figure 75 Section D-D for Working Condition 10 for Normal KE........................................ 88
Figure 76 Section E-E for Working Condition 10 for Normal KE ........................................ 89
Figure 77 Section F-F for Working Condition 10 for Normal KE ........................................ 90
Figure 78 Section G-G for Working Condition 10 for Normal KE ....................................... 91
Figure 79 Section A-A for Working Condition 11 for Normal KE ........................................ 92
Figure 80 Section B-B for Working Condition 11 for Normal KE ........................................ 93
Figure 81 Section C-C for Working Condition 11 for Normal KE........................................ 94
Figure 82 Section D-D for Working Condition 11 for Normal KE........................................ 95
Figure 83 Section E-E for Working Condition 11 for Normal KE ........................................ 96
Figure 84 Section F-F for Working Condition 11 for Normal KE ........................................ 97
Figure 85 Section G-G for Working Condition 11 for Normal KE ....................................... 98
Figure 86 Section A-A for Working Condition 1 for Platform KE ...................................... 100
Figure 87 Section B-B for Working Condition 1 for Platform KE ...................................... 101
Figure 88 Section C-C for Working Condition 1 for Platform KE ...................................... 102
Figure 89 Section D-D for Working Condition 1 for Platform KE ...................................... 103
Figure 90 Section E-E for Working Condition 1 for Platform KE ...................................... 104
Figure 91 Section F-F for Working Condition 1 for Platform KE....................................... 105
Figure 92 Section G-G for Working Condition 1 for Platform KE ..................................... 106
Figure 93 Section A-A for Working Condition 2 for Platform KE ...................................... 107
Figure 94 Section B-B for Working Condition 2 for Platform KE ...................................... 108
Figure 95 Section C-C for Working Condition 2 for Platform KE ...................................... 109
Figure 96 Section D-D for Working Condition 2 for Platform KE ...................................... 110
Figure 97 Section E-E for Working Condition 2 for Platform KE ...................................... 111
Figure 98 Section F-F for Working Condition 2 for Platform KE....................................... 112
Figure 99 Section G-G for Working Condition 2 for Platform KE ..................................... 113
Figure 100 Section A-A for Working Condition 3 for Platform KE .................................... 114
Figure 101 Section B-B for Working Condition 3 for Platform KE .................................... 115
Figure 102 Section C-C for Working Condition 3 for Platform KE .................................... 116
Figure 103 Section D-D for Working Condition 3 for Platform KE .................................... 117
Figure 104 Section E-E for Working Condition 3 for Platform KE .................................... 118
Figure 105 Section F-F for Working Condition 3 for Platform KE..................................... 119
Figure 106 Section G-G for Working Condition 3 for Platform KE ................................... 120
Figure 107 Section A-A for Working Condition 4 for Platform KE .................................... 121
Figure 108 Section B-B for Working Condition 4 for Platform KE .................................... 122
Figure 109 Section C-C for Working Condition 4 for Platform KE .................................... 123
Document Number NMML1-RST-8-B-0027
Page 5 of 216
Revision 05
Navi Mumbai Metro Line 1
AnTaCs
Detailed Design Document
Figure 110 Section D-D for Working Condition 5 for Platform KE .................................... 124
Figure 111 Section E-E for Working Condition 4 for Platform KE .................................... 125
Figure 112 Section F-F for Working Condition 4 for Platform KE..................................... 126
Figure 113 Section G-G for Working Condition 5 for Platform KE ................................... 127
Figure 114 Section A-A for Working Condition 5 for Platform KE .................................... 128
Figure 115 Section B-B for Working Condition 5 for Platform KE .................................... 129
Figure 116 Section C-C for Working Condition 5 for Platform KE .................................... 130
Figure 117 Section D-D for Working Condition 5 for Platform KE .................................... 131
Figure 118 Section E-E for Working Condition 5 for Platform KE .................................... 132
Figure 119 Section F-F for Working Condition 5 for Platform KE..................................... 133
Figure 120 Section G-G for Working Condition 5 for Platform KE ................................... 134
Figure 121 Section A-A for Working Condition 6 for Platform KE .................................... 135
Figure 122 Section B-B for Working Condition 6 for Platform KE .................................... 136
Figure 123 Section C-C for Working Condition 6 for Platform KE .................................... 137
Figure 124 Section D-D for Working Condition 6 for Platform KE .................................... 138
Figure 125 Section E-E for Working Condition 6 for Platform KE .................................... 139
Figure 126 Section F-F for Working Condition 6 for Platform KE..................................... 140
Figure 127 Section G-G for Working Condition 6 for Platform KE ................................... 141
Figure 128 Section A-A for Working Condition 7 for Platform KE .................................... 142
Figure 129 Section B-B for Working Condition 7 for Platform KE .................................... 143
Figure 130 Section C-C for Working Condition 7 for Platform KE .................................... 144
Figure 131 Section D-D for Working Condition 7 for Platform KE .................................... 145
Figure 132 Section E-E for Working Condition 7 for Platform KE .................................... 146
Figure 133 Section F-F for Working Condition 7 for Platform KE..................................... 147
Figure 134 Section G-G for Working Condition 7 for Platform KE ................................... 148
Figure 135 Section A-A for Working Condition 8 for Platform KE ................................... 149
Figure 136 Section B-B for Working Condition 8 for Platform KE .................................... 150
Figure 137 Section C-C for Working Condition 8 for Platform KE .................................... 151
Figure 138 Section D-D for Working Condition 8 for Platform KE .................................... 152
Figure 139 Section E-E for Working Condition 8 for Platform KE .................................... 153
Figure 140 Section F-F for Working Condition 8 for Platform KE..................................... 154
Figure 141 Section G-G for Working Condition 8 for Platform KE ................................... 155
Figure 142 Section A-A for Working Condition 9 for Platform KE .................................... 156
Figure 143 Section B-B for Working Condition 9 for Platform KE .................................... 157
Figure 144 Section C-C for Working Condition 9 for Platform KE .................................... 158
Figure 145 Section D-D for Working Condition 9 for Platform KE .................................... 159
Figure 146 Section E-E for Working Condition 9 for Platform KE .................................... 160
Figure 147 Section F-F for Working Condition 9 for Platform KE..................................... 161
Figure 148 Section G-G for Working Condition 9 for Platform KE ................................... 162
Figure 149 Section A-A for Working Condition 10 for Platform KE .................................. 163
Figure 150 Section B-B for Working Condition 10 for Platform KE .................................. 164
Figure 151 Section C-C for Working Condition 10 for Platform KE .................................. 165
Figure 152 Section D-D for Working Condition 10 for Platform KE .................................. 166
Figure 153 Section E-E for Working Condition 10 for Platform KE .................................. 167
Figure 154 Section F-F for Working Condition 10 for Platform KE................................... 168
Figure 155 Section G-G for Working Condition 10 for Platform KE ................................. 169
Figure 156 Section A-A for Working Condition 11 for Platform KE .................................. 170
Figure 157 Section B-B for Working Condition 11 for Platform KE .................................. 171
Document Number NMML1-RST-8-B-0027
Page 6 of 216
Revision 05
Navi Mumbai Metro Line 1
AnTaCs
Detailed Design Document
Figure 158 Section C-C for Working Condition 11 for Platform KE .................................. 172
Figure 159 Section D-D for Working Condition 11 for Platform KE .................................. 173
Figure 160 Section E-E for Working Condition 11 for Platform KE .................................. 174
Figure 161 Section F-F for Working Condition 11 for Platform KE................................... 175
Figure 162 Section G-G for Working Condition 11 for Platform KE ................................. 176
Figure 163 Section A-A for Working Condition 12 for Platform KE .................................. 177
Figure 164 Section B-B for Working Condition 12 for Platform KE .................................. 178
Figure 165 Section C-C for Working Condition 12 for Platform KE .................................. 179
Figure 166 Section D-D for Working Condition 12 for Platform KE .................................. 180
Figure 167 Section E-E for Working Condition 12 for Platform KE .................................. 181
Figure 168 Section F-F for Working Condition 12 for Platform KE................................... 182
Figure 169 Section G-G for Working Condition 12 for Platform KE ................................. 183
Figure 170 Section A-A for Working Condition 13 for Platform KE .................................. 184
Figure 171 Section B-B for Working Condition 13 for Platform KE .................................. 185
Figure 172 Section C-C for Working Condition 13 for Platform KE .................................. 186
Figure 173 Section D-D for Working Condition 13 for Platform KE .................................. 187
Figure 174 Section E-E for Working Condition 13 for Platform KE .................................. 188
Figure 175 Section F-F for Working Condition 13 for Platform KE................................... 189
Figure 176 Section G-G for Working Condition 13 for Platform KE ................................. 190
Figure 177 Section A-A for Working Condition 14 for Platform KE .................................. 191
Figure 178 Section B-B for Working Condition 14 for Platform KE .................................. 192
Figure 179 Section C-C for Working Condition 14 for Platform KE .................................. 193
Figure 180 Section D-D for Working Condition 14 for Platform KE .................................. 194
Figure 181 Section E-E for Working Condition 14 for Platform KE .................................. 195
Figure 182 Section F-F for Working Condition 14 for Platform KE................................... 196
Figure 183 Section G-G for Working Condition 14 for Platform KE ................................. 197
Figure 184 Section A-A for Working Condition 15 for Platform KE .................................. 198
Figure 185 Section B-B for Working Condition 15 for Platform KE .................................. 199
Figure 186 Section C-C for Working Condition 15 for Platform KE .................................. 200
Figure 187 Section D-D for Working Condition 15 for Platform KE .................................. 201
Figure 188 Section E-E for Working Condition 15 for Platform KE .................................. 202
Figure 189 Section F-F for Working Condition 15 for Platform KE................................... 203
Figure 190 Section G-G for Working Condition 15 for Platform KE ................................. 204
Figure 191 Section A-A for Working Condition 16 for Platform KE ................................. 205
Figure 192 Section B-B for Working Condition 16 for Platform KE .................................. 206
Figure 193 Section C-C for Working Condition 16 for Platform KE .................................. 207
Figure 194 Section D-D for Working Condition 16 for Platform KE .................................. 208
Figure 195 Section E-E for Working Condition 16 for Platform KE .................................. 209
Figure 196 Section F-F for Working Condition 16 for Platform KE................................... 210
Figure 197 Section G-G for Working Condition 16 for Platform KE ................................. 211
Figure 198 Maximum KE of Rolling Stock........................................................................ 212
Figure 199 Maximum Kinematic Envelope for Vehicle Speed is 5km/h with Wind Speed of
125km/h ........................................................................................................................... 215
1 GENERAL
1.1 PURPOSE
This document provides the detailed calculation of kinematic envelope of NMML1 project
in accordance with the Kinematic Envelope (KE) on level tangent and curved track for
elevated section and depot areas given in the "Schedule of Dimensions-SOD" document in
Volume-V.
1.2 INTRODUCTION
The KE calculation has been done for level tangent and curve track for each type of car for
both inflated and deflated conditions of air springs taking into account all normal conditions
specified in the Technical Specification clauses 3.18.3(i) to 3.18.3(viii) inclusive, and any
one abnormal condition specified in the Technical Specification clause 3.18.3(ix) to
3.18.3(xi) inclusive.
2 CALCULATION BASIS
2.1 FORMATION TYPE
Abnormal conditions:
ix) Any combination of bogie air spring Comply
deflated.
x) Vehicle lateral and rolling Comply
movements due to wind forces with a
wind speed of 125 km/h on the Elevated
corridor.
xi) Account shall be taken of over- Comply
inflated air springs in calculating the
vertical lift of the car body.
3.18.4 The Kinematic Envelope shall also be Comply
developed for various curves.
3.18.5 The Contractor shall submit detailed Comply
calculations for clearance between
platform edge and car body. The
calculations shall be done considering
the below parameters:
various train speeds from 30 km/h to 60 Comply
km/h
various combinations of wind speeds Comply
from 0 km/h to 80 km/h
both inflated and deflated secondary Comply
suspension
tangent track and curve track with 1000 Comply
m radius
3.18.6 The Contractor shall ensure that the Comply
cars conform to the Schedule of
Dimensions given in Volume-V
Table 1 Technical Requirements
4 CALCULATION NORM
4.1 KINEMATIC ENVELOPE
The Kinematic Envelopes given in Figures 2 and 3 are as per the Schedule of Dimensions
(SOD).
Figure 2 Normal KE
Figure 3 Platform KE
5 CALCULATION RESULT
The deflection and deviation angle of the vehicle in bogie centre calculated by the dynamic
calculation software are shown in the table below.
Vehicle Wind
No. Remarks Deflection Deviation angle
speed speed
1 80km/h 87km/h In normal condition 52mm 0.0355rad
2 80km/h 102km/h In normal condition 58mm 0.0416rad
3 90km/h 87km/h In normal condition 53mm 0.036rad
4 90km/h 102km/h In normal condition 59mm 0.0423rad
5 80km/h 60km/h Air spring deflated 49mm 0.03422rad
6 80km/h 60km/h Air spring inflated 47mm 0.03418rad
7 90km/h 125km/h 63mm 0.04985rad
Table 7 Deflection and Deviation Angles
The maximum kinematic envelope of each section in every working condition has been
imitated out as follow.
For Normal KE, the 11 working conditions have been calculated out as follows.
Working condition 1
The vehicle operated on tangent track in 80km/h with a wind speed of 87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 2
The vehicle operated on tangent track in 80km/h with a wind speed of 102km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 3
The vehicle operated on tangent track in 90km/h with a wind speed of 87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 4
The vehicle operated on tangent track in 90km/h with a wind speed of 102km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 5
The vehicle operated on tangent track in 80km/h with a wind speed of 60km/h when air
spring deflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 6
The vehicle operated on tangent track in 80km/h with a wind speed of 60km/h when air
spring inflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 7
The vehicle operated on tangent track in 90km/h with a wind speed of 125km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 8
The vehicle operated on tangent track in 80km/h with a wind speed of 102km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 9
The vehicle operated on tangent track in 90km/h with a wind speed of 102km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 10
The vehicle operated on tangent track in 80km/h with a wind speed of 60km/h when air
spring deflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 11
The vehicle operated on tangent track in 80km/h with a wind speed of 60km/h when air
spring inflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
For Platform KE, the tangent and curved track (R=1000m) working conditions (working
conditions 1 to 16) have been calculated in the following pages.
With reference to clause 4.2 and 4.4, for curved track (R=1000m), additional
clearances in Platform KE have been considered as per the following details:
Section A-A, C-C, D-D and G-G are beyond centre pivots of bogies, hence, additional
clearance of 33mm due to End Throw has been taken into consideration. Section B-B
and F-F are between centre pivots of bogies, hence, additional clearance of 29mm
due to Mid Throw has been taken into consideration. While Section E-E is on the
centre pivot, no extra clearance has been considered.
Working condition 1:
The vehicle operated on tangent track in 80km/h with a wind speed of 87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 2
The vehicle operated on tangent track in 90km/h with a wind speed of 87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 3
The vehicle operated on tangent track in 80km/h with a wind speed of 60km/h when air
spring deflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 4
The vehicle operated on tangent track in 80km/h with a wind speed of 60km/h when air
spring inflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 5
The vehicle operated on tangent track in 80km/h with a wind speed of 87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 6
The vehicle operated on tangent track in 90km/h with a wind speed of 87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 7
The vehicle operated on tangent track in 80km/h with a wind speed of 60km/h when air
spring deflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 8
The vehicle operated on tangent track in 80km/h with a wind speed of 60km/h when air
spring inflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 9
The vehicle operated on curved (R=1000m) track in 80km/h with a wind speed of
87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 10
The vehicle operated on curved (R=1000m) track in 90km/h with a wind speed of
87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 11
The vehicle operated on curved (R=1000m) track in 80km/h with a wind speed of
60km/h when air spring deflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 12
The vehicle operated on curved track in 80km/h with a wind speed of 60km/h when air
spring inflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 13
The vehicle operated on curved (R=1000m) track in 80km/h with a wind speed of
87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 14
The vehicle operated on curved (R=1000m) track in 90km/h with a wind speed of
87km/h.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 15
The vehicle operated on curved (R=1000m) track in 80km/h with a wind speed of
60km/h when air spring deflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
Working condition 16
The vehicle operated on curved (R=1000m) track in 80km/h with a wind speed of
60km/h when air spring inflated.
Section A-A
Section B-B
Section C-C
Section D-D
Section E-E
Section F-F
Section G-G
6 CONCLUSION
6.1 MAXIMUM KE OF ROLLING STOCK
According to the calculation result and based on the maximum KE of working condition 4
for Normal KE, in which the vehicle operated on tangent track in 90 km/h with a wind
speed of 102km/h, the Maximum KE of Rolling Stock has been furnished. The maximum
KE of Rolling Stock shown in Figure 198 complies with the Platform KE except the door
step area.
No. Coordinate
No. X Coordinate
Y
1. 0 X 5018 Y
2. 1. 892 0 5009 5018
3. 2. 1175892 4760 5009
4. 3. 11641175 40464760
5. 4. 1397 1165 39764057
6. 5. 15161517 37783777
7. 6. 1613 1613 35003500
8. 7. 16281628 31423142
9. 8. 1675 1675 31443144
10. 9. 1675 1675 30983098
11. 10. 16211621 30953095
12. 11. 16511651 10551055
13. 12. 16691669 10551055
14. 13. 16691669 10501050
14. 1650.5
15. 1650.5 1050 1050
16. 15. 16511651 10161016
17. 16. 16411641 777777
17.
18. 1505.5 1505.5 777777
19. 18. 13841384 352352
20. 19. 13501350 255255
21. 20. 12361236 115115
22. 21. 0 0 115115
In normal condition
Curved (R=1000m)
13 80km/h 87km/h 7mm
track
AW0
In normal condition
Curved (R=1000m)
14 90km/h 87km/h 6mm
track
AW0
Air spring deflated
Curved (R=1000m)
15 80km/h 60km/h 10.1mm
track
AW0
Air spring inflated
Curved (R=1000m)
16 80km/h 60km/h 12.1mm
track
AW0
Table 8 Minimum Clearance between Platform and Platform KE
Considering the extra clearance for curved track, the maximum speed passing through the
platform can be 90km/h with wind speed of 87km/h.
6.3 MAXIMUM VEHICLE SPEED PASSING THROUGH THE KE FOR PANTOGRAPH WITH
WIND SPEED OF 125KM/H
For Working Condition 7, there is infringement when the vehicle speed is 90km/h with wind
speed of 125km/h. The maximum kinematic envelopes have been calculated out for
vehicle speed below 90km/h, at intervals of 5 km/h with wind speed of 125km/h. According
to the calculation result, when the vehicle speed is 5km/h with wind speed of 125km, there
is still infringement. Refer to the Figure 199, the excess is 6.7mm. Thus, the vehicle shall
be stationary when the wind speed is 125km/h.
Minimum clearance
Working Vehicle Wind
Remarks between pantograph and
Condition speed speed
Normal KE
In normal condition
1 80km/h 87km/h Tangent track 49.2mm
AW3
In normal condition
2 80km/h 102km/h Tangent track 19.8mm
AW3
3 90km/h 87km/h In normal condition 46.2mm
Tangent track
AW3
In normal condition
4 90km/h 102km/h Tangent track 15.9mm
AW3
Air spring deflated
5 80km/h 60km/h Tangent track 56.8mm
AW3
Air spring inflated
6 80km/h 60km/h Tangent track 58.8mm
AW3
Tangent track 16.5mm
7 90km/h 125km/h
AW3 (Exceed the Normal KE)
In normal condition
8 80km/h 102km/h Tangent track 19.4mm
AW0
In normal condition
9 90km/h 102km/h Tangent track 25.4mm
AW0
Air spring deflated
10 80km/h 60km/h Tangent track 57.8mm
AW0
Air spring inflated
11 80km/h 60km/h Tangent track 59.8mm
AW0
Table 9 Minimum Clearance between Pantograph and Normal KE
The pantograph, which is 1950mm in width, is compatible with the Normal KE and
Platform KE except the working condition with a wind speed of 125km/h.
Reply to 01696_LBG_1S2_Comments
NAVI MUMBAI METRO RAIL LINE-1
CA No. 02/CIDCO/RP/SE(TP-III)/2012-13: Rail Systems
Ref. LOT No. :
Subject/Section Comment
No. GC Comments AnTaCs Response Remarks
No. in document Category
For clause 3.18.3(i) the reference to 'Table 4' shall be corrected OK.CRRC has corrected the document. Please
2 Table 1 B
to 'Table 5'.Please check and update. refer to the updated document.
For clause 3.18.3(ii) the reference to 'Table l'shall be OK.CRRC has corrected the document. Please
3 Table 1 B
corrected to 'Table 2'.Please check and update. refer to the updated document.
For clause 3.18.3(iv) the reference to 'Table l'shall be corrected OK.CRRC has corrected the document. Please
4 Table 1 B
to 'Table 2'.Please check and update. refer to the updated document.
For clause 3.18.3(v) the reference to 'Table l'shall be corrected OK.CRRC has corrected the document. Please
5 Table 1 B
to 'Table 2'.Please check and update. refer to the updated document.
For clause 3.18.3(vi) the reference to 'Table 3'shall be corrected OK.CRRC has corrected the document. Please
6 Table 1 B
to 'Table 5'.Please check and update. refer to the updated document.
For clause 3.18.3(viii) the reference to 'Table 1'shall be OK.CRRC has corrected the document. Please
7 Table 1 B
corrected to 'Table 2'.Please check and update. refer to the updated document.
In 'Remark'wherever UIC 505 is referred, please correct it to 'UIC OK.CRRC has corrected the document. Please
8 Table 2 B
505'. refer to the updated document.
Please note that as per the SOD document there is no 'Nosing' for OK.CRRC has removed 'Nosing' from Table 3.
9 Table 3 B
platform area. Please remove 'Nosing' from this table. Please refer to the updated document.
Page 1 of 2
NAVI MUMBAI METRO RAIL LINE-1
CA No. 02/CIDCO/RP/SE(TP-III)/2012-13: Rail Systems
Ref. LOT No. :
Subject/Section Comment
No. GC Comments AnTaCs Response Remarks
No. in document Category
Please update the information on this page as given below:
"For Platform KE, the tangent and curved track (R=1000m) working
conditions (working conditions 1 to 16) have been calculated in
the following pages.
With reference to clause 4.2 and 4.4 of this document, for curved
track (R=1000m), additional clearances in Platform KE have been
OK.CRRC ZELC has updated the information as
considered as per the following details:
10 Page 99 of 216 B required. Please refer to Page 99 in the
Section A-A, C-C, D-D and G-G are beyond centre pivots of bogies,
updated document.
hence, additional clearance of 33mm due to End Throw has been
taken into consideration. Section B-B and F-F are between centre
pivots of bogies, hence, additional clearance of 29mm due to Mid
Throw has been taken into consideration. While Section E-E is on
the centre pivot, no extra clearance has been considered."
For next version of the document, please submit one copy with
11 General highlighted yellow color (for marking changes) and another copy C OK.
without any color (for submitting to RDSO).
Please note that in case of any comments from RDSO, the document
12 General C OK.
may have to be further updated.
Page 2 of 2