1) The document reports the results of a maintenance test on the power sockets in the basement-2 location, listing impedance measurements and other readings for each socket. 2) Impedance measurements were taken for the phase-earth and phase-neutral connections of each socket and compared against established thresholds. 3) The test was carried out by Winstar and approved by Louvre, with the signatures and details of the testers provided.

Uploaded by

madhavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views

Loop Impedance - B2

1) The document reports the results of a maintenance test on the power sockets in the basement-2 location, listing impedance measurements and other readings for each socket. 2) Impedance measurements were taken for the phase-earth and phase-neutral connections of each socket and compared against established thresholds. 3) The test was carried out by Winstar and approved by Louvre, with the signatures and details of the testers provided.

Uploaded by

madhavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

Client: Contractor:

MAINTENANCE TEST REPORT


Date 22/12/2019 Page: 1 of 8
Location BASEMENT-2
Equipment Power Socket
Feeder Description

LOOP IMPEDANCE TEST REPORT

Phase-Earth Phase-Neutral
Socket PEFC PSC Room
Reference Impedance Prospective Impedance Prospective Reference Remarks
(ohm) earth fault (ohm) Short circuit
Current (A) current(A)
Error
GAR-3-B2-05
>2000

B2-DB15-B3 0.44 545 0.81 296 STA-4-B2-C05 PASS

B2-DB11-B3 0.35 685 0.31 773 PLT-4-B2-05 PASS

B2-DB11-B1 0.72 333 0.49 489 PLT-4-B2-04 PASS

BCC-B2-EDB-
0.43 555 0.46 519 ADM-4-B2-05 PASS
02-B4
BCC-B2-
0.43 555 0.50 477 ADM-4-B2-05 PASS
EDB02-B2
BCC-B2-
0.41 582 0.45 575 ADM-4-B2-09 PASS
EDB02-Y3
BCC-B2-
0.56 423 0.87 273 ADM-4-B2-09 PASS
EDB02-R1

B2-DB07-B2 0.30 798 0.56 427 PLT-4-B2-01 PASS

AU-B2-DB01-
0.43 553 0.42 566 PLT-3-B2-21 PASS
R6

Socket Phase-Earth Phase-Neutral Room

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 22-12-2019 22-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 22/12/2019 Page: 2 of 8
Location BASEMENT-2
Equipment Power Socket
Feeder Description

PEFC PSC
Impedance Prospective Impedance Prospective
Reference Reference Remarks
(ohm) earth fault (ohm) Short circuit
Current (A) current(A)
R-B2-DB01-B1 0.71 339 0.47 512 SDE-3-B2-01 PASS

GAR-DB07- PASS
B2-DB07-B5 0.61 393 0.97 215
B5
GAR-DB07-
B2-DB07-R1 0.62 385 0.69 345 PASS
B5

B2-DB03-Y3 0.63 379 0.62 387 PLT-3-B2-08 PASS

B2-DB03-Y3 0.55 433 0.62 685 PLT-3-B3-23 PASS

B2-DB03-R5 0.51 465 0.37 642 ST0-3-B2-01 PASS

B2-DB03-Y4 0.56 426 0.59 404 PLT-3-B2-09 PASS

B2-DB03-Y5 0.62 385 0.61 391 PLT-B2-15 PASS

B2-DB01A-B5 0.45 531 0.52 460 PLT-3-B2-16 PASS

BCC-B2- ADM-4-B2-
0.53 450 0.47 508 PASS
EDB02/B03 03
BCC-B2- ADM-4-B2-
0.43 553 0.39 609 PASS
EDB02/Y2 C01
ADM-4-B2-
B2-DB01-B3 0.42 569 0.53 451 PASS
C01

ADM-4-B2-
B2-DB01-R3 0.60 396 0.69 345 PASS
C01

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 22-12-2019 22-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 22/12/2019 Page: 3 of 8
Location BASEMENT-2
Equipment Power Socket
Feeder Description

Phase-Earth Phase-Neutral
Socket PEFC PSC Room
Reference Impedance Prospective Impedance Prospective Reference Remarks
(ohm) earth fault (ohm) Short circuit
Current (A) current(A)
B2-DB01A-Y5 0.44 542 0.51 467 PLT-3-B2-18 PASS

B2-DB01A-Y5 0.52 458 0.30 795 PLT-3-B2-17 PASS

B2-DB01A-B5 0.45 531 0.59 405 PLT-3-B2-13 PASS

B2-DB01A-B5 0.49 486 0.66 362 PLT-3-B2-14 PASS

B2-DB03-R1 0.38 626 0.43 543 PLT-3-B2-10 PASS

B2-DB03-R2 0.45 522 0.49 485 PLT-3-B2-26 PASS

B2-DB03- 0.50 477 0.43 555 PLT-3-B2-27 PASS

B2-DB03B-B1 0.47 507 0.50 477 PLT-3-B2-27 PASS

B2-DB03-B6 0.62 386 0.56 427 T01-3-B2-01 PASS

B2-DB03B-R2 0.58 410 0.55 432 ST0-B2-04 PASS

B2-DB3A-Y3 0.48 496 0.76 314 PLT-3-B2-C01 PASS

B2-DB03-R8 0.38 626 0.33 720 PLT-3-B2-04 PASS

Socket Phase-Earth Phase-Neutral Room

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 22-12-2019 22-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 22/12/2019 Page: 4 of 8
Location BASEMENT-2
Equipment Power Socket
Feeder Description

PEFC PSC
Impedance Prospective Impedance Prospective
Reference Reference Remarks
(ohm) earth fault (ohm) Short circuit
Current (A) current(A)
B2-DB01A-Y5 0.44 542 0.51 467 PLT-3-B2-18 PASS

B2-DB01A-Y5 0.52 458 0.30 795 PLT-3-B2-17 PASS

B2-DB01A-B5 0.45 531 0.59 405 PLT-3-B2-13 PASS

B2-DB01A-B5 0.49 486 0.66 362 PLT-3-B2-14 PASS

B2-DB03-R1 0.38 626 0.43 543 PLT-3-B2-10 PASS

B2-DB03-R2 0.45 522 0.49 485 PLT-3-B2-26 PASS

B2-DB03- 0.50 477 0.43 555 PLT-3-B2-27 PASS

B2-DB03B-B1 0.47 507 0.50 477 PLT-3-B2-27 PASS

B2-DB03-B6 0.62 386 0.56 427 T01-3-B2-01 PASS

B2-DB03B-R2 0.58 410 0.55 432 ST0-B2-04 PASS

B2-DB3A-Y3 0.48 496 0.76 314 PLT-3-B2-C01 PASS

B2-DB03-R8 0.38 626 0.33 720 PLT-3-B2-04 PASS

Phase-Earth Phase-Neutral
Remarks
Socket PEFC PSC Room
Impedan
Reference Impedance Prospective Prospective Reference
ce
(ohm) earth fault Short circuit
(ohm)
Current (A) current(A)

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 22-12-2019 22-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 22/12/2019 Page: 5 of 8
Location BASEMENT-2
Equipment Power Socket
Feeder Description

B2-DB03-B1 0.49 488 0.62 386 PLT-3-B2-04 PASS

PASS
B2-DB03-R5 0.78 304 0.94 253 PLT-3-B2-04

PASS
B2-DB03-R7 0.58 410 0.87 278 PLT-3-B2-04

B2-DB15-Y5 0.63 378 0.86 217 PLT-4-B2-C08 PASS

AU-B2-DB01-B6 0.61 391 0.71 337 STE-3-B2-02 PASS

AU-B2-DB01-Y6 0.62 384 0.50 475 STE-3-B2-01 PASS

B2-DB01-Y4 0.80 262 0.83 287 PLT-3-B2-16 PASS

B2-DB03-R3 0.53 449 0.53 449 PLT-3-B2-25 PASS

B2-DB03-Y7 0.48 497 0.40 597 PLT-3-B7-06 PASS

ADM-3-B2-
B2-DB03-Y3 0.56 426 0.29 823 PASS
C01
ADM-3-B2-
B2-DB03-Y1 0.46 519 0.34 702 PASS
C01

B2-DB03-A-Y6 0.56 426 0.57 419 ADM-3-B2-03 PASS

B2-DB03-R4 0.35 679 0.50 472 ADM-3-B2-03 PASS

Phase-Earth Phase-Neutral
Socket PEFC PSC Room
Reference Impedance Prospective Impedance Prospective Reference Remarks
(ohm) earth fault (ohm) Short circuit
Current (A) current(A)
B2-DB-07-B2 0.74 322 0.30 794 PLT-4-B2-02 PASS

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 22-12-2019 22-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 22/12/2019 Page: 6 of 8
Location BASEMENT-2
Equipment Power Socket
Feeder Description

B2-DB-09-Y1 0.46 515 0.50 474 PLT-4-B2-03 PASS

COORIDOR +
B2-DB-09-R2 0.55 430 0.37 639 LOADING PASS
AREA
COORIDOR +
B2-DB-11-Y2 0.88 61 0.51 465 LOADING PASS
AREA
COORIDOR +
B2-DB-11-B3 0.43 552 0.49 485 LOADING PASS
AREA
COORIDOR +
B2-DB-11-Y2 0.44 538 0.43 551 LOADING PASS
AREA
COORIDOR +
B2-DB-11-Y1 0.70 338 0.40 592 LOADING PASS
AREA
COORIDOR +
B2-DB-11-Y4 0.60 395 0.63 376 LOADING PASS
AREA
COORIDOR +
B2-DB-11A-Y4 0.35 101 0.65 365 LOADING PASS
AREA
COORIDOR +
B2-DB-11A-B3 0.98 217 0.83 285 LOADING PASS
AREA
COORIDOR +
B2-DB-11A-B3 0.92 258 0.87 272 LOADING PASS
AREA
COORIDOR +
B2-DB-13-Y1 0.90 263 0.60 395 LOADING PASS
AREA

Socket Phase-Earth Phase-Neutral Room


Reference Reference Remarks
Impedance PEFC Impedance PSC
(ohm) Prospective (ohm) Prospective
earth fault Short circuit

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 22-12-2019 22-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 22/12/2019 Page: 7 of 8
Location BASEMENT-2
Equipment Power Socket
Feeder Description

Current (A) current(A)


COORIDOR +
B2-DB-13-Y1 0.55 430 0.47 504 LOADING AREA PASS

COORIDOR +
B2-DB-13-B1 0.68 349 0.55 432 LOADING AREA PASS

COORIDOR +
B2-DB-09-R3 0.72 328 0.60 394 LOADING AREA PASS

COORIDOR +
B2-DB-09-R3 0.72 328 0.60 394 LOADING AREA PASS

COORIDOR +
B2-DB-09-R3 0.62 381 0.59 400 LOADING AREA PASS

COORIDOR +
B2-DB-11-Y3 0.59 401 0.56 422 LOADING AREA PASS

COORIDOR +
B2-DB-11-Y3 0.63 376 0.60 395 LOADING AREA PASS

COORIDOR +
B2-DB-11-Y2 0.70 338 0.45 525 LOADING AREA PASS

COORIDOR +
B2-DB-07-Y2 0.64 369 0.49 482 LOADING AREA PASS

B2-DB-09-Y1 0.33 716 0.39 606 STO-4-B2-02 PASS

B2-DB-01A-R5 0.46 514 0.58 272 STA-3-B2-03 PASS

B2-DB-01A-B5 0.30 794 0.46 517 STA-3-B2-C04 PASS

B2-DB-01-B1 0.48 496 0.38 626 STA-3-B2-C04 PASS

Socket Phase-Earth Phase-Neutral Room


Reference Reference Remarks
Impedance PEFC Impedance PSC
(ohm) Prospective (ohm) Prospective
earth fault Short circuit

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 22-12-2019 22-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 22/12/2019 Page: 8 of 8
Location BASEMENT-2
Equipment Power Socket
Feeder Description

Current (A) current(A)


B2-DB-3A-Y3 0.58 408 0.49 515 STA-3-B2-C04 PASS

B2-DB-01-Y6 0.60 394 0.59 401 SDE-3-B2-01 PASS

EB-LG-DB05- LGF Waiting


0.49 485 0.97 220 PASS
Y1 Area

EQUIPMENT USED FOR TESTING:

Instrument Name Instrument Make Type Serial No. Cal. Due. Date
Multi function meter Fluke 5522A 2597902 24-07-2020

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 22-12-2019 22-12-2019